MISTA: List of papers by authors

This page was developed to give a summary of the papers that have been presented at MISTA, sorted by the authors. It is provided to give you a quick way to check all the papers that you have published at MISTA (or in the post conference publication).

The papers are NOT complete references. To see the complete reference, click on the link to paper link.

You can view the papers in various ways.

  • All papers (full papers, abstracts and selected papers)
  • Only full papers from the conference proceedings
  • Only abstracts from the conference proceedings
  • Only selected papers published in the post conference volumes

There is also a menu under each author, so that you can just display the data for just one author.

  1. , (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)

  2. (Menu for ) All papers - Full papers - Abstracts - Selected papers

    .Akhavizadegan

  3. .Akhavizadegan, F.Akhavizadega (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  4. (Menu for .Akhavizadegan) All papers - Full papers - Abstracts - Selected papers

    .Colen

  5. .Colen, P.Cole (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)

  6. (Menu for .Colen) All papers - Full papers - Abstracts - Selected papers

    .Gravel

  7. .Gravel, M.Grave (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)

  8. (Menu for .Gravel) All papers - Full papers - Abstracts - Selected papers

    .J.Benavides

  9. .J.Benavides, A.J.Benavide (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  10. (Menu for .J.Benavides) All papers - Full papers - Abstracts - Selected papers

    .Klöcker

  11. .Klöcker, C.Klöcke (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)

  12. (Menu for .Klöcker) All papers - Full papers - Abstracts - Selected papers

    .Lopez

  13. .Lopez, P.Lope (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  14. (Menu for .Lopez) All papers - Full papers - Abstracts - Selected papers

    .Lu

  15. .Lu, K.L (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)

  16. (Menu for .Lu) All papers - Full papers - Abstracts - Selected papers

    .McCollum

  17. .McCollum, B.McCollu (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)

  18. (Menu for .McCollum) All papers - Full papers - Abstracts - Selected papers

    .Nishi

  19. .Nishi, T.Nish (2013) Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems, 65--79 (Full Paper) (link to paper)

  20. (Menu for .Nishi) All papers - Full papers - Abstracts - Selected papers

    .Oliveira

  21. .Oliveira, J.Oliveir (2013) Container Stowage and Short Sea Ship Routing Problem Optimization, 111--124 (Full Paper) (link to paper)

  22. (Menu for .Oliveira) All papers - Full papers - Abstracts - Selected papers

    .Ostler

  23. .Ostler, J.Ostle (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)

  24. (Menu for .Ostler) All papers - Full papers - Abstracts - Selected papers

    .Ritt

  25. .Ritt, M.Rit (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  26. (Menu for .Ritt) All papers - Full papers - Abstracts - Selected papers

    .Tanaka

  27. .Tanaka, S.Tanak (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)

  28. (Menu for .Tanaka) All papers - Full papers - Abstracts - Selected papers

    .Toussaint

  29. .Toussaint, H.Toussain (2013) RCPSP with Resource Transfers and Money Management, 91--110 (Full Paper) (link to paper)

  30. (Menu for .Toussaint) All papers - Full papers - Abstracts - Selected papers

    .Werner

  31. .Werner, F.Werne (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)

  32. (Menu for .Werner) All papers - Full papers - Abstracts - Selected papers

    .Wilke

  33. .Wilke, P.Wilk (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)

  34. (Menu for .Wilke) All papers - Full papers - Abstracts - Selected papers

    ?ahin

  35. ?ahin, G (2013) The Balanced Path Problem in Crew Scheduling Applications, 729--732 (Abstract) (link to paper)

  36. (Menu for ?ahin) All papers - Full papers - Abstracts - Selected papers

    Abdullah

  37. Abdullah, S (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)
  38. Abdullah, S (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  39. Abdullah, S (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)
  40. Abdullah, S (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
  41. Abdullah, S (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)

  42. (Menu for Abdullah) All papers - Full papers - Abstracts - Selected papers

    Ackermann

  43. Ackermann, H (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
  44. Ackermann, H. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)
  45. Ackermann, H (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)

  46. (Menu for Ackermann) All papers - Full papers - Abstracts - Selected papers

    Adasme

  47. Adasme, P (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
  48. Adasme, P (2014) Stochastic and semidefinite optimization for scheduling in orthogonal frequency division multiple access networks, 445--469 (Selected Paper) (link to paper)
  49. Adasme, P (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)
  50. Adasme, P (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
  51. Adasme, P. (2016) Uplink scheduling for joint wireless orthogonal frequency and time division multiple access networks, 349--366 (Selected Paper) (link to paper)

  52. (Menu for Adasme) All papers - Full papers - Abstracts - Selected papers

    Adelson-Velsky

  53. Adelson-Velsky, G (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)

  54. (Menu for Adelson-Velsky) All papers - Full papers - Abstracts - Selected papers

    Adenso-Díaz

  55. Adenso-Díaz, B (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)
  56. Adenso-Díaz, B (2005) Rule-Based System for Platform Assignment in Bus Stations, 369--379 (Selected Paper) (link to paper)
  57. Adenso-Díaz, B (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
  58. Adenso-Díaz, B (2003) Rule-Based System for Platform Assignment in Bus Stations, 696--699 (Abstract) (link to paper)

  59. (Menu for Adenso-Díaz) All papers - Full papers - Abstracts - Selected papers

    Adriaen

  60. Adriaen, M (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
  61. Adriaen, M (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)

  62. (Menu for Adriaen) All papers - Full papers - Abstracts - Selected papers

    Adriaensen

  63. Adriaensen, S (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)

  64. (Menu for Adriaensen) All papers - Full papers - Abstracts - Selected papers

    Afifi

  65. Afifi, S (2015) Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits, 859--861 (Abstract) (link to paper)

  66. (Menu for Afifi) All papers - Full papers - Abstracts - Selected papers

    Aggoune

  67. Aggoune, R (2009) Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach, 469--478 (Full Paper) (link to paper)

  68. (Menu for Aggoune) All papers - Full papers - Abstracts - Selected papers

    Aggoune-Mtalaa

  69. Aggoune-Mtalaa, W (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  70. (Menu for Aggoune-Mtalaa) All papers - Full papers - Abstracts - Selected papers

    Aghezzaf

  71. Aghezzaf, E.-H (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)
  72. Aghezzaf, E- (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)
  73. Aghezzaf, E-H. (2007) Aligning Frequencies in Cyclic Delivery Scheduling, 426--430 (Full Paper) (link to paper)

  74. (Menu for Aghezzaf) All papers - Full papers - Abstracts - Selected papers

    Agnetis

  75. Agnetis, A (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)

  76. (Menu for Agnetis) All papers - Full papers - Abstracts - Selected papers

    Aharon

  77. Aharon, G (2013) Hierarchical Control Model for Several Stochastic Network Projects, 800--800 (Abstract) (link to paper)

  78. (Menu for Aharon) All papers - Full papers - Abstracts - Selected papers

    Ahmadi

  79. Ahmadi, S (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
  80. Ahmadi, S (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)
  81. Ahmadi, S (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)

  82. (Menu for Ahmadi) All papers - Full papers - Abstracts - Selected papers

    Aickelin

  83. Aickelin, U (2003) Explicit Learning: an Effort towards Human Scheduling Algorithms, 240--243 (Abstract) (link to paper)

  84. (Menu for Aickelin) All papers - Full papers - Abstracts - Selected papers

    Akartunal?

  85. Akartunal?, K (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  86. (Menu for Akartunal?) All papers - Full papers - Abstracts - Selected papers

    Akartunali

  87. Akartunali, K (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)

  88. (Menu for Akartunali) All papers - Full papers - Abstracts - Selected papers

    Akhlaghi

  89. Akhlaghi, V. E. (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)

  90. (Menu for Akhlaghi) All papers - Full papers - Abstracts - Selected papers

    Akkan

  91. Akkan, C (2011) Improving Schedule Stability in Single-Machine Rescheduling due to New Operation Insertion, 506--518 (Abstract) (link to paper)

  92. (Menu for Akkan) All papers - Full papers - Abstracts - Selected papers

    Akrotirianakis

  93. Akrotirianakis, I (2015) An optimization-based approach for delivering radio-pharmaceuticals to medical imaging centers, 203--217 (Full Paper) (link to paper)

  94. (Menu for Akrotirianakis) All papers - Full papers - Abstracts - Selected papers

    Al-Betar

  95. Al-Betar, M. A (2009) A hybrid harmony search for university course timetabling, 157--179 (Full Paper) (link to paper)

  96. (Menu for Al-Betar) All papers - Full papers - Abstracts - Selected papers

    Al-Khair

  97. Al-Khair, W.S.A (2003) Simulation-Based Days-Off Scheduling of a Pipelines Maintenance Workforce, 524--525 (Abstract) (link to paper)

  98. (Menu for Al-Khair) All papers - Full papers - Abstracts - Selected papers

    Alefragis

  99. Alefragis, P (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  100. (Menu for Alefragis) All papers - Full papers - Abstracts - Selected papers

    Alexandridis

  101. Alexandridis, A (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)

  102. (Menu for Alexandridis) All papers - Full papers - Abstracts - Selected papers

    Alfares

  103. Alfares, H.K (2003) Simulation-Based Days-Off Scheduling of a Pipelines Maintenance Workforce, 524--525 (Abstract) (link to paper)

  104. (Menu for Alfares) All papers - Full papers - Abstracts - Selected papers

    Ali

  105. Ali, O (2015) Scheduling the operation of a phosphate pipeline for OCP: A Case Study, 622--625 (Abstract) (link to paper)

  106. (Menu for Ali) All papers - Full papers - Abstracts - Selected papers

    Alidaee

  107. Alidaee, B (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  108. (Menu for Alidaee) All papers - Full papers - Abstracts - Selected papers

    Alkan

  109. Alkan, A (2007) A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy, 394--401 (Full Paper) (link to paper)

  110. (Menu for Alkan) All papers - Full papers - Abstracts - Selected papers

    Allaoui

  111. Allaoui, H (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
  112. Allaoui, H (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
  113. Allaoui, H (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)

  114. (Menu for Allaoui) All papers - Full papers - Abstracts - Selected papers

    Almakhla?

  115. Almakhla?, A (2015) Iterated Local Search for the Generator Maintenance Scheduling Problem, 708--742 (Abstract) (link to paper)

  116. (Menu for Almakhla?) All papers - Full papers - Abstracts - Selected papers

    Almeder

  117. Almeder, C (2011) A GRASP Approach for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 557--560 (Abstract) (link to paper)
  118. Almeder, C (2009) Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 105--114 (Full Paper) (link to paper)

  119. (Menu for Almeder) All papers - Full papers - Abstracts - Selected papers

    Almeida

  120. Almeida, A (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)

  121. (Menu for Almeida) All papers - Full papers - Abstracts - Selected papers

    Almgren

  122. Almgren, T (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  123. (Menu for Almgren) All papers - Full papers - Abstracts - Selected papers

    Alonso-Pecina

  124. Alonso-Pecina, F (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)

  125. (Menu for Alonso-Pecina) All papers - Full papers - Abstracts - Selected papers

    Aloulou

  126. Aloulou, M. Al (2005) An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 223--246 (Selected Paper) (link to paper)
  127. Aloulou, M.A (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)
  128. Aloulou, M. Al (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
  129. Aloulou, M.A (2003) An Efficient Proactive Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 337--362 (Full Paper) (link to paper)

  130. (Menu for Aloulou) All papers - Full papers - Abstracts - Selected papers

    Alqudsi

  131. Alqudsi, A (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)

  132. (Menu for Alqudsi) All papers - Full papers - Abstracts - Selected papers

    Alsheddy

  133. Alsheddy, A (2011) Empowerment scheduling for a field workforce, 639--654 (Selected Paper) (link to paper)
  134. Alsheddy, A (2009) Empowerment-based Workforce Scheduling Problem, 130--144 (Full Paper) (link to paper)

  135. (Menu for Alsheddy) All papers - Full papers - Abstracts - Selected papers

    Althaus

  136. Althaus, E (2015) University Course Timetabling with Con?ict Minimization and Elective Courses, 412--428 (Full Paper) (link to paper)

  137. (Menu for Althaus) All papers - Full papers - Abstracts - Selected papers

    Andres

  138. Andres, C (2007) Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times, 439--446 (Full Paper) (link to paper)

  139. (Menu for Andres) All papers - Full papers - Abstracts - Selected papers

    Angel

  140. Angel, E (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)
  141. Angel, E (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)

  142. (Menu for Angel) All papers - Full papers - Abstracts - Selected papers

    Angelelli

  143. Angelelli, E (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)

  144. (Menu for Angelelli) All papers - Full papers - Abstracts - Selected papers

    Ansarifar

  145. Ansarifar, J (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  146. (Menu for Ansarifar) All papers - Full papers - Abstracts - Selected papers

    Aparicio

  147. Aparicio, J (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)

  148. (Menu for Aparicio) All papers - Full papers - Abstracts - Selected papers

    Aparício

  149. Aparício, J (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)

  150. (Menu for Aparício) All papers - Full papers - Abstracts - Selected papers

    Araki

  151. Araki, M (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)

  152. (Menu for Araki) All papers - Full papers - Abstracts - Selected papers

    Arbaoui

  153. Arbaoui, T (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)

  154. (Menu for Arbaoui) All papers - Full papers - Abstracts - Selected papers

    Arkhipov

  155. Arkhipov, D (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)

  156. (Menu for Arkhipov) All papers - Full papers - Abstracts - Selected papers

    Armstrong

  157. Armstrong, R (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
  158. Armstrong, R (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)

  159. (Menu for Armstrong) All papers - Full papers - Abstracts - Selected papers

    Arroyo

  160. Arroyo, J. E. C. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)

  161. (Menu for Arroyo) All papers - Full papers - Abstracts - Selected papers

    Artiba

  162. Artiba, A (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
  163. Artiba, A (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)
  164. Artiba, A (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)

  165. (Menu for Artiba) All papers - Full papers - Abstracts - Selected papers

    Artigues

  166. Artigues, C (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)
  167. Artigues, C. (2016) Line search method for solving a non-preemptive strictly periodic scheduling problem, 227--243 (Selected Paper) (link to paper)
  168. Artigues, C (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)
  169. Artigues, C (2013) Line search method for solving a non-preemptive strictly periodic scheduling problem, 356--371 (Full Paper) (link to paper)
  170. Artigues, C (2013) MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 815--819 (Full Paper) (link to paper)
  171. Artigues, C (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
  172. Artigues, C (2008) A branch and bound method for the job-shop problem with sequence-dependent setup times, 135--159 (Selected Paper) (link to paper)

  173. (Menu for Artigues) All papers - Full papers - Abstracts - Selected papers

    Asco

  174. Asco, A (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)

  175. (Menu for Asco) All papers - Full papers - Abstracts - Selected papers

    Ascó

  176. Ascó, A. (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)

  177. (Menu for Ascó) All papers - Full papers - Abstracts - Selected papers

    Asmuni

  178. Asmuni, H. bi (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)
  179. Asmuni, H (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  180. Asmuni, H (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)

  181. (Menu for Asmuni) All papers - Full papers - Abstracts - Selected papers

    Asta

  182. Asta, S (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)

  183. (Menu for Asta) All papers - Full papers - Abstracts - Selected papers

    Atakan

  184. Atakan, S (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  185. (Menu for Atakan) All papers - Full papers - Abstracts - Selected papers

    Atkin

  186. Atkin, J. A (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  187. Atkin, J. A. D (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
  188. Atkin, J. A. D (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)
  189. Atkin, J. A (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
  190. Atkin, J.A.D (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
  191. Atkin, J. A. D (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
  192. Atkin, J. A. D (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)

  193. (Menu for Atkin) All papers - Full papers - Abstracts - Selected papers

    Audenaert

  194. Audenaert, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  195. (Menu for Audenaert) All papers - Full papers - Abstracts - Selected papers

    Aykin

  196. Aykin, T (2005) Skills-Based Agent Scheduling at Call Centers, 515--515 (Abstract) (link to paper)

  197. (Menu for Aykin) All papers - Full papers - Abstracts - Selected papers

    Ayob

  198. Ayob, M (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
  199. Ayob, M (2003) An Investigation of an Adaptive Scheduling Approach for Multi Head Placement Machines, 363--381 (Full Paper) (link to paper)
  200. Ayob, M (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)

  201. (Menu for Ayob) All papers - Full papers - Abstracts - Selected papers

    Aziz

  202. Aziz, Z. Ab (2009) An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem, 823--826 (Abstract) (link to paper)

  203. (Menu for Aziz) All papers - Full papers - Abstracts - Selected papers

    Azouni

  204. Azouni, A (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)

  205. (Menu for Azouni) All papers - Full papers - Abstracts - Selected papers

    Baarsma

  206. Baarsma, H (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)

  207. (Menu for Baarsma) All papers - Full papers - Abstracts - Selected papers

    Baber

  208. Baber, F (2003) A Constraint Ordering Heuristic for Scheduling Problems, 476--491 (Full Paper) (link to paper)

  209. (Menu for Baber) All papers - Full papers - Abstracts - Selected papers

    Babic

  210. Babic, O (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  211. (Menu for Babic) All papers - Full papers - Abstracts - Selected papers

    Bagger

  212. Bagger, N-C. F. (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)

  213. (Menu for Bagger) All papers - Full papers - Abstracts - Selected papers

    Bai

  214. Bai, R (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  215. Bai, R (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)

  216. (Menu for Bai) All papers - Full papers - Abstracts - Selected papers

    Baille

  217. Baille, F (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)
  218. Baille, F (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)

  219. (Menu for Baille) All papers - Full papers - Abstracts - Selected papers

    Baker

  220. Baker, K. R (2011) Three heuristic procedures for the stochastic, two-machine flow shop problem, 445--454 (Selected Paper) (link to paper)
  221. Baker, K. R (2009) Three Heuristic Procedures for the Stochastic Flow Shop Problem, 330--340 (Full Paper) (link to paper)

  222. (Menu for Baker) All papers - Full papers - Abstracts - Selected papers

    Balas

  223. Balas, E (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)
  224. Balas, E (2005) Good Neighborhoods And Well-matched Neighborhoods, 2--2 (Abstract) (link to paper)

  225. (Menu for Balas) All papers - Full papers - Abstracts - Selected papers

    Balasubramanian

  226. Balasubramanian, H (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
  227. Balasubramanian, H (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  228. Balasubramanian, H (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  229. Balasubramanian, H (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
  230. Balasubramanian, H (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)

  231. (Menu for Balasubramanian) All papers - Full papers - Abstracts - Selected papers

    Baltar

  232. Baltar, D.D (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)

  233. (Menu for Baltar) All papers - Full papers - Abstracts - Selected papers

    Bampis

  234. Bampis, E (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)
  235. Bampis, E (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)
  236. Bampis, E (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)
  237. Bampis, E (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)

  238. (Menu for Bampis) All papers - Full papers - Abstracts - Selected papers

    Bansal

  239. Bansal, N (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
  240. Bansal, N (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)

  241. (Menu for Bansal) All papers - Full papers - Abstracts - Selected papers

    Baptiste

  242. Baptiste, P (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)
  243. Baptiste, P (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  244. Baptiste, P (2009) Preface, 563--564 (Selected Paper) (link to paper)
  245. Baptiste, P (2005) Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints, 193--195 (Abstract) (link to paper)
  246. Baptiste, P (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
  247. Baptiste, P (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)

  248. (Menu for Baptiste) All papers - Full papers - Abstracts - Selected papers

    Barbosa

  249. Barbosa, A (2015) Solving the staff scheduling problem in a retail company, 611--613 (Abstract) (link to paper)
  250. Barbosa, J. J. G. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
  251. Barbosa, A (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)
  252. Barbosa, A. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)

  253. (Menu for Barbosa) All papers - Full papers - Abstracts - Selected papers

    Barbosa-Póvoa

  254. Barbosa-Póvoa, A (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)
  255. Barbosa-Póvoa, A (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)

  256. (Menu for Barbosa-Póvoa) All papers - Full papers - Abstracts - Selected papers

    Barbulescu

  257. Barbulescu, L. V (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
  258. Barbulescu, L (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)

  259. (Menu for Barbulescu) All papers - Full papers - Abstracts - Selected papers

    Bard

  260. Bard, J. F (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)

  261. (Menu for Bard) All papers - Full papers - Abstracts - Selected papers

    Bargiela

  262. Bargiela, A (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)

  263. (Menu for Bargiela) All papers - Full papers - Abstracts - Selected papers

    Barnhart

  264. Barnhart, C (2011) A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty, 352--365 (Full Paper) (link to paper)
  265. Barnhart, C (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)

  266. (Menu for Barnhart) All papers - Full papers - Abstracts - Selected papers

    Baron

  267. Baron, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)

  268. (Menu for Baron) All papers - Full papers - Abstracts - Selected papers

    Barone

  269. Barone, R (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)

  270. (Menu for Barone) All papers - Full papers - Abstracts - Selected papers

    Bartels

  271. Bartels, J-H. (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)

  272. (Menu for Bartels) All papers - Full papers - Abstracts - Selected papers

    Barth

  273. Barth, T.C (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)

  274. (Menu for Barth) All papers - Full papers - Abstracts - Selected papers

    Barták

  275. Barták, R (2005) Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows, 552--560 (Abstract) (link to paper)
  276. Barták, R (2015) Resource Failure Recovery in Production Scheduling, 852--858 (Abstract) (link to paper)
  277. Barták, R (2009) Preemptive scheduling with precedences and alternative resources, 518--530 (Full Paper) (link to paper)
  278. Barták, R (2003) Integrating Planning into Production Scheduling: Visopt Shopfloor System, 259--278 (Full Paper) (link to paper)
  279. Barták, R (2009) A local approach to automated correction of violated precedence and resource constraints in manually altered schedules, 507--517 (Full Paper) (link to paper)
  280. Barták, R (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)

  281. (Menu for Barták) All papers - Full papers - Abstracts - Selected papers

    Battistutta

  282. Battistutta, M (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)

  283. (Menu for Battistutta) All papers - Full papers - Abstracts - Selected papers

    Baumann

  284. Baumann, M (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)
  285. Baumann, P (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)
  286. Baumann, P (2011) Minimizing changeover times of a make-and-pack production process: model and case study, 539--541 (Abstract) (link to paper)
  287. Baumann, P (2015) A lexicographic goal programming approach for staff assignment with acceptance levels, 526--540 (Full Paper) (link to paper)

  288. (Menu for Baumann) All papers - Full papers - Abstracts - Selected papers

    Baumelt

  289. Baumelt, Z (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)

  290. (Menu for Baumelt) All papers - Full papers - Abstracts - Selected papers

    Baumgartner

  291. Baumgartner, A (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)

  292. (Menu for Baumgartner) All papers - Full papers - Abstracts - Selected papers

    Bautista

  293. Bautista, J (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
  294. Bautista, J (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)

  295. (Menu for Bautista) All papers - Full papers - Abstracts - Selected papers

    Baykasoglu

  296. Baykasoglu, A (2015) A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company, 656--658 (Abstract) (link to paper)

  297. (Menu for Baykasoglu) All papers - Full papers - Abstracts - Selected papers

    Beck

  298. Beck, J.C (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)

  299. (Menu for Beck) All papers - Full papers - Abstracts - Selected papers

    Bedoya-Valencia

  300. Bedoya-Valencia, L (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)

  301. (Menu for Bedoya-Valencia) All papers - Full papers - Abstracts - Selected papers

    Belien

  302. Belien, J (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  303. Belien, J (2013) Building university course timetables with minimized resulting student flows, 737--740 (Abstract) (link to paper)
  304. Belien, J (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)

  305. (Menu for Belien) All papers - Full papers - Abstracts - Selected papers

    Beliën

  306. Beliën, J (2005) Integrating nurse and surgery scheduling, 408--409 (Abstract) (link to paper)
  307. Beliën, J (2003) Scheduling Trainees at a Hospital Department, 224--225 (Abstract) (link to paper)
  308. Beliën, J (2009) Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company, 724--726 (Abstract) (link to paper)

  309. (Menu for Beliën) All papers - Full papers - Abstracts - Selected papers

    Bellenguez-Morineau

  310. Bellenguez-Morineau, O (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)
  311. Bellenguez-Morineau, O (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)

  312. (Menu for Bellenguez-Morineau) All papers - Full papers - Abstracts - Selected papers

    Bellio

  313. Bellio, R (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)

  314. (Menu for Bellio) All papers - Full papers - Abstracts - Selected papers

    Bello

  315. Bello, R (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)

  316. (Menu for Bello) All papers - Full papers - Abstracts - Selected papers

    Belouadah

  317. Belouadah, H (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  318. (Menu for Belouadah) All papers - Full papers - Abstracts - Selected papers

    Belulu

  319. Belulu, A (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  320. (Menu for Belulu) All papers - Full papers - Abstracts - Selected papers

    Benabid

  321. Benabid, A (2011) Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, 511--522 (Selected Paper) (link to paper)
  322. Benabid, A (2009) Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays, 254--265 (Full Paper) (link to paper)

  323. (Menu for Benabid) All papers - Full papers - Abstracts - Selected papers

    Benmansour

  324. Benmansour, R (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)
  325. Benmansour, R (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
  326. Benmansour, R (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  327. (Menu for Benmansour) All papers - Full papers - Abstracts - Selected papers

    Bennell

  328. Bennell, J. A (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)

  329. (Menu for Bennell) All papers - Full papers - Abstracts - Selected papers

    Bergh

  330. Bergh, J. V. (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  331. Bergh, J. V. (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)

  332. (Menu for Bergh) All papers - Full papers - Abstracts - Selected papers

    Berghe

  333. Berghe, G.Van de (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)

  334. (Menu for Berghe) All papers - Full papers - Abstracts - Selected papers

    Berghman

  335. Berghman, L (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)
  336. Berghman, L (2009) Solving a dock assignment problem as a three-stage flexible flow-shop problem, 752--755 (Abstract) (link to paper)

  337. (Menu for Berghman) All papers - Full papers - Abstracts - Selected papers

    Berlinska

  338. Berlinska, J (2009) Heuristics for Divisible Loads Scheduling in Systems with Limited Memory, 321--329 (Full Paper) (link to paper)
  339. Berlinska, J (2013) Mitigating Partitioning Skew in MapReduce Computations, 80--90 (Full Paper) (link to paper)

  340. (Menu for Berlinska) All papers - Full papers - Abstracts - Selected papers

    Berman

  341. Berman, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
  342. Berman, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)

  343. (Menu for Berman) All papers - Full papers - Abstracts - Selected papers

    Bertocchi

  344. Bertocchi, M (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  345. (Menu for Bertocchi) All papers - Full papers - Abstracts - Selected papers

    Bessler

  346. Bessler, S (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  347. (Menu for Bessler) All papers - Full papers - Abstracts - Selected papers

    Beyrouthy

  348. Beyrouthy, C (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)

  349. (Menu for Beyrouthy) All papers - Full papers - Abstracts - Selected papers

    Bhattacharya

  350. Bhattacharya, S (2008) A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industry, 293--313 (Selected Paper) (link to paper)
  351. Bhattacharya, S (2015) Continuous Time Model for Scheduling Operations in Cascaded Continuous Processing Units with Multiple Due Dates, 63--77 (Full Paper) (link to paper)
  352. Bhattacharya, S (2005) A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results, 258--274 (Full Paper) (link to paper)

  353. (Menu for Bhattacharya) All papers - Full papers - Abstracts - Selected papers

    Bian

  354. Bian, F (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  355. Bian, F (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  356. (Menu for Bian) All papers - Full papers - Abstracts - Selected papers

    Bierwirth

  357. Bierwirth, C (2011) Computational Comparison of Neighbourhoods for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective, 536--538 (Abstract) (link to paper)
  358. Bierwirth, C (2013) A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness, 613--616 (Abstract) (link to paper)

  359. (Menu for Bierwirth) All papers - Full papers - Abstracts - Selected papers

    Bilgin

  360. Bilgin, B (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)

  361. (Menu for Bilgin) All papers - Full papers - Abstracts - Selected papers

    Bilginturk

  362. Bilginturk, Z (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)

  363. (Menu for Bilginturk) All papers - Full papers - Abstracts - Selected papers

    Billaut

  364. Billaut, J-C. (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)
  365. Billaut, J-C. (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)
  366. Billaut, J-C. (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)
  367. Billaut, JC (2005) A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements, 671--672 (Abstract) (link to paper)

  368. (Menu for Billaut) All papers - Full papers - Abstracts - Selected papers

    Bini

  369. Bini, E (2009) Modeling Preemptive EDF and FP by Integer Variables, 77--84 (Full Paper) (link to paper)

  370. (Menu for Bini) All papers - Full papers - Abstracts - Selected papers

    Bispo

  371. Bispo, C. F (2011) Single server scheduling problem: Optimal policy for convex costs depends on arrival rates, 275--296 (Full Paper) (link to paper)

  372. (Menu for Bispo) All papers - Full papers - Abstracts - Selected papers

    Bist

  373. Bist, V (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)

  374. (Menu for Bist) All papers - Full papers - Abstracts - Selected papers

    Bitar

  375. Bitar, A. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
  376. Bitar, A (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)

  377. (Menu for Bitar) All papers - Full papers - Abstracts - Selected papers

    Biyani

  378. Biyani, V (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)

  379. (Menu for Biyani) All papers - Full papers - Abstracts - Selected papers

    Blazewicz

  380. Blazewicz, J (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)
  381. Blazewicz, J (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  382. Blazewicz, J (2011) Preface, 407--407 (Selected Paper) (link to paper)
  383. Blazewicz, J. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
  384. Blazewicz, J (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
  385. Blazewicz, J (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)

  386. (Menu for Blazewicz) All papers - Full papers - Abstracts - Selected papers

    Bockman

  387. Bockman, F (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)

  388. (Menu for Bockman) All papers - Full papers - Abstracts - Selected papers

    Bocquillon

  389. Bocquillon, R (2013) Minimizing the dissemination length in the one-datum-unit data transfer problem, 587--589 (Abstract) (link to paper)

  390. (Menu for Bocquillon) All papers - Full papers - Abstracts - Selected papers

    Bontoux

  391. Bontoux, B (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)

  392. (Menu for Bontoux) All papers - Full papers - Abstracts - Selected papers

    Boone

  393. Boone, A (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)

  394. (Menu for Boone) All papers - Full papers - Abstracts - Selected papers

    Bora

  395. Bora, S (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)

  396. (Menu for Bora) All papers - Full papers - Abstracts - Selected papers

    Borba

  397. Borba, L. M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  398. (Menu for Borba) All papers - Full papers - Abstracts - Selected papers

    Borenstein

  399. Borenstein, D (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  400. (Menu for Borenstein) All papers - Full papers - Abstracts - Selected papers

    Borgulya

  401. Borgulya, I (2009) Solving the Undirected Capacitated Arc Routing Problem with a memory based Method, 827--830 (Abstract) (link to paper)
  402. Borgulya, I (2011) An Evolutionary Algorithm for the large Size One-Commodity Pickup and Delivery Travelling Salesman Problems, 127--136 (Full Paper) (link to paper)

  403. (Menu for Borgulya) All papers - Full papers - Abstracts - Selected papers

    Borne

  404. Borne, P (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)

  405. (Menu for Borne) All papers - Full papers - Abstracts - Selected papers

    Borodin

  406. Borodin, D (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
  407. Borodin, D (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)

  408. (Menu for Borodin) All papers - Full papers - Abstracts - Selected papers

    Bose

  409. Bose, S.K (2015) Continuous Time Model for Scheduling Operations in Cascaded Continuous Processing Units with Multiple Due Dates, 63--77 (Full Paper) (link to paper)
  410. Bose, S. K. (2005) A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results, 258--274 (Full Paper) (link to paper)
  411. Bose, S. K. (2008) A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industry, 293--313 (Selected Paper) (link to paper)

  412. (Menu for Bose) All papers - Full papers - Abstracts - Selected papers

    Bou?et

  413. Bou?et, J-P. (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)

  414. (Menu for Bou?et) All papers - Full papers - Abstracts - Selected papers

    Boudhar

  415. Boudhar, M (2007) Scheduling with Special Case of Multipurpose Machines, 88--95 (Full Paper) (link to paper)

  416. (Menu for Boudhar) All papers - Full papers - Abstracts - Selected papers

    Boudier

  417. Boudier, I.S (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)

  418. (Menu for Boudier) All papers - Full papers - Abstracts - Selected papers

    Bouibede-Hocine

  419. Bouibede-Hocine, K (2005) Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria, 123--131 (Full Paper) (link to paper)

  420. (Menu for Bouibede-Hocine) All papers - Full papers - Abstracts - Selected papers

    Bouly

  421. Bouly, H (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)

  422. (Menu for Bouly) All papers - Full papers - Abstracts - Selected papers

    Bouquard

  423. Bouquard, J-L. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)
  424. Bouquard, J-L. (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)

  425. (Menu for Bouquard) All papers - Full papers - Abstracts - Selected papers

    Bourreau

  426. Bourreau, E (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)

  427. (Menu for Bourreau) All papers - Full papers - Abstracts - Selected papers

    Bouvry

  428. Bouvry, P (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
  429. Bouvry, P (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  430. (Menu for Bouvry) All papers - Full papers - Abstracts - Selected papers

    Bouyahia

  431. Bouyahia, Z (2015) Stability of probabilistic scheduling problems with precedence constraints and weighted completion time objective, 189--202 (Full Paper) (link to paper)

  432. (Menu for Bouyahia) All papers - Full papers - Abstracts - Selected papers

    Bouzouia

  433. Bouzouia, B (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)

  434. (Menu for Bouzouia) All papers - Full papers - Abstracts - Selected papers

    Bozejko

  435. Bozejko, W (2007) A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times, 96--103 (Full Paper) (link to paper)
  436. Bozejko, W (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)

  437. (Menu for Bozejko) All papers - Full papers - Abstracts - Selected papers

    Braeckmans

  438. Braeckmans, K (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)

  439. (Menu for Braeckmans) All papers - Full papers - Abstracts - Selected papers

    Brandao

  440. Brandao, J.S (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  441. (Menu for Brandao) All papers - Full papers - Abstracts - Selected papers

    Brandinu

  442. Brandinu, G (2011) An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 137--145 (Full Paper) (link to paper)

  443. (Menu for Brandinu) All papers - Full papers - Abstracts - Selected papers

    Branke

  444. Branke, J (2003) Task Scheduling under Gang Constraints, 506--523 (Full Paper) (link to paper)
  445. Branke, J (2005) Task Scheduling under Gang Constraints, 113--130 (Selected Paper) (link to paper)

  446. (Menu for Branke) All papers - Full papers - Abstracts - Selected papers

    Bransinu

  447. Bransinu, G (2014) A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 621--629 (Selected Paper) (link to paper)

  448. (Menu for Bransinu) All papers - Full papers - Abstracts - Selected papers

    Braun

  449. Braun, O (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)

  450. (Menu for Braun) All papers - Full papers - Abstracts - Selected papers

    Braune

  451. Braune, R (2015) Packing-based approaches for a discrete malleable task schedulingproblem, 888--891 (Abstract) (link to paper)

  452. (Menu for Braune) All papers - Full papers - Abstracts - Selected papers

    Brauner

  453. Brauner, N (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
  454. Brauner, N. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
  455. Brauner, N (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)
  456. Brauner, N (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
  457. Brauner, N (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)
  458. Brauner, N (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)

  459. (Menu for Brauner) All papers - Full papers - Abstracts - Selected papers

    Briand

  460. Briand, C (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
  461. Briand, C (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
  462. Briand, C (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)

  463. (Menu for Briand) All papers - Full papers - Abstracts - Selected papers

    Bril

  464. Bril, R. J (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)

  465. (Menu for Bril) All papers - Full papers - Abstracts - Selected papers

    Bronnikov

  466. Bronnikov, S (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  467. (Menu for Bronnikov) All papers - Full papers - Abstracts - Selected papers

    Brucker

  468. Brucker, P (2008) Cyclic job shop scheduling problems with blocking, 161--181 (Selected Paper) (link to paper)
  469. Brucker, P (2005) Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking, 107--108 (Abstract) (link to paper)
  470. Brucker, P (2007) The Job-Shop Problem: Old and New Challenges, 15--22 (Full Paper) (link to paper)
  471. Brucker, P (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)

  472. (Menu for Brucker) All papers - Full papers - Abstracts - Selected papers

    Bruno

  473. Bruno, G (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)

  474. (Menu for Bruno) All papers - Full papers - Abstracts - Selected papers

    Bräysy

  475. Bräysy, O (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)

  476. (Menu for Bräysy) All papers - Full papers - Abstracts - Selected papers

    Bucar

  477. Bucar, D (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  478. (Menu for Bucar) All papers - Full papers - Abstracts - Selected papers

    Bukata

  479. Bukata, L (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)

  480. (Menu for Bukata) All papers - Full papers - Abstracts - Selected papers

    Bulbul

  481. Bulbul, K (2005) Job Shop Scheduling With Earliness, Tardiness And Intermediate Inventory Holding Costs, 188--192 (Abstract) (link to paper)

  482. (Menu for Bulbul) All papers - Full papers - Abstracts - Selected papers

    Bunde

  483. Bunde, D. P (2005) Scheduling On A Single Machine To Minimize Total Flow Time With Job Rejections, 562--572 (Full Paper) (link to paper)

  484. (Menu for Bunde) All papers - Full papers - Abstracts - Selected papers

    Burda

  485. Burda, R (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  486. (Menu for Burda) All papers - Full papers - Abstracts - Selected papers

    Burgelman

  487. Burgelman, J (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)

  488. (Menu for Burgelman) All papers - Full papers - Abstracts - Selected papers

    Burke

  489. Burke, E. K (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
  490. Burke, E. K (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
  491. Burke, E. K (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
  492. Burke, E. K (2011) Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem, 335--351 (Full Paper) (link to paper)
  493. Burke, E. K (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
  494. Burke, E. K (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
  495. Burke, E. K (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)
  496. Burke, E. K (2009) Multilevel search for choosing hyper-heuristics, 788--789 (Abstract) (link to paper)
  497. Burke, E (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
  498. Burke, E. K (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
  499. Burke, E. K (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  500. Burke, E. K (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  501. Burke, E. K (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
  502. Burke, E (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
  503. Burke, E (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
  504. Burke, E. K (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  505. Burke, E. K (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
  506. Burke, E. K (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
  507. Burke, E. K (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  508. Burke, E (2003) Scheduling Nurses Using a Tabu-Search Hyperheuristic, 197--219 (Full Paper) (link to paper)
  509. Burke, E. K (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)
  510. Burke, E (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
  511. Burke, E. K (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  512. Burke, E. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  513. Burke, E. K (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)
  514. Burke, E. K (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)
  515. Burke, E. K (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  516. Burke, E. K (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
  517. Burke, E (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  518. Burke, E. K (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  519. Burke, E. K (2007) Adaptive Decomposition and Construction for Examination Timetabling Problems, 418--425 (Full Paper) (link to paper)
  520. Burke, E. K (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)

  521. (Menu for Burke) All papers - Full papers - Abstracts - Selected papers

    Buscaylet

  522. Buscaylet, F (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)

  523. (Menu for Buscaylet) All papers - Full papers - Abstracts - Selected papers

    Buscher

  524. Buscher, U (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)
  525. Buscher, U (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)

  526. (Menu for Buscher) All papers - Full papers - Abstracts - Selected papers

    Buzon

  527. Buzon, I (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  528. (Menu for Buzon) All papers - Full papers - Abstracts - Selected papers

    Byde

  529. Byde, A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  530. (Menu for Byde) All papers - Full papers - Abstracts - Selected papers

    Bykov

  531. Bykov, Y (2013) An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems, 691--693 (Abstract) (link to paper)
  532. Bykov, Y. (2016) A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling, 479--492 (Selected Paper) (link to paper)

  533. (Menu for Bykov) All papers - Full papers - Abstracts - Selected papers

    Bülbül

  534. Bülbül, K (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  535. (Menu for Bülbül) All papers - Full papers - Abstracts - Selected papers

    Bürgy

  536. Bürgy, R (2011) Optimal Job Insertion in the No-Wait Job Shop, 553--556 (Abstract) (link to paper)

  537. (Menu for Bürgy) All papers - Full papers - Abstracts - Selected papers

    Cai

  538. Cai, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)

  539. (Menu for Cai) All papers - Full papers - Abstracts - Selected papers

    Cangalovic

  540. Cangalovic, M (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  541. (Menu for Cangalovic) All papers - Full papers - Abstracts - Selected papers

    Capek

  542. Capek, R (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)

  543. (Menu for Capek) All papers - Full papers - Abstracts - Selected papers

    Carlier

  544. Carlier, J (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
  545. Carlier, J (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)
  546. Carlier, J (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)

  547. (Menu for Carlier) All papers - Full papers - Abstracts - Selected papers

    Carniel

  548. Carniel, G.M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  549. (Menu for Carniel) All papers - Full papers - Abstracts - Selected papers

    Carrano

  550. Carrano, E. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
  551. Carrano, E.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)

  552. (Menu for Carrano) All papers - Full papers - Abstracts - Selected papers

    Carvalho

  553. Carvalho, M. A. M (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)
  554. Carvalho, M. A.M (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)

  555. (Menu for Carvalho) All papers - Full papers - Abstracts - Selected papers

    Cegarra

  556. Cegarra, J (2003) From Human Heuristics to the Design of Scheduling Interfaces, 236--239 (Abstract) (link to paper)

  557. (Menu for Cegarra) All papers - Full papers - Abstracts - Selected papers

    Cepek

  558. Cepek, O (2005) Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows, 552--560 (Abstract) (link to paper)

  559. (Menu for Cepek) All papers - Full papers - Abstracts - Selected papers

    Cerdeira

  560. Cerdeira, J. O (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)

  561. (Menu for Cerdeira) All papers - Full papers - Abstracts - Selected papers

    Ceschia

  562. Ceschia, S (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
  563. Ceschia, S (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
  564. Ceschia, S (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
  565. Ceschia, S (2013) The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays, 646--648 (Abstract) (link to paper)
  566. Ceschia, S (2009) Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs, 594--605 (Full Paper) (link to paper)
  567. Ceschia, S. (2016) Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays, 377--389 (Selected Paper) (link to paper)

  568. (Menu for Ceschia) All papers - Full papers - Abstracts - Selected papers

    Cesta

  569. Cesta, A (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
  570. Cesta, A (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
  571. Cesta, A (2007) Walk the (Time-)Line: Scheduling and Execution, 23--23 (Full Paper) (link to paper)

  572. (Menu for Cesta) All papers - Full papers - Abstracts - Selected papers

    Chaabane

  573. Chaabane, S (2003) Operating Theatre Management, 220--223 (Abstract) (link to paper)

  574. (Menu for Chaabane) All papers - Full papers - Abstracts - Selected papers

    Chakhlevitch

  575. Chakhlevitch, K (2009) Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials, 782--783 (Abstract) (link to paper)

  576. (Menu for Chakhlevitch) All papers - Full papers - Abstracts - Selected papers

    Chakraborty

  577. Chakraborty, A (2015) An optimization-based approach for delivering radio-pharmaceuticals to medical imaging centers, 203--217 (Full Paper) (link to paper)

  578. (Menu for Chakraborty) All papers - Full papers - Abstracts - Selected papers

    Chan

  579. Chan, P (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  580. (Menu for Chan) All papers - Full papers - Abstracts - Selected papers

    Chang

  581. Chang, P-C. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)

  582. (Menu for Chang) All papers - Full papers - Abstracts - Selected papers

    Chaovalitwongse

  583. Chaovalitwongse, W. Ar (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)

  584. (Menu for Chaovalitwongse) All papers - Full papers - Abstracts - Selected papers

    Charalambous

  585. Charalambous, C (2011) Hybridizing local search with MIP for unrelated parallel machine scheduling problems with makespan minimization, 529--531 (Abstract) (link to paper)

  586. (Menu for Charalambous) All papers - Full papers - Abstracts - Selected papers

    Chase

  587. Chase, D (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)

  588. (Menu for Chase) All papers - Full papers - Abstracts - Selected papers

    Chen

  589. Chen, M-C. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  590. Chen, S-H. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  591. Chen, M (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)
  592. Chen, B (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
  593. Chen, C (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
  594. Chen, Y-M. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  595. Chen, Z-L. (2005) Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost, 549--550 (Abstract) (link to paper)

  596. (Menu for Chen) All papers - Full papers - Abstracts - Selected papers

    Cheng

  597. Cheng, E (2007) A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem, 267--275 (Full Paper) (link to paper)
  598. Cheng, P (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
  599. Cheng, P. C- (2005) Graphical Tools for Heuristic Visualization, 658--667 (Full Paper) (link to paper)
  600. Cheng, T.C.E (2003) Customer Order Scheduling to Minimize Total Weighted Completion Time, 409--416 (Abstract) (link to paper)
  601. Cheng, T.C E (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  602. Cheng, J (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  603. (Menu for Cheng) All papers - Full papers - Abstracts - Selected papers

    Cheriere

  604. Cheriere, N. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  605. (Menu for Cheriere) All papers - Full papers - Abstracts - Selected papers

    Choi

  606. Choi, J.Y (2015) An Efficient simulated annealing for two-agent scheduling with exponential job-dependent position-based learning consideration, 601--603 (Abstract) (link to paper)

  607. (Menu for Choi) All papers - Full papers - Abstracts - Selected papers

    Chopin

  608. Chopin, A (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)

  609. (Menu for Chopin) All papers - Full papers - Abstracts - Selected papers

    Chou

  610. Chou, S-Y. (2005) A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties, 299--314 (Full Paper) (link to paper)

  611. (Menu for Chou) All papers - Full papers - Abstracts - Selected papers

    Chretienne

  612. Chretienne, P (2013) Homogeneously non-idling schedules of unit-time jobs on identical parallel machines, 39--54 (Full Paper) (link to paper)
  613. Chretienne, P (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)
  614. Chretienne, V. J. P (2013) Minimizing the number of late jobs on parallel machines with alpha time windows, 206--217 (Full Paper) (link to paper)
  615. Chretienne, P (2007) Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs, 561--563 (Abstract) (link to paper)

  616. (Menu for Chretienne) All papers - Full papers - Abstracts - Selected papers

    Christiaens

  617. Christiaens, J (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)

  618. (Menu for Christiaens) All papers - Full papers - Abstracts - Selected papers

    Chrétienne

  619. Chrétienne, P (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)

  620. (Menu for Chrétienne) All papers - Full papers - Abstracts - Selected papers

    Chung

  621. Chung, C (2015) Fairness in employee scheduling, 687--698 (Abstract) (link to paper)

  622. (Menu for Chung) All papers - Full papers - Abstracts - Selected papers

    Ciavotta

  623. Ciavotta, M (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)

  624. (Menu for Ciavotta) All papers - Full papers - Abstracts - Selected papers

    Clark

  625. Clark, M.D (2013) Heuristic Pruning Methods For The Robust Shortest Path Problem, 767--769 (Abstract) (link to paper)

  626. (Menu for Clark) All papers - Full papers - Abstracts - Selected papers

    Co?man

  627. Co?man, E (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)

  628. (Menu for Co?man) All papers - Full papers - Abstracts - Selected papers

    Coban

  629. Coban, B (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)

  630. (Menu for Coban) All papers - Full papers - Abstracts - Selected papers

    Coffman

  631. Coffman, E (2005) Seamless Download Scheduling in Computer Networks, 3--3 (Abstract) (link to paper)

  632. (Menu for Coffman) All papers - Full papers - Abstracts - Selected papers

    Coolen

  633. Coolen, K (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)

  634. (Menu for Coolen) All papers - Full papers - Abstracts - Selected papers

    Coppersmith

  635. Coppersmith, D (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)

  636. (Menu for Coppersmith) All papers - Full papers - Abstracts - Selected papers

    Cortellessa

  637. Cortellessa, G (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
  638. Cortellessa, G (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)

  639. (Menu for Cortellessa) All papers - Full papers - Abstracts - Selected papers

    Cortes

  640. Cortes, R (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)

  641. (Menu for Cortes) All papers - Full papers - Abstracts - Selected papers

    Cowling

  642. Cowling, P (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)

  643. (Menu for Cowling) All papers - Full papers - Abstracts - Selected papers

    Creemers

  644. Creemers, S (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
  645. Creemers, S (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)

  646. (Menu for Creemers) All papers - Full papers - Abstracts - Selected papers

    Critchley

  647. Critchley, M (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)
  648. Critchley, M (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)

  649. (Menu for Critchley) All papers - Full papers - Abstracts - Selected papers

    Croce

  650. Croce, F. D (2011) Minimizing the sum of quadratic completion times on two identical parallel machines, 240--244 (Full Paper) (link to paper)
  651. Croce, F. D. (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
  652. Croce, F. D. (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)

  653. (Menu for Croce) All papers - Full papers - Abstracts - Selected papers

    Créput

  654. Créput, J. C (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)

  655. (Menu for Créput) All papers - Full papers - Abstracts - Selected papers

    Cucu

  656. Cucu, L (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)
  657. Cucu, L (2005) Periodic real-time scheduling:from latency-based model to deadline-based model, 344--352 (Full Paper) (link to paper)

  658. (Menu for Cucu) All papers - Full papers - Abstracts - Selected papers

    Cucu-Grosjean

  659. Cucu-Grosjean, L (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)

  660. (Menu for Cucu-Grosjean) All papers - Full papers - Abstracts - Selected papers

    Curran

  661. Curran, D (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  662. (Menu for Curran) All papers - Full papers - Abstracts - Selected papers

    Curtois

  663. Curtois, T (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  664. (Menu for Curtois) All papers - Full papers - Abstracts - Selected papers

    Côté

  665. Côté, M. G. · J-F. (2009) An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks, 831--833 (Abstract) (link to paper)

  666. (Menu for Côté) All papers - Full papers - Abstracts - Selected papers

    Damay

  667. Damay, J (2003) Interval Graphs, Antichain Sets and Scheduling with Temporal and Resource Constraints, 620--637 (Full Paper) (link to paper)

  668. (Menu for Damay) All papers - Full papers - Abstracts - Selected papers

    Dang

  669. Dang, D-C. (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)

  670. (Menu for Dang) All papers - Full papers - Abstracts - Selected papers

    Darties

  671. Darties, B (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)
  672. Darties, B (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  673. (Menu for Darties) All papers - Full papers - Abstracts - Selected papers

    Dasaklis

  674. Dasaklis, T (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)

  675. (Menu for Dasaklis) All papers - Full papers - Abstracts - Selected papers

    Dauzere-Peres

  676. Dauzere-Peres, S (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)
  677. Dauzere-Peres, S (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
  678. Dauzere-Peres, S. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
  679. Dauzere-Peres, S (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
  680. Dauzere-Peres, S (2013) New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine, 687--690 (Abstract) (link to paper)
  681. Dauzere-Peres, S (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)

  682. (Menu for Dauzere-Peres) All papers - Full papers - Abstracts - Selected papers

    Dauzère-Pérès

  683. Dauzère-Pérès, S (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)
  684. Dauzère-Pérès, S (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
  685. Dauzère-Pérès, S (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
  686. Dauzère-Pérès, S (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
  687. Dauzère-Pérès, S (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)
  688. Dauzère-Pérès, S (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)

  689. (Menu for Dauzère-Pérès) All papers - Full papers - Abstracts - Selected papers

    Davari

  690. Davari, M. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
  691. Davari, M (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)

  692. (Menu for Davari) All papers - Full papers - Abstracts - Selected papers

    Davenport

  693. Davenport, A (2007) Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming, 120--127 (Full Paper) (link to paper)

  694. (Menu for Davenport) All papers - Full papers - Abstracts - Selected papers

    Davidovi

  695. Davidovi, T (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)

  696. (Menu for Davidovi) All papers - Full papers - Abstracts - Selected papers

    Dawande

  697. Dawande, M (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)

  698. (Menu for Dawande) All papers - Full papers - Abstracts - Selected papers

    De Bruecker

  699. De Bruecker, P (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)

  700. (Menu for De Bruecker) All papers - Full papers - Abstracts - Selected papers

    De Bruyn

  701. De Bruyn, W (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)
  702. De Bruyn, W (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)

  703. (Menu for De Bruyn) All papers - Full papers - Abstracts - Selected papers

    De Causmaecker

  704. De Causmaecker, P (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
  705. De Causmaecker, P (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
  706. De Causmaecker, P (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)
  707. De Causmaecker, P (2011) Pareto Optimal Negotiation for Nurse Rostering Problems, 579--583 (Abstract) (link to paper)
  708. De Causmaecker, P (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
  709. De Causmaecker, P (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
  710. De Causmaecker, P (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
  711. De Causmaecker, P (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
  712. De Causmaecker, P (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)
  713. De Causmaecker, P (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
  714. De Causmaecker, P (2015) The Intermittent Traveling Salesman Problem, 794--796 (Abstract) (link to paper)
  715. De Causmaecker, P (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)

  716. (Menu for De Causmaecker) All papers - Full papers - Abstracts - Selected papers

    De Cesco

  717. De Cesco, F (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)

  718. (Menu for De Cesco) All papers - Full papers - Abstracts - Selected papers

    De Dinechin

  719. De Dinechin, B. D (2007) Time-Indexed Formulations and a Large Neighborhood Search for the Resource-Constrained Modulo Scheduling Problem, 144--151 (Full Paper) (link to paper)

  720. (Menu for De Dinechin) All papers - Full papers - Abstracts - Selected papers

    De Feyter

  721. De Feyter, T (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)

  722. (Menu for De Feyter) All papers - Full papers - Abstracts - Selected papers

    De Maere

  723. De Maere, G (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)

  724. (Menu for De Maere) All papers - Full papers - Abstracts - Selected papers

    De Reyck

  725. De Reyck, B (2007) Project Scheduling with Success or Failure in Individual Activities, 584--587 (Abstract) (link to paper)
  726. De Reyck, B (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)

  727. (Menu for De Reyck) All papers - Full papers - Abstracts - Selected papers

    De Werra

  728. De Werra, D (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)

  729. (Menu for De Werra) All papers - Full papers - Abstracts - Selected papers

    De Wispelaere

  730. De Wispelaere, A (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)

  731. (Menu for De Wispelaere) All papers - Full papers - Abstracts - Selected papers

    Deblaere

  732. Deblaere, F (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)

  733. (Menu for Deblaere) All papers - Full papers - Abstracts - Selected papers

    Degbotse

  734. Degbotse, A (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  735. (Menu for Degbotse) All papers - Full papers - Abstracts - Selected papers

    Deghdak

  736. Deghdak, K (2015) A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem, 704--707 (Abstract) (link to paper)
  737. Deghdak, K (2015) The Discrete Parallel Machine Makespan Scheduling-Location Problem, 659--661 (Abstract) (link to paper)
  738. Deghdak, K (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)
  739. Deghdak, K. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)

  740. (Menu for Deghdak) All papers - Full papers - Abstracts - Selected papers

    Deleplanque

  741. Deleplanque, S (2013) Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed, 185--205 (Full Paper) (link to paper)

  742. (Menu for Deleplanque) All papers - Full papers - Abstracts - Selected papers

    Demange

  743. Demange, M (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)

  744. (Menu for Demange) All papers - Full papers - Abstracts - Selected papers

    Demeester

  745. Demeester, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)
  746. Demeester, P (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)

  747. (Menu for Demeester) All papers - Full papers - Abstracts - Selected papers

    Demeulemeester

  748. Demeulemeester, E (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
  749. Demeulemeester, E (2009) Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company, 724--726 (Abstract) (link to paper)
  750. Demeulemeester, E (2005) Integrating nurse and surgery scheduling, 408--409 (Abstract) (link to paper)
  751. Demeulemeester, E. L (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
  752. Demeulemeester, E. (2016) A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, 409--428 (Selected Paper) (link to paper)
  753. Demeulemeester, E (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)
  754. Demeulemeester, E (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
  755. Demeulemeester, E. L (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  756. Demeulemeester, E (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
  757. Demeulemeester, E (2003) Scheduling Trainees at a Hospital Department, 224--225 (Abstract) (link to paper)
  758. Demeulemeester, E (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)
  759. Demeulemeester, E (2013) The stochastic resource-constrained project scheduling problem under different confidence levels, 774--776 (Abstract) (link to paper)
  760. Demeulemeester, E. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
  761. Demeulemeester, E (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)

  762. (Menu for Demeulemeester) All papers - Full papers - Abstracts - Selected papers

    Demir

  763. Demir, O (2013) A GIS-Based Emergency Response System for Disaster Relief Operations, 372--378 (Full Paper) (link to paper)

  764. (Menu for Demir) All papers - Full papers - Abstracts - Selected papers

    Denton

  765. Denton, B. T (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)

  766. (Menu for Denton) All papers - Full papers - Abstracts - Selected papers

    Dereniowski

  767. Dereniowski, D (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)

  768. (Menu for Dereniowski) All papers - Full papers - Abstracts - Selected papers

    Desrosiers

  769. Desrosiers, J (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)

  770. (Menu for Desrosiers) All papers - Full papers - Abstracts - Selected papers

    Detienne

  771. Detienne, B (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
  772. Detienne, B (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
  773. Detienne, B (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
  774. Detienne, B (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)

  775. (Menu for Detienne) All papers - Full papers - Abstracts - Selected papers

    Dimitrov

  776. Dimitrov, T (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)

  777. (Menu for Dimitrov) All papers - Full papers - Abstracts - Selected papers

    Dios

  778. Dios, M (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
  779. Dios, M (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
  780. Dios, M (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)

  781. (Menu for Dios) All papers - Full papers - Abstracts - Selected papers

    Do

  782. Do, V.H (2003) Scheduling with Two Criteria, 468--472 (Abstract) (link to paper)
  783. Do, H (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)
  784. Do, V. H (2005) Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time, 83--109 (Selected Paper) (link to paper)

  785. (Menu for Do) All papers - Full papers - Abstracts - Selected papers

    Dobson

  786. Dobson, R (2011) Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems, 297--307 (Full Paper) (link to paper)

  787. (Menu for Dobson) All papers - Full papers - Abstracts - Selected papers

    Doerner

  788. Doerner, K.F (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)

  789. (Menu for Doerner) All papers - Full papers - Abstracts - Selected papers

    Doganis

  790. Doganis, P (2008) Optimal production scheduling for the dairy industry, 315--331 (Selected Paper) (link to paper)
  791. Doganis, P (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)

  792. (Menu for Doganis) All papers - Full papers - Abstracts - Selected papers

    Dolgui

  793. Dolgui, A (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)
  794. Dolgui, A (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)

  795. (Menu for Dolgui) All papers - Full papers - Abstracts - Selected papers

    Donaldson

  796. Donaldson, J (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)

  797. (Menu for Donaldson) All papers - Full papers - Abstracts - Selected papers

    Dooren

  798. Dooren, D. V. (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)

  799. (Menu for Dooren) All papers - Full papers - Abstracts - Selected papers

    Dorne

  800. Dorne, R (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  801. (Menu for Dorne) All papers - Full papers - Abstracts - Selected papers

    Dostert

  802. Dostert, M (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)
  803. Dostert, M (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)

  804. (Menu for Dostert) All papers - Full papers - Abstracts - Selected papers

    Down

  805. Down, D. G (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)

  806. (Menu for Down) All papers - Full papers - Abstracts - Selected papers

    Dowsland

  807. Dowsland, K (2011) An Exact and Heuristic Hybrid for Solving a Medical Student Scheduling Problem, 584--586 (Abstract) (link to paper)

  808. (Menu for Dowsland) All papers - Full papers - Abstracts - Selected papers

    Dozic

  809. Dozic, S (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  810. (Menu for Dozic) All papers - Full papers - Abstracts - Selected papers

    Drezet

  811. Drezet, LE (2005) A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements, 671--672 (Abstract) (link to paper)

  812. (Menu for Drezet) All papers - Full papers - Abstracts - Selected papers

    Dridi

  813. Dridi, N (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)

  814. (Menu for Dridi) All papers - Full papers - Abstracts - Selected papers

    Dror

  815. Dror, M (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
  816. Dror, M (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)
  817. Dror, M (2009) Strong-Weak Precedence in Scheduling: Extended Order Implications, 28--42 (Full Paper) (link to paper)
  818. Dror, M (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  819. (Menu for Dror) All papers - Full papers - Abstracts - Selected papers

    Drozdowsk

  820. Drozdowsk, M (2013) Mitigating Partitioning Skew in MapReduce Computations, 80--90 (Full Paper) (link to paper)

  821. (Menu for Drozdowsk) All papers - Full papers - Abstracts - Selected papers

    Drozdowski

  822. Drozdowski, M (2015) Energy Consumption in Single- and Multi-installment Divisible Loads Processing in Systems with Hierarchical Memory, 146--153 (Full Paper) (link to paper)
  823. Drozdowski, M (2011) Preface, 407--407 (Selected Paper) (link to paper)
  824. Drozdowski, M (2009) Heuristics for Divisible Loads Scheduling in Systems with Limited Memory, 321--329 (Full Paper) (link to paper)

  825. (Menu for Drozdowski) All papers - Full papers - Abstracts - Selected papers

    Drwal

  826. Drwal, M (2015) Complexity of minimizing the total flow time on parallel machines with interval data and minmax regret criterion, 617--621 (Abstract) (link to paper)

  827. (Menu for Drwal) All papers - Full papers - Abstracts - Selected papers

    Duarte

  828. Duarte, A (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)

  829. (Menu for Duarte) All papers - Full papers - Abstracts - Selected papers

    Ducatelle

  830. Ducatelle, F (2003) Ants Can Solve Difficult Bin Packing Problems, 90--91 (Abstract) (link to paper)

  831. (Menu for Ducatelle) All papers - Full papers - Abstracts - Selected papers

    Duenas

  832. Duenas, A (2008) An approach to predictive-reactive scheduling of parallel machines subject to disruptions, 65--82 (Selected Paper) (link to paper)
  833. Duenas, A (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
  834. Duenas, A (2005) An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions, 74--91 (Full Paper) (link to paper)

  835. (Menu for Duenas) All papers - Full papers - Abstracts - Selected papers

    Duin

  836. Duin, C.W (2005) Models For Adjacent Resource Scheduling, 16--17 (Abstract) (link to paper)
  837. Duin, C.W (2005) On The Complexity Of Adjacent Resource Scheduling, 653--654 (Abstract) (link to paper)

  838. (Menu for Duin) All papers - Full papers - Abstracts - Selected papers

    Dullaert

  839. Dullaert, W (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)

  840. (Menu for Dullaert) All papers - Full papers - Abstracts - Selected papers

    Dusa

  841. Dusa, V (2009) Preemptive scheduling with precedences and alternative resources, 518--530 (Full Paper) (link to paper)

  842. (Menu for Dusa) All papers - Full papers - Abstracts - Selected papers

    Dutot

  843. Dutot, P-F. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  844. (Menu for Dutot) All papers - Full papers - Abstracts - Selected papers

    Earl

  845. Earl, M (2013) Innovative teaching and the death of the utilisation survey, 781--785 (Abstract) (link to paper)

  846. (Menu for Earl) All papers - Full papers - Abstracts - Selected papers

    Ecker

  847. Ecker, K. H (2007) Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load, 200--208 (Full Paper) (link to paper)

  848. (Menu for Ecker) All papers - Full papers - Abstracts - Selected papers

    Eckersley

  849. Eckersley, A. J (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)

  850. (Menu for Eckersley) All papers - Full papers - Abstracts - Selected papers

    Eglese

  851. Eglese, R (2003) Vehicle Routing and Scheduling with a Road Timetable, 700--700 (Abstract) (link to paper)
  852. Eglese, R (2005) Vehicle Routing And Scheduling With Time Varying Travel Times, 724--724 (Abstract) (link to paper)

  853. (Menu for Eglese) All papers - Full papers - Abstracts - Selected papers

    Ekim

  854. Ekim, T (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)

  855. (Menu for Ekim) All papers - Full papers - Abstracts - Selected papers

    Elalouf

  856. Elalouf, A (2015) Floating Patients method based on scheduling algorithm for emergency department's service improvement, 683--686 (Abstract) (link to paper)
  857. Elalouf, A (2015) A general technique for improving the complexity of FPTAS for scheduling problems, 743--745 (Abstract) (link to paper)

  858. (Menu for Elalouf) All papers - Full papers - Abstracts - Selected papers

    Elhag

  859. Elhag, A (2013) A Grouping Hyper-heuristic for Graph Colouring, 770--773 (Abstract) (link to paper)

  860. (Menu for Elhag) All papers - Full papers - Abstracts - Selected papers

    Elliot

  861. Elliot, R. (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  862. (Menu for Elliot) All papers - Full papers - Abstracts - Selected papers

    Elmaghraby

  863. Elmaghraby, S.E (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)

  864. (Menu for Elmaghraby) All papers - Full papers - Abstracts - Selected papers

    Elvikis

  865. Elvikis, D (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)
  866. Elvikis, D (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)
  867. Elvikis, D (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)

  868. (Menu for Elvikis) All papers - Full papers - Abstracts - Selected papers

    Ermis

  869. Ermis, G (2013) Scheduling chains with constant time lags and variable release times on asingle machine, 584--586 (Abstract) (link to paper)

  870. (Menu for Ermis) All papers - Full papers - Abstracts - Selected papers

    Erramilli

  871. Erramilli, V (2005) Multiple Orders Per Job Batch Scheduling With Incompatible Jobs, 48--64 (Full Paper) (link to paper)
  872. Erramilli, V (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
  873. Erramilli, V (2008) Multiple orders per job batch scheduling with incompatible jobs, 245--260 (Selected Paper) (link to paper)

  874. (Menu for Erramilli) All papers - Full papers - Abstracts - Selected papers

    Ersoy

  875. Ersoy, E (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)

  876. (Menu for Ersoy) All papers - Full papers - Abstracts - Selected papers

    Esswein

  877. Esswein, C (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  878. (Menu for Esswein) All papers - Full papers - Abstracts - Selected papers

    Esteve

  879. Esteve, B (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)

  880. (Menu for Esteve) All papers - Full papers - Abstracts - Selected papers

    Facó

  881. Facó, J. L. D. (2007) Applying Optimal Control to Jetty Scheduling Problems, 167--174 (Full Paper) (link to paper)

  882. (Menu for Facó) All papers - Full papers - Abstracts - Selected papers

    Fagundez

  883. Fagundez, F. D. (2007) Applying Optimal Control to Jetty Scheduling Problems, 167--174 (Full Paper) (link to paper)

  884. (Menu for Fagundez) All papers - Full papers - Abstracts - Selected papers

    Fainberg

  885. Fainberg, A (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  886. (Menu for Fainberg) All papers - Full papers - Abstracts - Selected papers

    Fan

  887. Fan, C (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)

  888. (Menu for Fan) All papers - Full papers - Abstracts - Selected papers

    Fathy

  889. Fathy, Y (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)

  890. (Menu for Fathy) All papers - Full papers - Abstracts - Selected papers

    Fayad

  891. Fayad, C (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  892. Fayad, C (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)

  893. (Menu for Fayad) All papers - Full papers - Abstracts - Selected papers

    Feillet

  894. Feillet, D (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)
  895. Feillet, D (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
  896. Feillet, D (2008) A branch and bound method for the job-shop problem with sequence-dependent setup times, 135--159 (Selected Paper) (link to paper)

  897. (Menu for Feillet) All papers - Full papers - Abstracts - Selected papers

    Feitelson

  898. Feitelson, D.G (2003) Bicriteria Scheduling for Parallel Jobs, 606--619 (Full Paper) (link to paper)

  899. (Menu for Feitelson) All papers - Full papers - Abstracts - Selected papers

    Feng

  900. Feng, G (2008) Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, 83--95 (Selected Paper) (link to paper)
  901. Feng, G (2005) Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties, 196--212 (Abstract) (link to paper)

  902. (Menu for Feng) All papers - Full papers - Abstracts - Selected papers

    Fernandes

  903. Fernandes, P. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)
  904. Fernandes, P (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)
  905. Fernandes, F (2015) Solving the staff scheduling problem in a retail company, 611--613 (Abstract) (link to paper)

  906. (Menu for Fernandes) All papers - Full papers - Abstracts - Selected papers

    Fernandez-Viagas

  907. Fernandez-Viagas, V (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
  908. Fernandez-Viagas, V (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
  909. Fernandez-Viagas, V (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)

  910. (Menu for Fernandez-Viagas) All papers - Full papers - Abstracts - Selected papers

    Fernández

  911. Fernández, F (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)

  912. (Menu for Fernández) All papers - Full papers - Abstracts - Selected papers

    Finke

  913. Finke, G (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
  914. Finke, G (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
  915. Finke, G (2007) Scheduling with Batch Compatible Tasks, 24--26 (Full Paper) (link to paper)
  916. Finke, G. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
  917. Finke, G (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
  918. Finke, G (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)
  919. Finke, G (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)

  920. (Menu for Finke) All papers - Full papers - Abstracts - Selected papers

    Fleischer

  921. Fleischer, L. (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  922. (Menu for Fleischer) All papers - Full papers - Abstracts - Selected papers

    Fleszar

  923. Fleszar, K (2011) Hybridizing local search with MIP for unrelated parallel machine scheduling problems with makespan minimization, 529--531 (Abstract) (link to paper)
  924. Fleszar, K (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  925. (Menu for Fleszar) All papers - Full papers - Abstracts - Selected papers

    Fong

  926. Fong, C-W. (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  927. Fong, P. Y. (2005) Combined Production and Distribution Scheduling of Ready-Mix Concrete, 551--551 (Abstract) (link to paper)

  928. (Menu for Fong) All papers - Full papers - Abstracts - Selected papers

    Fonseca

  929. Fonseca, G.H.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
  930. Fonseca, G. H. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
  931. Fonseca, G. H.G (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
  932. Fonseca, G. H.G (2013) A New Integer Linear Programming Formulation to the Examination Timetabling Problem, 345--355 (Full Paper) (link to paper)

  933. (Menu for Fonseca) All papers - Full papers - Abstracts - Selected papers

    Foong

  934. Foong, W. K. (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)
  935. Foong, W. K. (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)

  936. (Menu for Foong) All papers - Full papers - Abstracts - Selected papers

    Fordyce

  937. Fordyce, K (2011) The Ongoing Challenge – A Responsive Enterprise-Wide Demand Supply Network for Semiconductor Based Package Goods – Something for Everyone, 10--93 (Full Paper) (link to paper)
  938. Fordyce, K (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  939. (Menu for Fordyce) All papers - Full papers - Abstracts - Selected papers

    Fores

  940. Fores, S (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  941. (Menu for Fores) All papers - Full papers - Abstracts - Selected papers

    Fowler

  942. Fowler, J. W (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
  943. Fowler, J (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)
  944. Fowler, J. W (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
  945. Fowler, J. W (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)
  946. Fowler, J. W (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
  947. Fowler, J (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  948. Fowler, J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
  949. Fowler, J. W (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
  950. Fowler, J (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  951. Fowler, J. W (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
  952. Fowler, J. W (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
  953. Fowler, J (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
  954. Fowler, J. W (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  955. Fowler, J (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  956. Fowler, J. W (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
  957. Fowler, J (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
  958. Fowler, J (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
  959. Fowler, J. W (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
  960. Fowler, J (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  961. Fowler, J (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
  962. Fowler, J. W (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)
  963. Fowler, J. W (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
  964. Fowler, J (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)

  965. (Menu for Fowler) All papers - Full papers - Abstracts - Selected papers

    Framinan

  966. Framinan, J.M (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
  967. Framinan, J. M (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
  968. Framinan, J. M. (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)

  969. (Menu for Framinan) All papers - Full papers - Abstracts - Selected papers

    Francis

  970. Francis, H (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  971. (Menu for Francis) All papers - Full papers - Abstracts - Selected papers

    Froncek

  972. Froncek, D (2003) Round Robin Tournaments with No Breaks in Home-Away Patterns, 602--603 (Abstract) (link to paper)
  973. Froncek, D (2005) Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique, 331--340 (Selected Paper) (link to paper)

  974. (Menu for Froncek) All papers - Full papers - Abstracts - Selected papers

    Fu

  975. Fu, L- (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
  976. Fu, L- (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)

  977. (Menu for Fu) All papers - Full papers - Abstracts - Selected papers

    Fugenschuh

  978. Fugenschuh, A (2015) Home Health Care Scheduling: A Case Study, 555--569 (Full Paper) (link to paper)

  979. (Menu for Fugenschuh) All papers - Full papers - Abstracts - Selected papers

    Fujikuma

  980. Fujikuma, S (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)

  981. (Menu for Fujikuma) All papers - Full papers - Abstracts - Selected papers

    G

  982. G, M. J. G. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)
  983. G, J. J. H. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)

  984. (Menu for G) All papers - Full papers - Abstracts - Selected papers

    Gafarov

  985. Gafarov, E.R (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)
  986. Gafarov, E. R (2009) Estimation of absolute error for the resources-constrained project scheduling problem, 671--678 (Abstract) (link to paper)
  987. Gafarov, E.R (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)

  988. (Menu for Gafarov) All papers - Full papers - Abstracts - Selected papers

    Gagn

  989. Gagn, C (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)

  990. (Menu for Gagn) All papers - Full papers - Abstracts - Selected papers

    Gao

  991. Gao, S (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)
  992. Gao, J (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
  993. Gao, S (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
  994. Gao, H (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  995. (Menu for Gao) All papers - Full papers - Abstracts - Selected papers

    Garc?a-Leon

  996. Garc?a-Leon, A (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)

  997. (Menu for Garc?a-Leon) All papers - Full papers - Abstracts - Selected papers

    Garcia-Sabater

  998. Garcia-Sabater, J.P (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)
  999. Garcia-Sabater, J.P (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)

  1000. (Menu for Garcia-Sabater) All papers - Full papers - Abstracts - Selected papers

    García-Sabater

  1001. García-Sabater, J. P. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)
  1002. García-Sabater, J. J. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)

  1003. (Menu for García-Sabater) All papers - Full papers - Abstracts - Selected papers

    Garibaldi

  1004. Garibaldi, J. M (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  1005. Garibaldi, J. M (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)

  1006. (Menu for Garibaldi) All papers - Full papers - Abstracts - Selected papers

    Garra?a

  1007. Garra?a, M (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  1008. Garra?a, M (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)

  1009. (Menu for Garra?a) All papers - Full papers - Abstracts - Selected papers

    Gaspero

  1010. Gaspero, L. D (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
  1011. Gaspero, L. D (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)

  1012. (Menu for Gaspero) All papers - Full papers - Abstracts - Selected papers

    Gather

  1013. Gather, T (2009) Exact methods for the resource levelling problem, 811--820 (Abstract) (link to paper)
  1014. Gather, T (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)

  1015. (Menu for Gather) All papers - Full papers - Abstracts - Selected papers

    Gauthier

  1016. Gauthier, J.B (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)

  1017. (Menu for Gauthier) All papers - Full papers - Abstracts - Selected papers

    Gawiejnowicz

  1018. Gawiejnowicz, S. la (2007) Scheduling Resumable Deteriorating Jobs, 567--569 (Abstract) (link to paper)

  1019. (Menu for Gawiejnowicz) All papers - Full papers - Abstracts - Selected papers

    Gazdar

  1020. Gazdar, A (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)
  1021. Gazdar, A (2015) Bounding schemes for the parallel processors scheduling problem with release date, delivery time and with no-idle time constraint, 393--402 (Full Paper) (link to paper)

  1022. (Menu for Gazdar) All papers - Full papers - Abstracts - Selected papers

    Geiger

  1023. Geiger, M.J (2013) Iterated Variable Neighborhood Search for the resource constrained multi-mode multi-project scheduling problem Some comments on our contribution to the MISTA 2013 Challenge, 807--811 (Full Paper) (link to paper)

  1024. (Menu for Geiger) All papers - Full papers - Abstracts - Selected papers

    Geirsson

  1025. Geirsson, E (2013) Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling, 318--330 (Full Paper) (link to paper)

  1026. (Menu for Geirsson) All papers - Full papers - Abstracts - Selected papers

    Geismar

  1027. Geismar, H. N (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)

  1028. (Menu for Geismar) All papers - Full papers - Abstracts - Selected papers

    Gel

  1029. Gel, E (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  1030. (Menu for Gel) All papers - Full papers - Abstracts - Selected papers

    Gelbukh

  1031. Gelbukh, A (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)

  1032. (Menu for Gelbukh) All papers - Full papers - Abstracts - Selected papers

    Gendreau

  1033. Gendreau, M (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
  1034. Gendreau, M (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  1035. (Menu for Gendreau) All papers - Full papers - Abstracts - Selected papers

    Giroudeau

  1036. Giroudeau, R (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)
  1037. Giroudeau, R (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  1038. (Menu for Giroudeau) All papers - Full papers - Abstracts - Selected papers

    Glass

  1039. Glass, C. A (2005) How to maximize rewards in an incentived made-to-order scheduling environment:, 69--69 (Abstract) (link to paper)
  1040. Glass, C (2009) Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials, 782--783 (Abstract) (link to paper)

  1041. (Menu for Glass) All papers - Full papers - Abstracts - Selected papers

    Glazebrook

  1042. Glazebrook, K (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
  1043. Glazebrook, K. D (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
  1044. Glazebrook, K.D (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  1045. (Menu for Glazebrook) All papers - Full papers - Abstracts - Selected papers

    Glizer

  1046. Glizer, V.Y (2015) Optimal schedule of a statistical process control with a nonlinear expected loss, 42--54 (Full Paper) (link to paper)

  1047. (Menu for Glizer) All papers - Full papers - Abstracts - Selected papers

    Godard

  1048. Godard, D (2007) Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems, 276--284 (Full Paper) (link to paper)

  1049. (Menu for Godard) All papers - Full papers - Abstracts - Selected papers

    Goel

  1050. Goel, A (2015) Scheduling of jobs in the continuous casting stage of steel production, 899--901 (Abstract) (link to paper)

  1051. (Menu for Goel) All papers - Full papers - Abstracts - Selected papers

    Gogos

  1052. Gogos, C (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  1053. (Menu for Gogos) All papers - Full papers - Abstracts - Selected papers

    Goldrick

  1054. Goldrick, J. M (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)

  1055. (Menu for Goldrick) All papers - Full papers - Abstracts - Selected papers

    Gomes

  1056. Gomes, M. C (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)
  1057. Gomes, M. C (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)

  1058. (Menu for Gomes) All papers - Full papers - Abstracts - Selected papers

    Gonzales

  1059. Gonzales, C (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)
  1060. Gonzales, C (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)

  1061. (Menu for Gonzales) All papers - Full papers - Abstracts - Selected papers

    Gonzalez

  1062. Gonzalez, M. T (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  1063. (Menu for Gonzalez) All papers - Full papers - Abstracts - Selected papers

    González

  1064. González, E. J (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  1065. (Menu for González) All papers - Full papers - Abstracts - Selected papers

    Goossens

  1066. Goossens, J (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)
  1067. Goossens, D. R (2009) Soccer schedules in Europe: an overview, 715--717 (Abstract) (link to paper)
  1068. Goossens, D. R (2013) Scheduling round robin tournaments for amateur sport leagues, 596--598 (Abstract) (link to paper)

  1069. (Menu for Goossens) All papers - Full papers - Abstracts - Selected papers

    Gorczyca

  1070. Gorczyca, M (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)

  1071. (Menu for Gorczyca) All papers - Full papers - Abstracts - Selected papers

    Gordon

  1072. Gordon, V. S (2005) Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem, 132--139 (Full Paper) (link to paper)

  1073. (Menu for Gordon) All papers - Full papers - Abstracts - Selected papers

    Gosling

  1074. Gosling, T (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  1075. (Menu for Gosling) All papers - Full papers - Abstracts - Selected papers

    Goulas

  1076. Goulas, G (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  1077. (Menu for Goulas) All papers - Full papers - Abstracts - Selected papers

    Gourgand

  1078. Gourgand, M (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)

  1079. (Menu for Gourgand) All papers - Full papers - Abstracts - Selected papers

    Greenwood

  1080. Greenwood, J. S (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
  1081. Greenwood, J. S (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)

  1082. (Menu for Greenwood) All papers - Full papers - Abstracts - Selected papers

    Grigoreva

  1083. Grigoreva, N.S (2015) Multiprocessor Scheduling with Inserted Idle Time to Minimize the Maximum Lateness, 814--816 (Abstract) (link to paper)

  1084. (Menu for Grigoreva) All papers - Full papers - Abstracts - Selected papers

    Grinshpoun

  1085. Grinshpoun, T (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
  1086. Grinshpoun, T (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)
  1087. Grinshpoun, T (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  1088. (Menu for Grinshpoun) All papers - Full papers - Abstracts - Selected papers

    Groenbaek

  1089. Groenbaek, J (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  1090. (Menu for Groenbaek) All papers - Full papers - Abstracts - Selected papers

    Grosso

  1091. Grosso, A (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)

  1092. (Menu for Grosso) All papers - Full papers - Abstracts - Selected papers

    Gröflin

  1093. Gröflin, H (2011) Optimal Job Insertion in the No-Wait Job Shop, 553--556 (Abstract) (link to paper)

  1094. (Menu for Gröflin) All papers - Full papers - Abstracts - Selected papers

    Gude

  1095. Gude, J. P. (2007) Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations, 550--552 (Abstract) (link to paper)

  1096. (Menu for Gude) All papers - Full papers - Abstracts - Selected papers

    Guedes

  1097. Guedes, A. C.B (2011) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 655--667 (Selected Paper) (link to paper)
  1098. Guedes, A.F. M. (2013) Scheduling with MS Project: an add-in, 707--710 (Abstract) (link to paper)
  1099. Guedes, A. C. B (2009) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 115--129 (Full Paper) (link to paper)

  1100. (Menu for Guedes) All papers - Full papers - Abstracts - Selected papers

    Guerry

  1101. Guerry, M-A. (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)

  1102. (Menu for Guerry) All papers - Full papers - Abstracts - Selected papers

    Gui

  1103. Gui, H (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  1104. (Menu for Gui) All papers - Full papers - Abstracts - Selected papers

    Guinet

  1105. Guinet, A (2003) Operating Theatre Management, 220--223 (Abstract) (link to paper)

  1106. (Menu for Guinet) All papers - Full papers - Abstracts - Selected papers

    Guirchoun

  1107. Guirchoun, S (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)

  1108. (Menu for Guirchoun) All papers - Full papers - Abstracts - Selected papers

    Guitouni

  1109. Guitouni, A (2009) A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP), 277--290 (Full Paper) (link to paper)

  1110. (Menu for Guitouni) All papers - Full papers - Abstracts - Selected papers

    Gul

  1111. Gul, S (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)

  1112. (Menu for Gul) All papers - Full papers - Abstracts - Selected papers

    Gultekin

  1113. Gultekin, H (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)

  1114. (Menu for Gultekin) All papers - Full papers - Abstracts - Selected papers

    Gunawan

  1115. Gunawan, A (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)
  1116. Gunawan, A (2009) Master Physician Scheduling Problem, 145--156 (Full Paper) (link to paper)

  1117. (Menu for Gunawan) All papers - Full papers - Abstracts - Selected papers

    Gupta

  1118. Gupta, J.N.D (2015) Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability, 746--749 (Abstract) (link to paper)
  1119. Gupta, J. N.D (2007) Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*, 538--545 (Full Paper) (link to paper)

  1120. (Menu for Gupta) All papers - Full papers - Abstracts - Selected papers

    Gushchina

  1121. Gushchina, V (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  1122. (Menu for Gushchina) All papers - Full papers - Abstracts - Selected papers

    Günther

  1123. Günther, H-O. (2009) An MILP-based approach to short-term production scheduling and lot sizing with major and minor setups: A case study from the beverage industry, 741--743 (Abstract) (link to paper)

  1124. (Menu for Günther) All papers - Full papers - Abstracts - Selected papers

    Habla

  1125. Habla, C (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
  1126. Habla, C (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)

  1127. (Menu for Habla) All papers - Full papers - Abstracts - Selected papers

    Hadda

  1128. Hadda, H (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)

  1129. (Menu for Hadda) All papers - Full papers - Abstracts - Selected papers

    Hajjam

  1130. Hajjam, A (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)

  1131. (Menu for Hajjam) All papers - Full papers - Abstracts - Selected papers

    Hajri-Gabouj

  1132. Hajri-Gabouj, S (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)

  1133. (Menu for Hajri-Gabouj) All papers - Full papers - Abstracts - Selected papers

    Hall

  1134. Hall, N.G (2003) The Coordination of Scheduling and Batch Deliveries, 656--659 (Abstract) (link to paper)

  1135. (Menu for Hall) All papers - Full papers - Abstracts - Selected papers

    Hamacher

  1136. Hamacher, H. W (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)
  1137. Hamacher, H. W (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)
  1138. Hamacher, H. W (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)

  1139. (Menu for Hamacher) All papers - Full papers - Abstracts - Selected papers

    Hamid

  1140. Hamid, N. H. A (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)

  1141. (Menu for Hamid) All papers - Full papers - Abstracts - Selected papers

    Hamilton

  1142. Hamilton, A. F (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  1143. (Menu for Hamilton) All papers - Full papers - Abstracts - Selected papers

    Hamilton-Bryce

  1144. Hamilton-Bryce, R (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)

  1145. (Menu for Hamilton-Bryce) All papers - Full papers - Abstracts - Selected papers

    Han

  1146. Han, L (2003) Application of Genetic Algorithm Based Hyper-heuristics to Personnel Scheduling Problems, 528--539 (Abstract) (link to paper)
  1147. Han, J (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)

  1148. (Menu for Han) All papers - Full papers - Abstracts - Selected papers

    Hana?

  1149. Hana?, S (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)

  1150. (Menu for Hana?) All papers - Full papers - Abstracts - Selected papers

    Hanayama

  1151. Hanayama, N (2015) Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities, 596--600 (Abstract) (link to paper)

  1152. (Menu for Hanayama) All papers - Full papers - Abstracts - Selected papers

    Hanen

  1153. Hanen, C (2009) Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays, 254--265 (Full Paper) (link to paper)
  1154. Hanen, C (2013) Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem, 721--724 (Abstract) (link to paper)
  1155. Hanen, C (2005) The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors, 453--470 (Full Paper) (link to paper)
  1156. Hanen, C (2011) Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, 511--522 (Selected Paper) (link to paper)
  1157. Hanen, C (2011) Impact of core precedences in a Cyclic RCPSP with temporal constraints, 245--260 (Full Paper) (link to paper)
  1158. Hanen, C (2005) Scheduling UET-UCT task systems under the out-forest precedence constraints, 445--452 (Full Paper) (link to paper)

  1159. (Menu for Hanen) All papers - Full papers - Abstracts - Selected papers

    Hanne

  1160. Hanne, T (2005) Scheduling in Software Development Using Multiobjective Evolutionary Algorithms, 57--81 (Selected Paper) (link to paper)
  1161. Hanne, T (2003) Scheduling In Software Development Using MultiObjective Evolutionary Algorithms, 438--465 (Full Paper) (link to paper)

  1162. (Menu for Hanne) All papers - Full papers - Abstracts - Selected papers

    Hanzalek

  1163. Hanzalek, Z (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
  1164. Hanzalek, Z (2007) Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors, 463--470 (Full Paper) (link to paper)
  1165. Hanzalek, Z (2011) Impact of core precedences in a Cyclic RCPSP with temporal constraints, 245--260 (Full Paper) (link to paper)
  1166. Hanzalek, Z (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
  1167. Hanzalek, Z (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)
  1168. Hanzalek, Z (2015) Mixed-criticality scheduling with known probabilities, 867--870 (Abstract) (link to paper)
  1169. Hanzalek, Z (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
  1170. Hanzalek, Z (2009) Time Symmetry of Project Scheduling with Time Windows and Take-give Resources, 239--253 (Full Paper) (link to paper)
  1171. Hanzalek, Z (2013) Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem, 721--724 (Abstract) (link to paper)

  1172. (Menu for Hanzalek) All papers - Full papers - Abstracts - Selected papers

    Hao

  1173. Hao, J-K. (2007) Integrated Vehicle and Crew Scheduling for Extra-Urban Transport, 578--580 (Abstract) (link to paper)

  1174. (Menu for Hao) All papers - Full papers - Abstracts - Selected papers

    Haouari

  1175. Haouari, M (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  1176. (Menu for Haouari) All papers - Full papers - Abstracts - Selected papers

    Harbering

  1177. Harbering, J (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)

  1178. (Menu for Harbering) All papers - Full papers - Abstracts - Selected papers

    Hartl

  1179. Hartl, R. F (2009) A VNS-based solution approach for a flexible flow shop problem with limited buffer, 706--708 (Abstract) (link to paper)

  1180. (Menu for Hartl) All papers - Full papers - Abstracts - Selected papers

    Hartmann

  1181. Hartmann, S (2015) An Efficient Simulated Annealing for the Integrated Problem of Berth Allocation and Quay Crane Assignment in Seaside Container Terminals, 154--164 (Full Paper) (link to paper)

  1182. (Menu for Hartmann) All papers - Full papers - Abstracts - Selected papers

    Hasenfuss

  1183. Hasenfuss, A (2007) Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load, 200--208 (Full Paper) (link to paper)

  1184. (Menu for Hasenfuss) All papers - Full papers - Abstracts - Selected papers

    Haspeslagh

  1185. Haspeslagh, S (2011) Pareto Optimal Negotiation for Nurse Rostering Problems, 579--583 (Abstract) (link to paper)
  1186. Haspeslagh, S (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
  1187. Haspeslagh, S (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)

  1188. (Menu for Haspeslagh) All papers - Full papers - Abstracts - Selected papers

    Haugen

  1189. Haugen, K (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  1190. (Menu for Haugen) All papers - Full papers - Abstracts - Selected papers

    Haz?r

  1191. Haz?r, Ö (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)
  1192. Haz?r, O (2013) Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases, 757--761 (Abstract) (link to paper)

  1193. (Menu for Haz?r) All papers - Full papers - Abstracts - Selected papers

    Hazir

  1194. Hazir, O (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)

  1195. (Menu for Hazir) All papers - Full papers - Abstracts - Selected papers

    He

  1196. He, F (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)

  1197. (Menu for He) All papers - Full papers - Abstracts - Selected papers

    Hebrard

  1198. Hebrard, E (2013) MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 815--819 (Full Paper) (link to paper)

  1199. (Menu for Hebrard) All papers - Full papers - Abstracts - Selected papers

    Hemig

  1200. Hemig, C (2007) Medium-Term Production and Staff Planning in the Automotive Industry, 209--216 (Full Paper) (link to paper)

  1201. (Menu for Hemig) All papers - Full papers - Abstracts - Selected papers

    Hendel

  1202. Hendel, Y (2007) The Parallel Machine Scheduling Problem with Path-like Constraints, 570--571 (Abstract) (link to paper)
  1203. Hendel, Y (2005) The Single Machine Just-in-time Scheduling Problem With Preemptions, 140--148 (Full Paper) (link to paper)

  1204. (Menu for Hendel) All papers - Full papers - Abstracts - Selected papers

    Hendriks

  1205. Hendriks, M (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)

  1206. (Menu for Hendriks) All papers - Full papers - Abstracts - Selected papers

    Herbots

  1207. Herbots, J (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
  1208. Herbots, J (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)

  1209. (Menu for Herbots) All papers - Full papers - Abstracts - Selected papers

    Herding

  1210. Herding, R (2015) Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs, 817--820 (Abstract) (link to paper)

  1211. (Menu for Herding) All papers - Full papers - Abstracts - Selected papers

    Herr

  1212. Herr, O (2015) Scheduling of jobs in the continuous casting stage of steel production, 899--901 (Abstract) (link to paper)

  1213. (Menu for Herr) All papers - Full papers - Abstracts - Selected papers

    Herring

  1214. Herring, W. L (2011) Scheduling Impatient Jobs with Diminishing Rewards: The Impact of Deteriorating Survival Probabilities on Mass Casualty Incident Triage, 587--591 (Abstract) (link to paper)

  1215. (Menu for Herring) All papers - Full papers - Abstracts - Selected papers

    Herrmann

  1216. Herrmann, J. W (2005) A History Of Decision-making Tools For Production Scheduling, 380--389 (Full Paper) (link to paper)
  1217. Herrmann, J. W (2011) Scheduling Impatient Jobs with Diminishing Rewards: The Impact of Deteriorating Survival Probabilities on Mass Casualty Incident Triage, 587--591 (Abstract) (link to paper)
  1218. Herrmann, J. W (2009) Generating Cyclic Fair Sequences for Multiple Servers, 628--644 (Full Paper) (link to paper)
  1219. Herrmann, J. W (2011) Generating Better Cyclic Fair Sequences Faster with Aggregation, 200--214 (Full Paper) (link to paper)

  1220. (Menu for Herrmann) All papers - Full papers - Abstracts - Selected papers

    Herroelen

  1221. Herroelen, W. S (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  1222. Herroelen, W. S (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)
  1223. Herroelen, W (2005) Stable Single-machine Schedules, 213--214 (Abstract) (link to paper)
  1224. Herroelen, W. S (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
  1225. Herroelen, W (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
  1226. Herroelen, W (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
  1227. Herroelen, W. S (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
  1228. Herroelen, W (2003) Resource Allocation for Stability in Reactive Project Scheduling, 116--119 (Abstract) (link to paper)
  1229. Herroelen, W (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)

  1230. (Menu for Herroelen) All papers - Full papers - Abstracts - Selected papers

    Hertzler

  1231. Hertzler, E. F (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  1232. (Menu for Hertzler) All papers - Full papers - Abstracts - Selected papers

    Heßler

  1233. Heßler, C (2015) The Discrete Parallel Machine Makespan Scheduling-Location Problem, 659--661 (Abstract) (link to paper)

  1234. (Menu for Heßler) All papers - Full papers - Abstracts - Selected papers

    Hidri

  1235. Hidri, L (2015) Bounding schemes for the parallel processors scheduling problem with release date, delivery time and with no-idle time constraint, 393--402 (Full Paper) (link to paper)
  1236. Hidri, L (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)

  1237. (Menu for Hidri) All papers - Full papers - Abstracts - Selected papers

    Hieu

  1238. Hieu, T. T (2011) Two-level water-flow algorithm for vehicle routing problems, 493--496 (Abstract) (link to paper)
  1239. Hieu, T. T (2009) A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers, 606--615 (Full Paper) (link to paper)

  1240. (Menu for Hieu) All papers - Full papers - Abstracts - Selected papers

    Hildebrandt

  1241. Hildebrandt, T. (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)
  1242. Hildebrandt, T (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)

  1243. (Menu for Hildebrandt) All papers - Full papers - Abstracts - Selected papers

    Hiranaka

  1244. Hiranaka, Y (2009) Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems, 655--659 (Full Paper) (link to paper)

  1245. (Menu for Hiranaka) All papers - Full papers - Abstracts - Selected papers

    Hiroux

  1246. Hiroux, M (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  1247. (Menu for Hiroux) All papers - Full papers - Abstracts - Selected papers

    Hmida

  1248. Hmida, A. Be (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  1249. (Menu for Hmida) All papers - Full papers - Abstracts - Selected papers

    Hoc

  1250. Hoc, J-M. (2003) From Human Heuristics to the Design of Scheduling Interfaces, 236--239 (Abstract) (link to paper)

  1251. (Menu for Hoc) All papers - Full papers - Abstracts - Selected papers

    Hodge

  1252. Hodge, D. J (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
  1253. Hodge, D.J (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  1254. (Menu for Hodge) All papers - Full papers - Abstracts - Selected papers

    Hojati

  1255. Hojati, M (2015) A Greedy-based Heuristic for Shift Minimization Personnel Task Scheduling Problem, 949--951 (Abstract) (link to paper)

  1256. (Menu for Hojati) All papers - Full papers - Abstracts - Selected papers

    Honer

  1257. Honer, J (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)

  1258. (Menu for Honer) All papers - Full papers - Abstracts - Selected papers

    Horn

  1259. Horn, G (2015) Scheduling Time Variant Jobs on a Time Variant Resource, 914--917 (Abstract) (link to paper)

  1260. (Menu for Horn) All papers - Full papers - Abstracts - Selected papers

    Horvath

  1261. Horvath, M (2015) Solving resource constrained shortest path problems with branch-and-cut, 677--679 (Abstract) (link to paper)

  1262. (Menu for Horvath) All papers - Full papers - Abstracts - Selected papers

    Houbraken

  1263. Houbraken, M (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  1264. (Menu for Houbraken) All papers - Full papers - Abstracts - Selected papers

    Housos

  1265. Housos, E (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  1266. (Menu for Housos) All papers - Full papers - Abstracts - Selected papers

    Howe

  1267. Howe, A. E (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
  1268. Howe, A.E (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)
  1269. Howe, A. E (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)

  1270. (Menu for Howe) All papers - Full papers - Abstracts - Selected papers

    Hsieh

  1271. Hsieh, F. Y (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)

  1272. (Menu for Hsieh) All papers - Full papers - Abstracts - Selected papers

    Huacuja

  1273. Huacuja, H. J. F. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  1274. (Menu for Huacuja) All papers - Full papers - Abstracts - Selected papers

    Huang

  1275. Huang, P (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  1276. (Menu for Huang) All papers - Full papers - Abstracts - Selected papers

    Huff

  1277. Huff, J. D (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  1278. (Menu for Huff) All papers - Full papers - Abstracts - Selected papers

    Huguet

  1279. Huguet, M-J. (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  1280. (Menu for Huguet) All papers - Full papers - Abstracts - Selected papers

    Huisman

  1281. Huisman, B (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)

  1282. (Menu for Huisman) All papers - Full papers - Abstracts - Selected papers

    Huo

  1283. Huo, Y (2005) Online Scheduling Of Precedence Constrained Tasks, 573--584 (Full Paper) (link to paper)

  1284. (Menu for Huo) All papers - Full papers - Abstracts - Selected papers

    Hurink

  1285. Hurink, J. L (2007) Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive, 605--607 (Abstract) (link to paper)
  1286. Hurink, J. L (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
  1287. Hurink, J (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)

  1288. (Menu for Hurink) All papers - Full papers - Abstracts - Selected papers

    Huschka

  1289. Huschka, T. R (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)

  1290. (Menu for Huschka) All papers - Full papers - Abstracts - Selected papers

    Hussin

  1291. Hussin, N. M. (2003) An Investigation of a Tabu Search Based Hyper-heuristic for Examination Timetabling, 226--235 (Abstract) (link to paper)
  1292. Hussin, N. M. (2005) An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling, 309--328 (Selected Paper) (link to paper)

  1293. (Menu for Hussin) All papers - Full papers - Abstracts - Selected papers

    Hutabarat

  1294. Hutabarat, W (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  1295. (Menu for Hutabarat) All papers - Full papers - Abstracts - Selected papers

    Hyde

  1296. Hyde, M (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
  1297. Hyde, M (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  1298. (Menu for Hyde) All papers - Full papers - Abstracts - Selected papers

    Hübner

  1299. Hübner, F (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)

  1300. (Menu for Hübner) All papers - Full papers - Abstracts - Selected papers

    Iima

  1301. Iima, H (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)

  1302. (Menu for Iima) All papers - Full papers - Abstracts - Selected papers

    Ilani

  1303. Ilani, H (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
  1304. Ilani, H (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
  1305. Ilani, H (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)

  1306. (Menu for Ilani) All papers - Full papers - Abstracts - Selected papers

    Improta

  1307. Improta, G (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)

  1308. (Menu for Improta) All papers - Full papers - Abstracts - Selected papers

    Indra-Payoong

  1309. Indra-Payoong, N (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
  1310. Indra-Payoong, N (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)

  1311. (Menu for Indra-Payoong) All papers - Full papers - Abstracts - Selected papers

    Ingels

  1312. Ingels, J (2015) A heuristic procedure to proactively increase employee substitutability and personnel roster robustness, 669--672 (Abstract) (link to paper)
  1313. Ingels, J (2013) The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation, 684--686 (Abstract) (link to paper)

  1314. (Menu for Ingels) All papers - Full papers - Abstracts - Selected papers

    Innorta

  1315. Innorta, M (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  1316. (Menu for Innorta) All papers - Full papers - Abstracts - Selected papers

    Ionescu

  1317. Ionescu, L (2015) Stability and Flexibility of Crew and Aircraft Schedules, 785--787 (Abstract) (link to paper)

  1318. (Menu for Ionescu) All papers - Full papers - Abstracts - Selected papers

    Ishii

  1319. Ishii, R (2015) Scheduling competition in the airline industry and the issue of duplicate bookings, 55--62 (Full Paper) (link to paper)

  1320. (Menu for Ishii) All papers - Full papers - Abstracts - Selected papers

    Jain

  1321. Jain, S (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  1322. Jain, S (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
  1323. Jain, S (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  1324. (Menu for Jain) All papers - Full papers - Abstracts - Selected papers

    Jampani

  1325. Jampani, J (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
  1326. Jampani, J (2008) Column generation heuristics for multiple machine, multiple orders per job scheduling problems, 261--273 (Selected Paper) (link to paper)
  1327. Jampani, J (2007) Complex Job Shop Multiple Orders per Job Scheduling, 225--233 (Full Paper) (link to paper)

  1328. (Menu for Jampani) All papers - Full papers - Abstracts - Selected papers

    Janiak

  1329. Janiak, A (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)

  1330. (Menu for Janiak) All papers - Full papers - Abstracts - Selected papers

    Jansen

  1331. Jansen, P (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)

  1332. (Menu for Jansen) All papers - Full papers - Abstracts - Selected papers

    Jarboui

  1333. Jarboui, B (2007) New Lower Bound for the Bin Packing Problem, 234--241 (Full Paper) (link to paper)

  1334. (Menu for Jarboui) All papers - Full papers - Abstracts - Selected papers

    Jat

  1335. Jat, S. N (2009) A Guided Search Genetic Algorithm for the University Course Timetabling Problem, 180--191 (Full Paper) (link to paper)
  1336. Jat, S. N. (2011) A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling, 617--637 (Selected Paper) (link to paper)

  1337. (Menu for Jat) All papers - Full papers - Abstracts - Selected papers

    Jennings

  1338. Jennings, P (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)

  1339. (Menu for Jennings) All papers - Full papers - Abstracts - Selected papers

    Jolai

  1340. Jolai, F (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  1341. (Menu for Jolai) All papers - Full papers - Abstracts - Selected papers

    Jouglet

  1342. Jouglet, A (2013) Minimizing the dissemination length in the one-datum-unit data transfer problem, 587--589 (Abstract) (link to paper)
  1343. Jouglet, A (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  1344. Jouglet, A (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
  1345. Jouglet, A (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)

  1346. (Menu for Jouglet) All papers - Full papers - Abstracts - Selected papers

    Jozefowiez

  1347. Jozefowiez, N (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  1348. (Menu for Jozefowiez) All papers - Full papers - Abstracts - Selected papers

    Juhn

  1349. Juhn, J. H (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  1350. (Menu for Juhn) All papers - Full papers - Abstracts - Selected papers

    Juraszek

  1351. Juraszek, J (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)
  1352. Juraszek, J (2009) Scheduling policy for on-line translation service, 266--276 (Full Paper) (link to paper)

  1353. (Menu for Juraszek) All papers - Full papers - Abstracts - Selected papers

    Kalagnanam

  1354. Kalagnanam, J (2007) Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming, 120--127 (Full Paper) (link to paper)

  1355. (Menu for Kalagnanam) All papers - Full papers - Abstracts - Selected papers

    Kalic

  1356. Kalic, M (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  1357. (Menu for Kalic) All papers - Full papers - Abstracts - Selected papers

    Kalsch

  1358. Kalsch, M. T (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)

  1359. (Menu for Kalsch) All papers - Full papers - Abstracts - Selected papers

    Kamel

  1360. Kamel, A. E (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)

  1361. (Menu for Kamel) All papers - Full papers - Abstracts - Selected papers

    Kampmeyer

  1362. Kampmeyer, T (2008) Cyclic job shop scheduling problems with blocking, 161--181 (Selected Paper) (link to paper)
  1363. Kampmeyer, T (2005) Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking, 107--108 (Abstract) (link to paper)

  1364. (Menu for Kampmeyer) All papers - Full papers - Abstracts - Selected papers

    Kaplansky

  1365. Kaplansky, E (2003) University Timetabling – A Case Study for Scheduling Agents, 56--59 (Abstract) (link to paper)

  1366. (Menu for Kaplansky) All papers - Full papers - Abstracts - Selected papers

    Karaesmen

  1367. Karaesmen, I (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
  1368. Karaesmen, I. Z (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
  1369. Karaesmen, I. Z (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)

  1370. (Menu for Karaesmen) All papers - Full papers - Abstracts - Selected papers

    Karapetyan

  1371. Karapetyan, D (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)

  1372. (Menu for Karapetyan) All papers - Full papers - Abstracts - Selected papers

    Karhi

  1373. Karhi, S (2015) Online and semi-online scheduling of two job types on a set of multipurpose machines, 626--628 (Abstract) (link to paper)

  1374. (Menu for Karhi) All papers - Full papers - Abstracts - Selected papers

    Karim

  1375. Karim, A (2013) Reentrance and exact time lag on flow shop scheduling problem, 610--612 (Abstract) (link to paper)

  1376. (Menu for Karim) All papers - Full papers - Abstracts - Selected papers

    Kasirzadeh

  1377. Kasirzadeh, A (2015) An integrated simultaneous approach for pilots and copilots re-scheduling problem, 943--945 (Abstract) (link to paper)

  1378. (Menu for Kasirzadeh) All papers - Full papers - Abstracts - Selected papers

    Katzensteiner

  1379. Katzensteiner, C. A. · S (2009) A VNS-based solution approach for a flexible flow shop problem with limited buffer, 706--708 (Abstract) (link to paper)

  1380. (Menu for Katzensteiner) All papers - Full papers - Abstracts - Selected papers

    Kedad-Sidhoum

  1381. Kedad-Sidhoum, S (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
  1382. Kedad-Sidhoum, S (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)
  1383. Kedad-Sidhoum, S (2013) Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases, 757--761 (Abstract) (link to paper)
  1384. Kedad-Sidhoum, S (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)
  1385. Kedad-Sidhoum, S (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)

  1386. (Menu for Kedad-Sidhoum) All papers - Full papers - Abstracts - Selected papers

    Keha

  1387. Keha, A (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  1388. Keha, A (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  1389. Keha, A (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  1390. Keha, A (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
  1391. Keha, A. B (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
  1392. Keha, A (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
  1393. Keha, A. B (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
  1394. Keha, A (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)

  1395. (Menu for Keha) All papers - Full papers - Abstracts - Selected papers

    Kellerer

  1396. Kellerer, H (2013) Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product, 577--579 (Abstract) (link to paper)

  1397. (Menu for Kellerer) All papers - Full papers - Abstracts - Selected papers

    Kelly

  1398. Kelly, J. D. (2005) The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic-Quality Paradigm (QLQP) for Production Scheduling in the Process Industries, 327--333 (Abstract) (link to paper)

  1399. (Menu for Kelly) All papers - Full papers - Abstracts - Selected papers

    Kemmoe-Tchomte

  1400. Kemmoe-Tchomte, S (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)

  1401. (Menu for Kemmoe-Tchomte) All papers - Full papers - Abstracts - Selected papers

    Kempf

  1402. Kempf, K. G (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  1403. (Menu for Kempf) All papers - Full papers - Abstracts - Selected papers

    Kendall

  1404. Kendall, G (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
  1405. Kendall, G (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  1406. Kendall, G (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  1407. Kendall, G (2003) An Investigation of an Adaptive Scheduling Approach for Multi Head Placement Machines, 363--381 (Full Paper) (link to paper)
  1408. Kendall, G (2009) An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem, 823--826 (Abstract) (link to paper)
  1409. Kendall, G (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
  1410. Kendall, G (2009) Preface, 563--564 (Selected Paper) (link to paper)
  1411. Kendall, G (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  1412. Kendall, G (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  1413. Kendall, G (2003) Application of Genetic Algorithm Based Hyper-heuristics to Personnel Scheduling Problems, 528--539 (Abstract) (link to paper)
  1414. Kendall, G (2003) An Investigation of a Tabu Search Based Hyper-heuristic for Examination Timetabling, 226--235 (Abstract) (link to paper)
  1415. Kendall, G (2005) An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling, 309--328 (Selected Paper) (link to paper)
  1416. Kendall, G (2003) Channel Assignment Optimisation Using an Adaptive Heuristic, 492--505 (Abstract) (link to paper)
  1417. Kendall, G (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
  1418. Kendall, G (2011) Preface, 407--407 (Selected Paper) (link to paper)
  1419. Kendall, G (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
  1420. Kendall, G (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  1421. Kendall, G (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  1422. Kendall, G (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)
  1423. Kendall, G (2008) Preface, 1--3 (Selected Paper) (link to paper)
  1424. Kendall, G (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)
  1425. Kendall, G (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)

  1426. (Menu for Kendall) All papers - Full papers - Abstracts - Selected papers

    Kergosien

  1427. Kergosien, Y (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)

  1428. (Menu for Kergosien) All papers - Full papers - Abstracts - Selected papers

    Keskinocak

  1429. Keskinocak, P (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
  1430. Keskinocak, P (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
  1431. Keskinocak, P (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)

  1432. (Menu for Keskinocak) All papers - Full papers - Abstracts - Selected papers

    Khader

  1433. Khader, A. T (2009) A hybrid harmony search for university course timetabling, 157--179 (Full Paper) (link to paper)

  1434. (Menu for Khader) All papers - Full papers - Abstracts - Selected papers

    Kheiri

  1435. Kheiri, A (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)

  1436. (Menu for Kheiri) All papers - Full papers - Abstracts - Selected papers

    Khosravi

  1437. Khosravi, B (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)

  1438. (Menu for Khosravi) All papers - Full papers - Abstracts - Selected papers

    Khowala

  1439. Khowala, K (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
  1440. Khowala, K (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  1441. Khowala, K (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)

  1442. (Menu for Khowala) All papers - Full papers - Abstracts - Selected papers

    Kim

  1443. Kim, Y.K (2003) Using an Artificial Intelligence Search Technique in a Manufacturing Planning and Scheduling Environment, 388--402 (Abstract) (link to paper)

  1444. (Menu for Kim) All papers - Full papers - Abstracts - Selected papers

    Kimbrel

  1445. Kimbrel, T (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
  1446. Kimbrel, T (2005) A survey on minimizing makespan for the preemptive job with two machine, 337--339 (Abstract) (link to paper)

  1447. (Menu for Kimbrel) All papers - Full papers - Abstracts - Selected papers

    Kinable

  1448. Kinable, J. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  1449. (Menu for Kinable) All papers - Full papers - Abstracts - Selected papers

    Kirchner

  1450. Kirchner, S (2015) Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation, 849--851 (Abstract) (link to paper)

  1451. (Menu for Kirchner) All papers - Full papers - Abstracts - Selected papers

    Kirkbride

  1452. Kirkbride, C (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
  1453. Kirkbride, C (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  1454. (Menu for Kirkbride) All papers - Full papers - Abstracts - Selected papers

    Kis

  1455. Kis, T (2015) Solving resource constrained shortest path problems with branch-and-cut, 677--679 (Abstract) (link to paper)

  1456. (Menu for Kis) All papers - Full papers - Abstracts - Selected papers

    Kliewer

  1457. Kliewer, N (2015) Stability and Flexibility of Crew and Aircraft Schedules, 785--787 (Abstract) (link to paper)

  1458. (Menu for Kliewer) All papers - Full papers - Abstracts - Selected papers

    Klos

  1459. Klos, T (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
  1460. Klos, T (2015) Robustness of Partial Order Schedules: Understanding the Chaining algorithm, 457--472 (Full Paper) (link to paper)
  1461. Klos, T (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)

  1462. (Menu for Klos) All papers - Full papers - Abstracts - Selected papers

    Knopp

  1463. Knopp, S (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)

  1464. (Menu for Knopp) All papers - Full papers - Abstracts - Selected papers

    Knowles

  1465. Knowles, J (2015) Iterated Local Search for the Generator Maintenance Scheduling Problem, 708--742 (Abstract) (link to paper)

  1466. (Menu for Knowles) All papers - Full papers - Abstracts - Selected papers

    Ko

  1467. Ko, J (2003) Using an Artificial Intelligence Search Technique in a Manufacturing Planning and Scheduling Environment, 388--402 (Abstract) (link to paper)

  1468. (Menu for Ko) All papers - Full papers - Abstracts - Selected papers

    Kochaniková

  1469. Kochaniková, B (2013) Student Scheduling for Bachelor State Examinations, 762--766 (Abstract) (link to paper)

  1470. (Menu for Kochaniková) All papers - Full papers - Abstracts - Selected papers

    Kok

  1471. Kok, A.L (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)

  1472. (Menu for Kok) All papers - Full papers - Abstracts - Selected papers

    Koksalan

  1473. Koksalan, M (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  1474. (Menu for Koksalan) All papers - Full papers - Abstracts - Selected papers

    Konig

  1475. Konig, J-C. (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  1476. (Menu for Konig) All papers - Full papers - Abstracts - Selected papers

    Kononov

  1477. Kononov, A (2007) Scheduling Resumable Deteriorating Jobs, 567--569 (Abstract) (link to paper)

  1478. (Menu for Kononov) All papers - Full papers - Abstracts - Selected papers

    Koole

  1479. Koole, G. M (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  1480. Koole, G. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  1481. (Menu for Koole) All papers - Full papers - Abstracts - Selected papers

    Korhonen

  1482. Korhonen, P (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  1483. (Menu for Korhonen) All papers - Full papers - Abstracts - Selected papers

    Korosec

  1484. Korosec, P (2009) Metaheuristic Approach to Loading Schedule Problem, 616--627 (Full Paper) (link to paper)

  1485. (Menu for Korosec) All papers - Full papers - Abstracts - Selected papers

    Koukam

  1486. Koukam, A (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)

  1487. (Menu for Koukam) All papers - Full papers - Abstracts - Selected papers

    Koulamas

  1488. Koulamas, C (2011) Minimizing the sum of quadratic completion times on two identical parallel machines, 240--244 (Full Paper) (link to paper)

  1489. (Menu for Koulamas) All papers - Full papers - Abstracts - Selected papers

    Kozik

  1490. Kozik, A (2015) A novel Approximate/Exact objective based search technique for precedence constrained scheduling problems, 484--491 (Full Paper) (link to paper)

  1491. (Menu for Kozik) All papers - Full papers - Abstracts - Selected papers

    Kozma

  1492. Kozma, R. (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  1493. (Menu for Kozma) All papers - Full papers - Abstracts - Selected papers

    Kramer

  1494. Kramer, L. A (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)

  1495. (Menu for Kramer) All papers - Full papers - Abstracts - Selected papers

    Krasik

  1496. Krasik, V (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)

  1497. (Menu for Krasik) All papers - Full papers - Abstracts - Selected papers

    Krass

  1498. Krass, D (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)

  1499. (Menu for Krass) All papers - Full papers - Abstracts - Selected papers

    Kravchenko

  1500. Kravchenko, S. A (2009) Parallel Machine Problems with Equal Processing Times, 458--468 (Full Paper) (link to paper)
  1501. Kravchenko, S. A (2011) Parallel machine problems with equal processing times: a survey, 435--444 (Selected Paper) (link to paper)

  1502. (Menu for Kravchenko) All papers - Full papers - Abstracts - Selected papers

    Kristiansen

  1503. Kristiansen, S (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
  1504. Kristiansen, S (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)

  1505. (Menu for Kristiansen) All papers - Full papers - Abstracts - Selected papers

    Krivulin

  1506. Krivulin, N (2015) Tropical optimization problems in project scheduling, 492--506 (Full Paper) (link to paper)

  1507. (Menu for Krivulin) All papers - Full papers - Abstracts - Selected papers

    Krogt

  1508. Krogt, R. v. (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  1509. (Menu for Krogt) All papers - Full papers - Abstracts - Selected papers

    Kruk

  1510. Kruk, S (2007) A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem, 267--275 (Full Paper) (link to paper)

  1511. (Menu for Kruk) All papers - Full papers - Abstracts - Selected papers

    Krumke

  1512. Krumke, S. O (2008) Pruning in column generation for service vehicle dispatching, 355--371 (Selected Paper) (link to paper)
  1513. Krumke, S. O (2005) Improved Pruningin Columngeneration Of A Vehicle Routing Problem, 705--722 (Full Paper) (link to paper)

  1514. (Menu for Krumke) All papers - Full papers - Abstracts - Selected papers

    Kubiak

  1515. Kubiak, W (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
  1516. Kubiak, W (2007) The Parallel Machine Scheduling Problem with Path-like Constraints, 570--571 (Abstract) (link to paper)

  1517. (Menu for Kubiak) All papers - Full papers - Abstracts - Selected papers

    Kuefer

  1518. Kuefer, K-H. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)

  1519. (Menu for Kuefer) All papers - Full papers - Abstracts - Selected papers

    Kufer

  1520. Kufer, K-H. (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
  1521. Kufer, K-H. (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)

  1522. (Menu for Kufer) All papers - Full papers - Abstracts - Selected papers

    Kuhpfahl

  1523. Kuhpfahl, J (2011) Computational Comparison of Neighbourhoods for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective, 536--538 (Abstract) (link to paper)
  1524. Kuhpfahl, J (2013) A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness, 613--616 (Abstract) (link to paper)

  1525. (Menu for Kuhpfahl) All papers - Full papers - Abstracts - Selected papers

    Kumar

  1526. Kumar, M (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)

  1527. (Menu for Kumar) All papers - Full papers - Abstracts - Selected papers

    Kurz

  1528. Kurz, M. E (2011) Adapting Particle Swarm Optimization for the Flexible Flow Line, 653--656 (Abstract) (link to paper)

  1529. (Menu for Kurz) All papers - Full papers - Abstracts - Selected papers

    Kutanoglu

  1530. Kutanoglu, E (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  1531. Kutanoglu, E (2005) Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing, 334--334 (Abstract) (link to paper)
  1532. Kutanoglu, E (2008) Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem, 5--24 (Selected Paper) (link to paper)

  1533. (Menu for Kutanoglu) All papers - Full papers - Abstracts - Selected papers

    Kvaratskhelia

  1534. Kvaratskhelia, A (2009) Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem, 68--76 (Full Paper) (link to paper)

  1535. (Menu for Kvaratskhelia) All papers - Full papers - Abstracts - Selected papers

    Kwan

  1536. Kwan, A. S. K (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
  1537. Kwan, R. S. K (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
  1538. Kwan, R. S.K (2011) Case studies of successful train crew scheduling optimisation, 423--434 (Selected Paper) (link to paper)
  1539. Kwan, R.S.K (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
  1540. Kwan, R. S. K (2009) Case studies of successful train crew scheduling optimization, 43--57 (Full Paper) (link to paper)
  1541. Kwan, R. S (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)
  1542. Kwan, R.S.K (2003) A Co-Evolutionary Approach for Train Timetabling, 701--703 (Abstract) (link to paper)
  1543. Kwan, A.S.K (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
  1544. Kwan, R.S.K (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
  1545. Kwan, A. S. K (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
  1546. Kwan, R. S. K (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
  1547. Kwan, R. S. K (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)

  1548. (Menu for Kwan) All papers - Full papers - Abstracts - Selected papers

    Kyngäs

  1549. Kyngäs, J (2007) A Framework for School Timetabling Problem, 386--393 (Full Paper) (link to paper)
  1550. Kyngäs, J (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)

  1551. (Menu for Kyngäs) All papers - Full papers - Abstracts - Selected papers

    König

  1552. König, J.-C (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)

  1553. (Menu for König) All papers - Full papers - Abstracts - Selected papers

    Labane

  1554. Labane, M (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  1555. (Menu for Labane) All papers - Full papers - Abstracts - Selected papers

    Laborie

  1556. Laborie, P (2007) Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems, 276--284 (Full Paper) (link to paper)
  1557. Laborie, P. (2016) Temporal linear relaxation in IBM ILOG CP Optimizer, 391--400 (Selected Paper) (link to paper)
  1558. Laborie, P (2013) Temporal Linear Relaxation in IBM ILOG CP Optimizer, 379--391 (Full Paper) (link to paper)

  1559. (Menu for Laborie) All papers - Full papers - Abstracts - Selected papers

    Lach

  1560. Lach, G (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
  1561. Lach, M (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
  1562. Lach, M (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
  1563. Lach, G (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
  1564. Lach, G (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)

  1565. (Menu for Lach) All papers - Full papers - Abstracts - Selected papers

    Lacomme

  1566. Lacomme, P (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)

  1567. (Menu for Lacomme) All papers - Full papers - Abstracts - Selected papers

    Laforest

  1568. Laforest, C (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)
  1569. Laforest, C (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)

  1570. (Menu for Laforest) All papers - Full papers - Abstracts - Selected papers

    Lam

  1571. Lam, W- (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)

  1572. (Menu for Lam) All papers - Full papers - Abstracts - Selected papers

    Lamas

  1573. Lamas, P. (2016) A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, 409--428 (Selected Paper) (link to paper)
  1574. Lamas, P (2013) The stochastic resource-constrained project scheduling problem under different confidence levels, 774--776 (Abstract) (link to paper)

  1575. (Menu for Lamas) All papers - Full papers - Abstracts - Selected papers

    Lambrecht

  1576. Lambrecht, M (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)
  1577. Lambrecht, M (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)

  1578. (Menu for Lambrecht) All papers - Full papers - Abstracts - Selected papers

    Lambrechts

  1579. Lambrechts, O (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
  1580. Lambrechts, O (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)

  1581. (Menu for Lambrechts) All papers - Full papers - Abstracts - Selected papers

    Lamorgese

  1582. Lamorgese, L (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)

  1583. (Menu for Lamorgese) All papers - Full papers - Abstracts - Selected papers

    Lamy

  1584. Lamy, D (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)

  1585. (Menu for Lamy) All papers - Full papers - Abstracts - Selected papers

    Lancia

  1586. Lancia, G (2013) Scheduling teams for aircraft ground maintenance, 649--651 (Abstract) (link to paper)
  1587. Lancia, G (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)

  1588. (Menu for Lancia) All papers - Full papers - Abstracts - Selected papers

    Landa-Silva

  1589. Landa-Silva, J. D (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  1590. Landa-Silva, D (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)

  1591. (Menu for Landa-Silva) All papers - Full papers - Abstracts - Selected papers

    Lane

  1592. Lane, J.P (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)

  1593. (Menu for Lane) All papers - Full papers - Abstracts - Selected papers

    Lange

  1594. Lange, J (2015) Approaches to modeling job-shop problems with blocking constraints, 645--648 (Abstract) (link to paper)

  1595. (Menu for Lange) All papers - Full papers - Abstracts - Selected papers

    Lanquepin

  1596. Lanquepin, G (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  1597. (Menu for Lanquepin) All papers - Full papers - Abstracts - Selected papers

    Lapierre

  1598. Lapierre, S (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  1599. (Menu for Lapierre) All papers - Full papers - Abstracts - Selected papers

    Laplagne

  1600. Laplagne, I (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
  1601. Laplagne, I (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)

  1602. (Menu for Laplagne) All papers - Full papers - Abstracts - Selected papers

    Lapègue

  1603. Lapègue, T (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)

  1604. (Menu for Lapègue) All papers - Full papers - Abstracts - Selected papers

    Larabi

  1605. Larabi, M (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)

  1606. (Menu for Larabi) All papers - Full papers - Abstracts - Selected papers

    Lau

  1607. Lau, H. C. (2005) Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties, 196--212 (Abstract) (link to paper)
  1608. Lau, H. C. (2008) Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, 83--95 (Selected Paper) (link to paper)
  1609. Lau, H. C (2009) Master Physician Scheduling Problem, 145--156 (Full Paper) (link to paper)
  1610. Lau, H. Y.K (2008) Integrated scheduling of handling equipment at automated container terminals, 373--394 (Selected Paper) (link to paper)
  1611. Lau, H. C. (2007) Generating Job Schedules for Vessel Operations in a Container Terminal, 328--335 (Full Paper) (link to paper)
  1612. Lau, H. Y. K (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)
  1613. Lau, H.C (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)

  1614. (Menu for Lau) All papers - Full papers - Abstracts - Selected papers

    Laub

  1615. Laub, J. D (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
  1616. Laub, J. D (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)

  1617. (Menu for Laub) All papers - Full papers - Abstracts - Selected papers

    Laurent

  1618. Laurent, B (2007) Integrated Vehicle and Crew Scheduling for Extra-Urban Transport, 578--580 (Abstract) (link to paper)

  1619. (Menu for Laurent) All papers - Full papers - Abstracts - Selected papers

    Lauret

  1620. Lauret, J (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)
  1621. Lauret, J (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)

  1622. (Menu for Lauret) All papers - Full papers - Abstracts - Selected papers

    Lazarev

  1623. Lazarev, A. A (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
  1624. Lazarev, A. A (2007) Estimation of Absolute Error for Minimization Maximum Lateness, 309--315 (Full Paper) (link to paper)
  1625. Lazarev, A. A (2009) Estimation of absolute error for the resources-constrained project scheduling problem, 671--678 (Abstract) (link to paper)
  1626. Lazarev, A (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)
  1627. Lazarev, A (2009) Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem, 68--76 (Full Paper) (link to paper)
  1628. Lazarev, A (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  1629. (Menu for Lazarev) All papers - Full papers - Abstracts - Selected papers

    Lazarov

  1630. Lazarov, A.A (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)

  1631. (Menu for Lazarov) All papers - Full papers - Abstracts - Selected papers

    Lee

  1632. Lee, I. S (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  1633. (Menu for Lee) All papers - Full papers - Abstracts - Selected papers

    Leggate

  1634. Leggate, A (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  1635. (Menu for Leggate) All papers - Full papers - Abstracts - Selected papers

    Lehoux-Lebacque

  1636. Lehoux-Lebacque, V (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
  1637. Lehoux-Lebacque, V (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)

  1638. (Menu for Lehoux-Lebacque) All papers - Full papers - Abstracts - Selected papers

    Lei

  1639. Lei, L (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
  1640. Lei, L (2008) Preface, 1--3 (Selected Paper) (link to paper)
  1641. Lei, L (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
  1642. Lei, L (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)
  1643. Lei, L (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)
  1644. Lei, L (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)

  1645. (Menu for Lei) All papers - Full papers - Abstracts - Selected papers

    Leithauser

  1646. Leithauser, N (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)

  1647. (Menu for Leithauser) All papers - Full papers - Abstracts - Selected papers

    Lemaire

  1648. Lemaire, P (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)
  1649. Lemaire, P (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)

  1650. (Menu for Lemaire) All papers - Full papers - Abstracts - Selected papers

    Lennartz

  1651. Lennartz, P (2003) The Relation Between the No-Wait Job Shop Problem and the Traveling Salesman Problem, 419--421 (Abstract) (link to paper)

  1652. (Menu for Lennartz) All papers - Full papers - Abstracts - Selected papers

    Lenstra

  1653. Lenstra, J. K. (2005) Scheduling, a Critical Biography, 4--4 (Abstract) (link to paper)

  1654. (Menu for Lenstra) All papers - Full papers - Abstracts - Selected papers

    Lente

  1655. Lente, C (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
  1656. Lente, C (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)

  1657. (Menu for Lente) All papers - Full papers - Abstracts - Selected papers

    Lenté

  1658. Lenté, C (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)

  1659. (Menu for Lenté) All papers - Full papers - Abstracts - Selected papers

    Leoff

  1660. Leoff, J. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)
  1661. Leoff, J (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)

  1662. (Menu for Leoff) All papers - Full papers - Abstracts - Selected papers

    Leong

  1663. Leong, T (2007) Generating Job Schedules for Vessel Operations in a Container Terminal, 328--335 (Full Paper) (link to paper)

  1664. (Menu for Leong) All papers - Full papers - Abstracts - Selected papers

    Lesaint

  1665. Lesaint, D (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  1666. (Menu for Lesaint) All papers - Full papers - Abstracts - Selected papers

    Leung

  1667. Leung, J. Y-T. (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
  1668. Leung, J. M.Y (2005) Timetable Synchronization for Mass Transit, 516--517 (Abstract) (link to paper)
  1669. Leung, J. Y-T. (2005) Online Scheduling Of Precedence Constrained Tasks, 573--584 (Full Paper) (link to paper)
  1670. Leung, J (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
  1671. Leung, J (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
  1672. Leung, J. Y-T. (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
  1673. Leung, J. Y.-T (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
  1674. Leung, J. Y-T. (2005) Scheduling Algorithms for Master-Slave System, 501--513 (Full Paper) (link to paper)
  1675. Leung, J. Y.-T (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
  1676. Leung, J. Y.-T (2008) Scheduling problems in master-slave model, 215--231 (Selected Paper) (link to paper)
  1677. Leung, L. C. K (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
  1678. Leung, J. Y.-T (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)

  1679. (Menu for Leung) All papers - Full papers - Abstracts - Selected papers

    Leus

  1680. Leus, R. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
  1681. Leus, R (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)
  1682. Leus, R (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
  1683. Leus, R (2009) Solving a dock assignment problem as a three-stage flexible flow-shop problem, 752--755 (Abstract) (link to paper)
  1684. Leus, R (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  1685. Leus, R (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
  1686. Leus, R (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  1687. Leus, R (2007) Project Scheduling with Success or Failure in Individual Activities, 584--587 (Abstract) (link to paper)
  1688. Leus, R (2005) Stable Single-machine Schedules, 213--214 (Abstract) (link to paper)
  1689. Leus, R (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
  1690. Leus, R (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
  1691. Leus, R (2003) Resource Allocation for Stability in Reactive Project Scheduling, 116--119 (Abstract) (link to paper)

  1692. (Menu for Leus) All papers - Full papers - Abstracts - Selected papers

    Levine

  1693. Levine, J (2003) Ants Can Solve Difficult Bin Packing Problems, 90--91 (Abstract) (link to paper)
  1694. Levine, J (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)

  1695. (Menu for Levine) All papers - Full papers - Abstracts - Selected papers

    Levner

  1696. Levner, E (2015) A general technique for improving the complexity of FPTAS for scheduling problems, 743--745 (Abstract) (link to paper)
  1697. Levner, E (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)

  1698. (Menu for Levner) All papers - Full papers - Abstracts - Selected papers

    Lewis

  1699. Lewis, R (2009) Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling, 718--719 (Abstract) (link to paper)

  1700. (Menu for Lewis) All papers - Full papers - Abstracts - Selected papers

    Li

  1701. Li, J (2003) Explicit Learning: an Effort towards Human Scheduling Algorithms, 240--243 (Abstract) (link to paper)
  1702. Li, H (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
  1703. Li, S (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)
  1704. Li, H (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
  1705. Li, H (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
  1706. Li, X (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
  1707. Li, J (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  1708. Li, H (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
  1709. Li, H (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
  1710. Li, J-Q. (2011) Schedule Recovery Strategies in Public and Freight Transportation Systems under Disruptions, 484--485 (Abstract) (link to paper)
  1711. Li, J-Q. (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  1712. (Menu for Li) All papers - Full papers - Abstracts - Selected papers

    Liberti

  1713. Liberti, L (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)
  1714. Liberti, L (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)

  1715. (Menu for Liberti) All papers - Full papers - Abstracts - Selected papers

    Lichtenstein

  1716. Lichtenstein, M (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)

  1717. (Menu for Lichtenstein) All papers - Full papers - Abstracts - Selected papers

    Liedlo?

  1718. Liedlo?, M (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)

  1719. (Menu for Liedlo?) All papers - Full papers - Abstracts - Selected papers

    Liedloff

  1720. Liedloff, M (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)

  1721. (Menu for Liedloff) All papers - Full papers - Abstracts - Selected papers

    Limtanyakul

  1722. Limtanyakul, K (2007) Scheduling Tests on Vehicle Prototypes using Constraint Programming, 336--343 (Full Paper) (link to paper)

  1723. (Menu for Limtanyakul) All papers - Full papers - Abstracts - Selected papers

    Limère

  1724. Limère, V (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)

  1725. (Menu for Limère) All papers - Full papers - Abstracts - Selected papers

    Lin

  1726. Lin, Y.K (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)
  1727. Lin, Y-K. (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
  1728. Lin, E. Y.H (2009) On the Effective Approach of Teaching Activity Scheduling in Project Management, 764--764 (Abstract) (link to paper)
  1729. Lin, S-W. (2005) A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties, 299--314 (Full Paper) (link to paper)
  1730. Lin, G. J (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)

  1731. (Menu for Lin) All papers - Full papers - Abstracts - Selected papers

    Lindahl

  1732. Lindahl, M (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)

  1733. (Menu for Lindahl) All papers - Full papers - Abstracts - Selected papers

    Lingireddy

  1734. Lingireddy, S (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)

  1735. (Menu for Lingireddy) All papers - Full papers - Abstracts - Selected papers

    Liret

  1736. Liret, A (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  1737. (Menu for Liret) All papers - Full papers - Abstracts - Selected papers

    Lisovoy

  1738. Lisovoy, A (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)

  1739. (Menu for Lisovoy) All papers - Full papers - Abstracts - Selected papers

    Lisser

  1740. Lisser, A (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
  1741. Lisser, A. (2016) Uplink scheduling for joint wireless orthogonal frequency and time division multiple access networks, 349--366 (Selected Paper) (link to paper)
  1742. Lisser, A (2014) Stochastic and semidefinite optimization for scheduling in orthogonal frequency division multiple access networks, 445--469 (Selected Paper) (link to paper)
  1743. Lisser, A (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
  1744. Lisser, A (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  1745. (Menu for Lisser) All papers - Full papers - Abstracts - Selected papers

    Little

  1746. Little, J (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  1747. (Menu for Little) All papers - Full papers - Abstracts - Selected papers

    Liu

  1748. Liu, S (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)

  1749. (Menu for Liu) All papers - Full papers - Abstracts - Selected papers

    Lokhmotov

  1750. Lokhmotov, A (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  1751. (Menu for Lokhmotov) All papers - Full papers - Abstracts - Selected papers

    Lopes

  1752. Lopes, I.C (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)

  1753. (Menu for Lopes) All papers - Full papers - Abstracts - Selected papers

    Lopez

  1754. Lopez, P (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  1755. (Menu for Lopez) All papers - Full papers - Abstracts - Selected papers

    Lopez-Ibanez

  1756. Lopez-Ibanez, M (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  1757. (Menu for Lopez-Ibanez) All papers - Full papers - Abstracts - Selected papers

    Loucks

  1758. Loucks, W. M (2007) EDF Feasibility and Hardware Accelerators, 368--376 (Full Paper) (link to paper)

  1759. (Menu for Loucks) All papers - Full papers - Abstracts - Selected papers

    Lozano

  1760. Lozano, A. J (2011) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 564--567 (Abstract) (link to paper)

  1761. (Menu for Lozano) All papers - Full papers - Abstracts - Selected papers

    Lozarno

  1762. Lozarno, A. J (2014) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 521--540 (Selected Paper) (link to paper)

  1763. (Menu for Lozarno) All papers - Full papers - Abstracts - Selected papers

    Lubbecke

  1764. Lubbecke, M.E (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)
  1765. Lubbecke, M (2015) Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation, 849--851 (Abstract) (link to paper)

  1766. (Menu for Lubbecke) All papers - Full papers - Abstracts - Selected papers

    Lucarelli

  1767. Lucarelli, G (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)

  1768. (Menu for Lucarelli) All papers - Full papers - Abstracts - Selected papers

    Lykourentzou

  1769. Lykourentzou, I (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  1770. (Menu for Lykourentzou) All papers - Full papers - Abstracts - Selected papers

    Løkketangen

  1771. Løkketangen, A (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  1772. (Menu for Løkketangen) All papers - Full papers - Abstracts - Selected papers

    M. Mahdian

  1773. M. Mahdian, (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  1774. (Menu for M. Mahdian) All papers - Full papers - Abstracts - Selected papers

    Ma

  1775. Ma, S (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  1776. (Menu for Ma) All papers - Full papers - Abstracts - Selected papers

    Macedo

  1777. Macedo, R (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  1778. (Menu for Macedo) All papers - Full papers - Abstracts - Selected papers

    Machowiak

  1779. Machowiak, M (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  1780. Machowiak, M (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)

  1781. (Menu for Machowiak) All papers - Full papers - Abstracts - Selected papers

    Mackulak

  1782. Mackulak, G. T (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)

  1783. (Menu for Mackulak) All papers - Full papers - Abstracts - Selected papers

    Maden

  1784. Maden, W (2003) Vehicle Routing and Scheduling with a Road Timetable, 700--700 (Abstract) (link to paper)
  1785. Maden, W (2005) Vehicle Routing And Scheduling With Time Varying Travel Times, 724--724 (Abstract) (link to paper)

  1786. (Menu for Maden) All papers - Full papers - Abstracts - Selected papers

    Madureira

  1787. Madureira, A (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)

  1788. (Menu for Madureira) All papers - Full papers - Abstracts - Selected papers

    Maenhout

  1789. Maenhout, B (2013) The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation, 684--686 (Abstract) (link to paper)
  1790. Maenhout, B (2009) Reactive Nurse Scheduling in Hospitals, 690--692 (Abstract) (link to paper)
  1791. Maenhout, B (2008) Comparison and hybridization of crossover operators for the nurse scheduling problem, 333--353 (Selected Paper) (link to paper)
  1792. Maenhout, B (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)
  1793. Maenhout, B (2007) A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences, 588--590 (Abstract) (link to paper)
  1794. Maenhout, B (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
  1795. Maenhout, B (2005) An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem, 410--411 (Abstract) (link to paper)
  1796. Maenhout, B (2015) A heuristic procedure to proactively increase employee substitutability and personnel roster robustness, 669--672 (Abstract) (link to paper)

  1797. (Menu for Maenhout) All papers - Full papers - Abstracts - Selected papers

    Maier

  1798. Maier, H. R (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)
  1799. Maier, H. R (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  1800. (Menu for Maier) All papers - Full papers - Abstracts - Selected papers

    Makatun

  1801. Makatun, D (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)

  1802. (Menu for Makatun) All papers - Full papers - Abstracts - Selected papers

    Manger

  1803. Manger, R (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)

  1804. (Menu for Manger) All papers - Full papers - Abstracts - Selected papers

    Mannino

  1805. Mannino, C (2011) Operational Surgery scheduling problems: Modelling and solving, 592--595 (Abstract) (link to paper)
  1806. Mannino, C (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)

  1807. (Menu for Mannino) All papers - Full papers - Abstracts - Selected papers

    Maravelias

  1808. Maravelias, C. T (2005) A Decomposition Approach For Batch Scheduling In The Process Industry, 66--67 (Abstract) (link to paper)

  1809. (Menu for Maravelias) All papers - Full papers - Abstracts - Selected papers

    Marecek

  1810. Marecek, J (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  1811. (Menu for Marecek) All papers - Full papers - Abstracts - Selected papers

    Marichal

  1812. Marichal, R. L (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  1813. (Menu for Marichal) All papers - Full papers - Abstracts - Selected papers

    Marinelli

  1814. Marinelli, F (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  1815. (Menu for Marinelli) All papers - Full papers - Abstracts - Selected papers

    Marla

  1816. Marla, L (2011) A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty, 352--365 (Full Paper) (link to paper)
  1817. Marla, L (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)

  1818. (Menu for Marla) All papers - Full papers - Abstracts - Selected papers

    Marmion

  1819. Marmion, M-E. (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  1820. (Menu for Marmion) All papers - Full papers - Abstracts - Selected papers

    Marquis

  1821. Marquis, J (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  1822. (Menu for Marquis) All papers - Full papers - Abstracts - Selected papers

    Marszalkowski

  1823. Marszalkowski, J (2015) Budgeted Internet Shopping Optimization Problem (B-ISOP), 885--887 (Abstract) (link to paper)
  1824. Marszalkowski, J (2015) Energy Consumption in Single- and Multi-installment Divisible Loads Processing in Systems with Hierarchical Memory, 146--153 (Full Paper) (link to paper)

  1825. (Menu for Marszalkowski) All papers - Full papers - Abstracts - Selected papers

    Martineau

  1826. Martineau, P (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)

  1827. (Menu for Martineau) All papers - Full papers - Abstracts - Selected papers

    Martinez

  1828. Martinez, Y (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)

  1829. (Menu for Martinez) All papers - Full papers - Abstracts - Selected papers

    Mascia

  1830. Mascia, F (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  1831. (Menu for Mascia) All papers - Full papers - Abstracts - Selected papers

    Mason

  1832. Mason, S. J (2008) Column generation heuristics for multiple machine, multiple orders per job scheduling problems, 261--273 (Selected Paper) (link to paper)
  1833. Mason, S. J (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
  1834. Mason, S. J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
  1835. Mason, a. S (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
  1836. Mason, S. J (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
  1837. Mason, S. J (2005) Multiple Orders Per Job Batch Scheduling With Incompatible Jobs, 48--64 (Full Paper) (link to paper)
  1838. Mason, S. J (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
  1839. Mason, S. J (2008) Multiple orders per job batch scheduling with incompatible jobs, 245--260 (Selected Paper) (link to paper)
  1840. Mason, S (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  1841. Mason, S. J (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  1842. Mason, S. J (2007) Complex Job Shop Multiple Orders per Job Scheduling, 225--233 (Full Paper) (link to paper)
  1843. Mason, A (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)

  1844. (Menu for Mason) All papers - Full papers - Abstracts - Selected papers

    Masri

  1845. Masri, H (2009) A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP), 277--290 (Full Paper) (link to paper)

  1846. (Menu for Masri) All papers - Full papers - Abstracts - Selected papers

    Mateo

  1847. Mateo, M (2013) An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem, 659--663 (Abstract) (link to paper)

  1848. (Menu for Mateo) All papers - Full papers - Abstracts - Selected papers

    Mateus

  1849. Mateus, G. R. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)

  1850. (Menu for Mateus) All papers - Full papers - Abstracts - Selected papers

    Mathirajan

  1851. Mathirajan, M (2015) Simulation Based Cause and Effect analysis of Input Variables in Wafer Fabrication, 345--359 (Full Paper) (link to paper)

  1852. (Menu for Mathirajan) All papers - Full papers - Abstracts - Selected papers

    Mati

  1853. Mati, Y (2009) Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach, 469--478 (Full Paper) (link to paper)
  1854. Mati, Y (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)

  1855. (Menu for Mati) All papers - Full papers - Abstracts - Selected papers

    Mattfield

  1856. Mattfield, D. C. (2005) Task Scheduling under Gang Constraints, 113--130 (Selected Paper) (link to paper)
  1857. Mattfield, D.C (2003) Task Scheduling under Gang Constraints, 506--523 (Full Paper) (link to paper)

  1858. (Menu for Mattfield) All papers - Full papers - Abstracts - Selected papers

    Mauergauz

  1859. Mauergauz, Y (2015) Production Scheduling Based on Order Utility Functions, 134--145 (Full Paper) (link to paper)

  1860. (Menu for Mauergauz) All papers - Full papers - Abstracts - Selected papers

    McCollum

  1861. McCollum, B. (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
  1862. McCollum, B (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  1863. McCollum, B (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)
  1864. McCollum, B (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  1865. McCollum, B (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)
  1866. McCollum, B (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
  1867. McCollum, B (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
  1868. McCollum, B (2015) Heuristics and Algorithms for Data Center Optimization, 921--927 (Abstract) (link to paper)
  1869. McCollum, B (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
  1870. McCollum, B (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  1871. McCollum, B (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
  1872. McCollum, B (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
  1873. McCollum, B (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  1874. McCollum, B (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
  1875. McCollum, B (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  1876. McCollum, B (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  1877. McCollum, B (2011) Preface, 407--407 (Selected Paper) (link to paper)
  1878. McCollum, B (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
  1879. McCollum, B (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)

  1880. (Menu for McCollum) All papers - Full papers - Abstracts - Selected papers

    McKenna

  1881. McKenna, J. S (2005) Skills-Based Agent Scheduling at Call Centers, 515--515 (Abstract) (link to paper)

  1882. (Menu for McKenna) All papers - Full papers - Abstracts - Selected papers

    McMullan

  1883. McMullan, P (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  1884. McMullan, P (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
  1885. McMullan, P (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
  1886. McMullan, P (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
  1887. McMullan, P. J (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  1888. McMullan, P (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
  1889. McMullan, P. J (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
  1890. McMullan, P (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  1891. McMullan, P (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)

  1892. (Menu for McMullan) All papers - Full papers - Abstracts - Selected papers

    Mecl

  1893. Mecl, R (2003) Integrating Planning into Production Scheduling: Visopt Shopfloor System, 259--278 (Full Paper) (link to paper)

  1894. (Menu for Mecl) All papers - Full papers - Abstracts - Selected papers

    Medaglia

  1895. Medaglia, A. L (2011) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 564--567 (Abstract) (link to paper)
  1896. Medaglia, A. L (2014) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 521--540 (Selected Paper) (link to paper)

  1897. (Menu for Medaglia) All papers - Full papers - Abstracts - Selected papers

    Meer

  1898. Meer, R. V. (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  1899. (Menu for Meer) All papers - Full papers - Abstracts - Selected papers

    Meisels

  1900. Meisels, A (2003) University Timetabling – A Case Study for Scheduling Agents, 56--59 (Abstract) (link to paper)

  1901. (Menu for Meisels) All papers - Full papers - Abstracts - Selected papers

    Melo

  1902. Melo, R. A (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)
  1903. Melo, R. A (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)

  1904. (Menu for Melo) All papers - Full papers - Abstracts - Selected papers

    Menezes

  1905. Menezes, G. C. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)

  1906. (Menu for Menezes) All papers - Full papers - Abstracts - Selected papers

    Mercy

  1907. Mercy, A (2013) Building university course timetables with minimized resulting student flows, 737--740 (Abstract) (link to paper)

  1908. (Menu for Mercy) All papers - Full papers - Abstracts - Selected papers

    Messelis

  1909. Messelis, T (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)

  1910. (Menu for Messelis) All papers - Full papers - Abstracts - Selected papers

    Meszka

  1911. Meszka, M (2005) Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique, 331--340 (Selected Paper) (link to paper)
  1912. Meszka, M (2003) Round Robin Tournaments with No Breaks in Home-Away Patterns, 602--603 (Abstract) (link to paper)

  1913. (Menu for Meszka) All papers - Full papers - Abstracts - Selected papers

    Meyer

  1914. Meyer, A (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)

  1915. (Menu for Meyer) All papers - Full papers - Abstracts - Selected papers

    Michel

  1916. Michel, S (2007) Inventory Routing Problem Solved by Heuristic Based on Column Generation, 361--367 (Full Paper) (link to paper)

  1917. (Menu for Michel) All papers - Full papers - Abstracts - Selected papers

    Mier

  1918. Mier, M. O. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  1919. (Menu for Mier) All papers - Full papers - Abstracts - Selected papers

    Mihaylov

  1920. Mihaylov, M (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)

  1921. (Menu for Mihaylov) All papers - Full papers - Abstracts - Selected papers

    Milis

  1922. Milis, I (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)

  1923. (Menu for Milis) All papers - Full papers - Abstracts - Selected papers

    Miller

  1924. Miller, T (2005) A Practitioner’s Approach To Distribution And Supply Chain Planning And Management, 519--519 (Abstract) (link to paper)

  1925. (Menu for Miller) All papers - Full papers - Abstracts - Selected papers

    Milne

  1926. Milne, J (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  1927. (Menu for Milne) All papers - Full papers - Abstracts - Selected papers

    Minella

  1928. Minella, G (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)

  1929. (Menu for Minella) All papers - Full papers - Abstracts - Selected papers

    Ming

  1930. Ming, N. K (2009) A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers, 606--615 (Full Paper) (link to paper)
  1931. Ming, N. K (2011) Two-level water-flow algorithm for vehicle routing problems, 493--496 (Abstract) (link to paper)

  1932. (Menu for Ming) All papers - Full papers - Abstracts - Selected papers

    Minty

  1933. Minty, R. J (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
  1934. Minty, R.J (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  1935. (Menu for Minty) All papers - Full papers - Abstracts - Selected papers

    Miori

  1936. Miori, V. M (2005) A Dynamic Programming Approach To The Truckload Routing Problem Using A Triplet Formulation, 725--738 (Abstract) (link to paper)

  1937. (Menu for Miori) All papers - Full papers - Abstracts - Selected papers

    Miralles

  1938. Miralles, C (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)

  1939. (Menu for Miralles) All papers - Full papers - Abstracts - Selected papers

    Mirault

  1940. Mirault, A (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)

  1941. (Menu for Mirault) All papers - Full papers - Abstracts - Selected papers

    Mirchandani

  1942. Mirchandani, P. B (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)
  1943. Mirchandani, P (2011) Schedule Recovery Strategies in Public and Freight Transportation Systems under Disruptions, 484--485 (Abstract) (link to paper)

  1944. (Menu for Mirchandani) All papers - Full papers - Abstracts - Selected papers

    Misir

  1945. Misir, M (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
  1946. Misir, M (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)

  1947. (Menu for Misir) All papers - Full papers - Abstracts - Selected papers

    Mistry

  1948. Mistry, P (2003) A Co-Evolutionary Approach for Train Timetabling, 701--703 (Abstract) (link to paper)

  1949. (Menu for Mistry) All papers - Full papers - Abstracts - Selected papers

    Mladenovi

  1950. Mladenovi, N (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)

  1951. (Menu for Mladenovi) All papers - Full papers - Abstracts - Selected papers

    Mladenovic

  1952. Mladenovic, N. (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  1953. (Menu for Mladenovic) All papers - Full papers - Abstracts - Selected papers

    Mohamad

  1954. Mohamad, M (2003) Channel Assignment Optimisation Using an Adaptive Heuristic, 492--505 (Abstract) (link to paper)

  1955. (Menu for Mohamad) All papers - Full papers - Abstracts - Selected papers

    Mokotoff

  1956. Mokotoff, E (2009) Minimizing the Makespan and Total Flow Time on the Permutation Flow Shop Scheduling Problem, 479--506 (Full Paper) (link to paper)

  1957. (Menu for Mokotoff) All papers - Full papers - Abstracts - Selected papers

    Molina

  1958. Molina, P (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)

  1959. (Menu for Molina) All papers - Full papers - Abstracts - Selected papers

    Monch

  1960. Monch, L (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)
  1961. Monch, L (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)
  1962. Monch, L (2009) Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 105--114 (Full Paper) (link to paper)
  1963. Monch, L (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  1964. Monch, L (2013) New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine, 687--690 (Abstract) (link to paper)

  1965. (Menu for Monch) All papers - Full papers - Abstracts - Selected papers

    Monkman

  1966. Monkman, S. K (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)

  1967. (Menu for Monkman) All papers - Full papers - Abstracts - Selected papers

    Montana

  1968. Montana, D (2005) A Comparison of Combinatorial Optimization and Dispatch Rules for Online Scheduling, 353--361 (Full Paper) (link to paper)
  1969. Montana, D (2003) A Comparison of Vishnu and OPL Studio, 554--565 (Abstract) (link to paper)

  1970. (Menu for Montana) All papers - Full papers - Abstracts - Selected papers

    Moreno

  1971. Moreno, L (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  1972. (Menu for Moreno) All papers - Full papers - Abstracts - Selected papers

    Moris

  1973. Moris, M.U (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  1974. (Menu for Moris) All papers - Full papers - Abstracts - Selected papers

    Morozov

  1975. Morozov, N (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  1976. (Menu for Morozov) All papers - Full papers - Abstracts - Selected papers

    Morrice

  1977. Morrice, D. J (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)

  1978. (Menu for Morrice) All papers - Full papers - Abstracts - Selected papers

    Morrison

  1979. Morrison, J. R (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
  1980. Morrison, J. R (2011) Scheduling Wafer Release in Clustered Photolithography Tools, 639--641 (Abstract) (link to paper)

  1981. (Menu for Morrison) All papers - Full papers - Abstracts - Selected papers

    Mort

  1982. Mort, N (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)

  1983. (Menu for Mort) All papers - Full papers - Abstracts - Selected papers

    Morton

  1984. Morton, A (2007) EDF Feasibility and Hardware Accelerators, 368--376 (Full Paper) (link to paper)

  1985. (Menu for Morton) All papers - Full papers - Abstracts - Selected papers

    Moukrim

  1986. Moukrim, A (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)
  1987. Moukrim, A (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)
  1988. Moukrim, A (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)
  1989. Moukrim, A (2015) Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits, 859--861 (Abstract) (link to paper)

  1990. (Menu for Moukrim) All papers - Full papers - Abstracts - Selected papers

    Mouloua

  1991. Mouloua, Z (2007) A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains, 410--417 (Full Paper) (link to paper)

  1992. (Menu for Mouloua) All papers - Full papers - Abstracts - Selected papers

    Mountakis

  1993. Mountakis, S (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)

  1994. (Menu for Mountakis) All papers - Full papers - Abstracts - Selected papers

    Moura

  1995. Moura, A (2013) Container Stowage and Short Sea Ship Routing Problem Optimization, 111--124 (Full Paper) (link to paper)

  1996. (Menu for Moura) All papers - Full papers - Abstracts - Selected papers

    Mourad

  1997. Mourad, B (2013) Reentrance and exact time lag on flow shop scheduling problem, 610--612 (Abstract) (link to paper)

  1998. (Menu for Mourad) All papers - Full papers - Abstracts - Selected papers

    Mualem

  1999. Mualem, A (2003) Bicriteria Scheduling for Parallel Jobs, 606--619 (Full Paper) (link to paper)

  2000. (Menu for Mualem) All papers - Full papers - Abstracts - Selected papers

    Mueller

  2001. Mueller, T. (2016) Real-life examination timetabling, 257--270 (Selected Paper) (link to paper)

  2002. (Menu for Mueller) All papers - Full papers - Abstracts - Selected papers

    Muguerza

  2003. Muguerza, M (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  2004. (Menu for Muguerza) All papers - Full papers - Abstracts - Selected papers

    Muhlenthaler

  2005. Muhlenthaler, M (2013) A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality, 300--313 (Full Paper) (link to paper)

  2006. (Menu for Muhlenthaler) All papers - Full papers - Abstracts - Selected papers

    Muklason

  2007. Muklason, A (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)

  2008. (Menu for Muklason) All papers - Full papers - Abstracts - Selected papers

    Mulder

  2009. Mulder, J (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
  2010. Mulder, J (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  2011. Mulder, J (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  2012. (Menu for Mulder) All papers - Full papers - Abstracts - Selected papers

    Muller

  2013. Muller, T (2013) Real-life Examination Timetabling, 248--267 (Full Paper) (link to paper)

  2014. (Menu for Muller) All papers - Full papers - Abstracts - Selected papers

    Munier

  2015. Munier, A (2009) Preface, 563--564 (Selected Paper) (link to paper)

  2016. (Menu for Munier) All papers - Full papers - Abstracts - Selected papers

    Munier-Kordon

  2017. Munier-Kordon, A (2007) An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays, 377--385 (Full Paper) (link to paper)

  2018. (Menu for Munier-Kordon) All papers - Full papers - Abstracts - Selected papers

    Murray

  2019. Murray, K. (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
  2020. Murray, K (2007) Real-time Student Sectioning, 598--600 (Abstract) (link to paper)

  2021. (Menu for Murray) All papers - Full papers - Abstracts - Selected papers

    Musial

  2022. Musial, J (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
  2023. Musial, J. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  2024. (Menu for Musial) All papers - Full papers - Abstracts - Selected papers

    Musliu

  2025. Musliu, N (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  2026. (Menu for Musliu) All papers - Full papers - Abstracts - Selected papers

    Muttray

  2027. Muttray, U (2015) University Course Timetabling with Con?ict Minimization and Elective Courses, 412--428 (Full Paper) (link to paper)

  2028. (Menu for Muttray) All papers - Full papers - Abstracts - Selected papers

    Mönch

  2029. Mönch, L (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
  2030. Mönch, L. (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
  2031. Mönch, L (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
  2032. Mönch, L (2015) Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs, 817--820 (Abstract) (link to paper)
  2033. Mönch, L (2011) Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine, 185--194 (Full Paper) (link to paper)
  2034. Mönch, L (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)
  2035. Mönch, L (2011) A GRASP Approach for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 557--560 (Abstract) (link to paper)
  2036. Mönch, L (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  2037. (Menu for Mönch) All papers - Full papers - Abstracts - Selected papers

    Müller

  2038. Müller, T (2007) Real-time Student Sectioning, 598--600 (Abstract) (link to paper)
  2039. Müller, T. (2011) Rapid Development of University Course Timetables, 649--652 (Abstract) (link to paper)
  2040. Müller, T (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
  2041. Müller, M (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)

  2042. (Menu for Müller) All papers - Full papers - Abstracts - Selected papers

    Naderi

  2043. Naderi, B (2009) Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem, 834--836 (Abstract) (link to paper)

  2044. (Menu for Naderi) All papers - Full papers - Abstracts - Selected papers

    Nagarajan

  2045. Nagarajan, B (2005) Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability, 744--744 (Abstract) (link to paper)

  2046. (Menu for Nagarajan) All papers - Full papers - Abstracts - Selected papers

    Nakagawa

  2047. Nakagawa, K (2015) Scheduling competition in the airline industry and the issue of duplicate bookings, 55--62 (Full Paper) (link to paper)

  2048. (Menu for Nakagawa) All papers - Full papers - Abstracts - Selected papers

    Nakamura

  2049. Nakamura, S (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)

  2050. (Menu for Nakamura) All papers - Full papers - Abstracts - Selected papers

    Nakase

  2051. Nakase, R (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)

  2052. (Menu for Nakase) All papers - Full papers - Abstracts - Selected papers

    Nakayama

  2053. Nakayama, K (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)

  2054. (Menu for Nakayama) All papers - Full papers - Abstracts - Selected papers

    Narin

  2055. Narin, O (2009) Solving Berth Allocation Problem with Column Generation, 744--747 (Abstract) (link to paper)

  2056. (Menu for Narin) All papers - Full papers - Abstracts - Selected papers

    Naudet

  2057. Naudet, Y. (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  2058. (Menu for Naudet) All papers - Full papers - Abstracts - Selected papers

    Naudin

  2059. Naudin, E (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  2060. (Menu for Naudin) All papers - Full papers - Abstracts - Selected papers

    Nazri

  2061. Nazri, M.Z. A. (2013) An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems, 641--645 (Abstract) (link to paper)

  2062. (Menu for Nazri) All papers - Full papers - Abstracts - Selected papers

    Neron

  2063. Neron, E (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)

  2064. (Menu for Neron) All papers - Full papers - Abstracts - Selected papers

    Neufeld

  2065. Neufeld, J.Sebastia (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)

  2066. (Menu for Neufeld) All papers - Full papers - Abstracts - Selected papers

    Newall

  2067. Newall, J (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)

  2068. (Menu for Newall) All papers - Full papers - Abstracts - Selected papers

    Ng

  2069. Ng, K. M. (2011) A water-flow algorithm for flexible flow shop scheduling with intermediate buffers, 483--500 (Selected Paper) (link to paper)
  2070. Ng, T. S. A (2011) Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning, 394--407 (Full Paper) (link to paper)
  2071. Ng, D. S.T (2005) How to maximize rewards in an incentived made-to-order scheduling environment:, 69--69 (Abstract) (link to paper)
  2072. Ng, T. S (2014) A resilience optimization approach for workforce-inventory control dynamics under uncertainty, 427--444 (Selected Paper) (link to paper)

  2073. (Menu for Ng) All papers - Full papers - Abstracts - Selected papers

    Ngueveu

  2074. Ngueveu, S. U. (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
  2075. Ngueveu, S. U (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  2076. (Menu for Ngueveu) All papers - Full papers - Abstracts - Selected papers

    Nickel

  2077. Nickel, S (2003) Scheduling In Software Development Using MultiObjective Evolutionary Algorithms, 438--465 (Full Paper) (link to paper)
  2078. Nickel, S (2005) Scheduling in Software Development Using Multiobjective Evolutionary Algorithms, 57--81 (Selected Paper) (link to paper)

  2079. (Menu for Nickel) All papers - Full papers - Abstracts - Selected papers

    Nieuwelaar

  2080. Nieuwelaar, B. v. (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)

  2081. (Menu for Nieuwelaar) All papers - Full papers - Abstracts - Selected papers

    Nikolakopoulos

  2082. Nikolakopoulos, A (2005) A TSP Formulation Of The DNA Sequencing Problem, 8--10 (Abstract) (link to paper)

  2083. (Menu for Nikolakopoulos) All papers - Full papers - Abstracts - Selected papers

    Nishi

  2084. Nishi, T (2009) Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems, 655--659 (Full Paper) (link to paper)

  2085. (Menu for Nishi) All papers - Full papers - Abstracts - Selected papers

    Nobibon

  2086. Nobibon, F. T. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
  2087. Nobibon, F.T (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
  2088. Nobibon, F. T. (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  2089. Nobibon, F. T (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
  2090. Nobibon, F. T (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
  2091. Nobibon, F.T (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)

  2092. (Menu for Nobibon) All papers - Full papers - Abstracts - Selected papers

    Nocella

  2093. Nocella, S (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  2094. (Menu for Nocella) All papers - Full papers - Abstracts - Selected papers

    Noronha

  2095. Noronha, T.F (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  2096. (Menu for Noronha) All papers - Full papers - Abstracts - Selected papers

    Nourmohmmadzadeh

  2097. Nourmohmmadzadeh, A (2015) An Efficient Simulated Annealing for the Integrated Problem of Berth Allocation and Quay Crane Assignment in Seaside Container Terminals, 154--164 (Full Paper) (link to paper)

  2098. (Menu for Nourmohmmadzadeh) All papers - Full papers - Abstracts - Selected papers

    Novais

  2099. Novais, A. Q (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)
  2100. Novais, A. Q (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)

  2101. (Menu for Novais) All papers - Full papers - Abstracts - Selected papers

    Novak

  2102. Novak, A (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)

  2103. (Menu for Novak) All papers - Full papers - Abstracts - Selected papers

    Nowe

  2104. Nowe, A (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)
  2105. Nowe, A (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)
  2106. Nowe, A (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)

  2107. (Menu for Nowe) All papers - Full papers - Abstracts - Selected papers

    Noyan

  2108. Noyan, N (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  2109. (Menu for Noyan) All papers - Full papers - Abstracts - Selected papers

    Nurmi

  2110. Nurmi, K (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
  2111. Nurmi, K (2007) A Framework for School Timetabling Problem, 386--393 (Full Paper) (link to paper)

  2112. (Menu for Nurmi) All papers - Full papers - Abstracts - Selected papers

    Obeid

  2113. Obeid, A (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)

  2114. (Menu for Obeid) All papers - Full papers - Abstracts - Selected papers

    Ochoa

  2115. Ochoa, G (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  2116. (Menu for Ochoa) All papers - Full papers - Abstracts - Selected papers

    Oddi

  2117. Oddi, A (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
  2118. Oddi, A (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)

  2119. (Menu for Oddi) All papers - Full papers - Abstracts - Selected papers

    Oguz

  2120. Oguz, C (2003) A Lagrangian Relaxation Method for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks to Minimize Total Weighted Completion Time, 638--655 (Full Paper) (link to paper)
  2121. Oguz, C (2005) A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates, 162--168 (Full Paper) (link to paper)
  2122. Oguz, C (2013) Scheduling chains with constant time lags and variable release times on asingle machine, 584--586 (Abstract) (link to paper)
  2123. Oguz, C (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)
  2124. Oguz, C (2009) Solving Berth Allocation Problem with Column Generation, 744--747 (Abstract) (link to paper)
  2125. Oguz, C (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  2126. Oguz, C (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)

  2127. (Menu for Oguz) All papers - Full papers - Abstracts - Selected papers

    Olstad

  2128. Olstad, A (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  2129. (Menu for Olstad) All papers - Full papers - Abstracts - Selected papers

    Ormsbee

  2130. Ormsbee, L (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)

  2131. (Menu for Ormsbee) All papers - Full papers - Abstracts - Selected papers

    Osman

  2132. Osman, I. H (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  2133. (Menu for Osman) All papers - Full papers - Abstracts - Selected papers

    Ostberg

  2134. Ostberg, P-O. (2015) Heuristics and Algorithms for Data Center Optimization, 921--927 (Abstract) (link to paper)

  2135. (Menu for Ostberg) All papers - Full papers - Abstracts - Selected papers

    Ostler

  2136. Ostler, J (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)

  2137. (Menu for Ostler) All papers - Full papers - Abstracts - Selected papers

    Ouelhadj

  2138. Ouelhadj, D (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)
  2139. Ouelhadj, D (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)

  2140. (Menu for Ouelhadj) All papers - Full papers - Abstracts - Selected papers

    Ourari

  2141. Ourari, S (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)

  2142. (Menu for Ourari) All papers - Full papers - Abstracts - Selected papers

    Owusu

  2143. Owusu, G (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  2144. (Menu for Owusu) All papers - Full papers - Abstracts - Selected papers

    Ozcan

  2145. Ozcan, E (2013) A Grouping Hyper-heuristic for Graph Colouring, 770--773 (Abstract) (link to paper)
  2146. Ozcan, E (2005) Towards and XML based standard for Timetabling Problems:TTML, 163--185 (Selected Paper) (link to paper)
  2147. Ozcan, E (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
  2148. Ozcan, B. M. E (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
  2149. Ozcan, E (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)

  2150. (Menu for Ozcan) All papers - Full papers - Abstracts - Selected papers

    Ozdamar

  2151. Ozdamar, L (2013) A GIS-Based Emergency Response System for Disaster Relief Operations, 372--378 (Full Paper) (link to paper)

  2152. (Menu for Ozdamar) All papers - Full papers - Abstracts - Selected papers

    Ozsoydan

  2153. Ozsoydan, F.B (2015) A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company, 656--658 (Abstract) (link to paper)

  2154. (Menu for Ozsoydan) All papers - Full papers - Abstracts - Selected papers

    O’Brien

  2155. O’Brien, R (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  2156. (Menu for O’Brien) All papers - Full papers - Abstracts - Selected papers

    Pabst

  2157. Pabst, D (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)

  2158. (Menu for Pabst) All papers - Full papers - Abstracts - Selected papers

    Paelinck

  2159. Paelinck, M. C. E (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  2160. Paelinck, M (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
  2161. Paelinck, M.C.E (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  2162. (Menu for Paelinck) All papers - Full papers - Abstracts - Selected papers

    Pais

  2163. Pais, T. C (2011) Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem, 335--351 (Full Paper) (link to paper)

  2164. (Menu for Pais) All papers - Full papers - Abstracts - Selected papers

    Pan

  2165. Pan, C (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)

  2166. (Menu for Pan) All papers - Full papers - Abstracts - Selected papers

    Papa

  2167. Papa, G (2009) Metaheuristic Approach to Loading Schedule Problem, 616--627 (Full Paper) (link to paper)

  2168. (Menu for Papa) All papers - Full papers - Abstracts - Selected papers

    Pape

  2169. Pape, C. L (2005) Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints, 193--195 (Abstract) (link to paper)

  2170. (Menu for Pape) All papers - Full papers - Abstracts - Selected papers

    Pappis

  2171. Pappis, C. P (2007) Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires, 402--409 (Full Paper) (link to paper)
  2172. Pappis, C. P (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)

  2173. (Menu for Pappis) All papers - Full papers - Abstracts - Selected papers

    Park

  2174. Park, K (2011) Scheduling Wafer Release in Clustered Photolithography Tools, 639--641 (Abstract) (link to paper)
  2175. Park, S (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)

  2176. (Menu for Park) All papers - Full papers - Abstracts - Selected papers

    Parker

  2177. Parker, M.E (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  2178. (Menu for Parker) All papers - Full papers - Abstracts - Selected papers

    Parkes

  2179. Parkes, A.J (2013) Heuristic Pruning Methods For The Robust Shortest Path Problem, 767--769 (Abstract) (link to paper)
  2180. Parkes, A. J (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
  2181. Parkes, A. J (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
  2182. Parkes, A. J (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  2183. Parkes, A. J (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
  2184. Parkes, A. J (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
  2185. Parkes, A. J (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)

  2186. (Menu for Parkes) All papers - Full papers - Abstracts - Selected papers

    Paschos

  2187. Paschos, V. Th (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)

  2188. (Menu for Paschos) All papers - Full papers - Abstracts - Selected papers

    Pascual

  2189. Pascual, F (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)
  2190. Pascual, F (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)

  2191. (Menu for Pascual) All papers - Full papers - Abstracts - Selected papers

    Patriksson

  2192. Patriksson, M (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  2193. (Menu for Patriksson) All papers - Full papers - Abstracts - Selected papers

    Patrinos

  2194. Patrinos, P (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)

  2195. (Menu for Patrinos) All papers - Full papers - Abstracts - Selected papers

    Pattacini

  2196. Pattacini, M (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  2197. (Menu for Pattacini) All papers - Full papers - Abstracts - Selected papers

    Paulus

  2198. Paulus, J. Ja (2007) Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive, 605--607 (Abstract) (link to paper)
  2199. Paulus, J. J (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)

  2200. (Menu for Paulus) All papers - Full papers - Abstracts - Selected papers

    Pawlak

  2201. Pawlak, G (2009) Single machine re-entrant jobs scheduling in the car factory paint shop, 775--777 (Abstract) (link to paper)

  2202. (Menu for Pawlak) All papers - Full papers - Abstracts - Selected papers

    Pazienza

  2203. Pazienza, G. E (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  2204. (Menu for Pazienza) All papers - Full papers - Abstracts - Selected papers

    Pecero

  2205. Pecero, J. E (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
  2206. Pecero, J. E (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
  2207. Pecero, J. E (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)

  2208. (Menu for Pecero) All papers - Full papers - Abstracts - Selected papers

    Pereira

  2209. Pereira, J (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
  2210. Pereira, C. S. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)
  2211. Pereira, C.S (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)

  2212. (Menu for Pereira) All papers - Full papers - Abstracts - Selected papers

    Perez-Gonzalez

  2213. Perez-Gonzalez, P (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
  2214. Perez-Gonzalez, P (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
  2215. Perez-Gonzalez, P (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)

  2216. (Menu for Perez-Gonzalez) All papers - Full papers - Abstracts - Selected papers

    Peridy

  2217. Peridy, L (2005) An O (N log N) Stable Algorithm for Immediate Selections Adjustments, 205--222 (Selected Paper) (link to paper)

  2218. (Menu for Peridy) All papers - Full papers - Abstracts - Selected papers

    Perira

  2219. Perira, J (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)

  2220. (Menu for Perira) All papers - Full papers - Abstracts - Selected papers

    Pernet

  2221. Pernet, N (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)

  2222. (Menu for Pernet) All papers - Full papers - Abstracts - Selected papers

    Pesch

  2223. Pesch, E (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
  2224. Pesch, E (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)

  2225. (Menu for Pesch) All papers - Full papers - Abstracts - Selected papers

    Pessan

  2226. Pessan, C (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)

  2227. (Menu for Pessan) All papers - Full papers - Abstracts - Selected papers

    Petrovic

  2228. Petrovic, S (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
  2229. Petrovic, S (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  2230. Petrovic, S (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
  2231. Petrovic, S (2013) An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems, 691--693 (Abstract) (link to paper)
  2232. Petrovic, S. (2016) A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling, 479--492 (Selected Paper) (link to paper)
  2233. Petrovic, D (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
  2234. Petrovic, S (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)
  2235. Petrovic, D (2005) An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions, 74--91 (Full Paper) (link to paper)
  2236. Petrovic, D (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
  2237. Petrovic, D (2008) An approach to predictive-reactive scheduling of parallel machines subject to disruptions, 65--82 (Selected Paper) (link to paper)
  2238. Petrovic, D (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  2239. Petrovic, S (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  2240. Petrovic, S (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)
  2241. Petrovic, S (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)

  2242. (Menu for Petrovic) All papers - Full papers - Abstracts - Selected papers

    Pfund

  2243. Pfund, M. E (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)
  2244. Pfund, M (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
  2245. Pfund, M. E (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
  2246. Pfund, M (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
  2247. Pfund, M (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)

  2248. (Menu for Pfund) All papers - Full papers - Abstracts - Selected papers

    Pham

  2249. Pham, S (2015) The Intermittent Traveling Salesman Problem, 794--796 (Abstract) (link to paper)

  2250. (Menu for Pham) All papers - Full papers - Abstracts - Selected papers

    Pickavet

  2251. Pickavet, M (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  2252. (Menu for Pickavet) All papers - Full papers - Abstracts - Selected papers

    Pillay

  2253. Pillay, N (2011) A Hyper-Heuristic Approach to Solving School Timetabling Problems, 628--632 (Abstract) (link to paper)
  2254. Pillay, N (2015) Automated Design of the Developmental Approach for Solving the Examination Timetabling Problem, 909--913 (Abstract) (link to paper)
  2255. Pillay, N (2009) Evolving Hyper-Heuristics for the Uncapacitated Examination Timetabling Problem, 447--457 (Full Paper) (link to paper)

  2256. (Menu for Pillay) All papers - Full papers - Abstracts - Selected papers

    Pimenta

  2257. Pimenta, V (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)

  2258. (Menu for Pimenta) All papers - Full papers - Abstracts - Selected papers

    Pineda

  2259. Pineda, A. A. S. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  2260. (Menu for Pineda) All papers - Full papers - Abstracts - Selected papers

    Pinedo

  2261. Pinedo, M (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
  2262. Pinedo, M (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
  2263. Pinedo, M (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
  2264. Pinedo, M (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
  2265. Pinedo, M (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)
  2266. Pinedo, M (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
  2267. Pinedo, M (2008) Preface, 1--3 (Selected Paper) (link to paper)

  2268. (Menu for Pinedo) All papers - Full papers - Abstracts - Selected papers

    Piplani

  2269. Piplani, R (2005) Combined Production and Distribution Scheduling of Ready-Mix Concrete, 551--551 (Abstract) (link to paper)

  2270. (Menu for Piplani) All papers - Full papers - Abstracts - Selected papers

    Pira

  2271. Pira, C (2013) Line search method for solving a non-preemptive strictly periodic scheduling problem, 356--371 (Full Paper) (link to paper)
  2272. Pira, C. (2016) Line search method for solving a non-preemptive strictly periodic scheduling problem, 227--243 (Selected Paper) (link to paper)

  2273. (Menu for Pira) All papers - Full papers - Abstracts - Selected papers

    Pochet

  2274. Pochet, Y (2007) A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant, 621--624 (Abstract) (link to paper)

  2275. (Menu for Pochet) All papers - Full papers - Abstracts - Selected papers

    Policella

  2276. Policella, N (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
  2277. Policella, N (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)

  2278. (Menu for Policella) All papers - Full papers - Abstracts - Selected papers

    Politz

  2279. Politz, A (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)
  2280. Politz, A (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)

  2281. (Menu for Politz) All papers - Full papers - Abstracts - Selected papers

    Portmann

  2282. Portmann, M-C. (2007) A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains, 410--417 (Full Paper) (link to paper)
  2283. Portmann, M-C. (2005) An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 223--246 (Selected Paper) (link to paper)
  2284. Portmann, M- (2003) An Efficient Proactive Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 337--362 (Full Paper) (link to paper)

  2285. (Menu for Portmann) All papers - Full papers - Abstracts - Selected papers

    Post

  2286. Post, G (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)

  2287. (Menu for Post) All papers - Full papers - Abstracts - Selected papers

    Potts

  2288. Potts, C. N (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)
  2289. Potts, C.N (2003) The Coordination of Scheduling and Batch Deliveries, 656--659 (Abstract) (link to paper)

  2290. (Menu for Potts) All papers - Full papers - Abstracts - Selected papers

    Potvin

  2291. Potvin, J-Y. (2009) An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks, 831--833 (Abstract) (link to paper)

  2292. (Menu for Potvin) All papers - Full papers - Abstracts - Selected papers

    Prajapat

  2293. Prajapat, N (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  2294. (Menu for Prajapat) All papers - Full papers - Abstracts - Selected papers

    Premysl

  2295. Premysl, S (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)

  2296. (Menu for Premysl) All papers - Full papers - Abstracts - Selected papers

    Proll

  2297. Proll, L (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
  2298. Proll, L (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
  2299. Proll, L (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)

  2300. (Menu for Proll) All papers - Full papers - Abstracts - Selected papers

    Prot

  2301. Prot, D (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)

  2302. (Menu for Prot) All papers - Full papers - Abstracts - Selected papers

    Pundoor

  2303. Pundoor, G (2005) Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost, 549--550 (Abstract) (link to paper)

  2304. (Menu for Pundoor) All papers - Full papers - Abstracts - Selected papers

    Péridy

  2305. Péridy, L (2003) Improving Immediate Selections Adjustments, 244--258 (Full Paper) (link to paper)

  2306. (Menu for Péridy) All papers - Full papers - Abstracts - Selected papers

    Qu

  2307. Qu, R (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
  2308. Qu, R (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  2309. Qu, R (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
  2310. Qu, R (2007) Adaptive Decomposition and Construction for Examination Timetabling Problems, 418--425 (Full Paper) (link to paper)
  2311. Qu, R (2009) A GRASP approach for the delay-constrained multicast routing problem, 93--104 (Full Paper) (link to paper)
  2312. Qu, R (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)

  2313. (Menu for Qu) All papers - Full papers - Abstracts - Selected papers

    Quadrifoglio

  2314. Quadrifoglio, L (2011) An insertion heuristic for coordinated zoning paratransit systems, 502--505 (Abstract) (link to paper)

  2315. (Menu for Quadrifoglio) All papers - Full papers - Abstracts - Selected papers

    Quesnelle

  2316. Quesnelle, J (2015) Scheduling a conference to minimize attendee preference Conflicts, 379--392 (Full Paper) (link to paper)

  2317. (Menu for Quesnelle) All papers - Full papers - Abstracts - Selected papers

    Quilliot

  2318. Quilliot, A (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
  2319. Quilliot, A (2013) Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed, 185--205 (Full Paper) (link to paper)
  2320. Quilliot, A (2003) Interval Graphs, Antichain Sets and Scheduling with Temporal and Resource Constraints, 620--637 (Full Paper) (link to paper)
  2321. Quilliot, A (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)
  2322. Quilliot, A (2013) Homogeneously non-idling schedules of unit-time jobs on identical parallel machines, 39--54 (Full Paper) (link to paper)
  2323. Quilliot, A (2013) RCPSP with Resource Transfers and Money Management, 91--110 (Full Paper) (link to paper)

  2324. (Menu for Quilliot) All papers - Full papers - Abstracts - Selected papers

    R

  2325. R, J. G. H. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)

  2326. (Menu for R) All papers - Full papers - Abstracts - Selected papers

    Raa

  2327. Raa, B (2007) Aligning Frequencies in Cyclic Delivery Scheduling, 426--430 (Full Paper) (link to paper)

  2328. (Menu for Raa) All papers - Full papers - Abstracts - Selected papers

    Rabadi

  2329. Rabadi, G (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)

  2330. (Menu for Rabadi) All papers - Full papers - Abstracts - Selected papers

    Rachaniotis

  2331. Rachaniotis, N. P (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)
  2332. Rachaniotis, N. P (2007) Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires, 402--409 (Full Paper) (link to paper)

  2333. (Menu for Rachaniotis) All papers - Full papers - Abstracts - Selected papers

    Rahimian

  2334. Rahimian, E (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)

  2335. (Menu for Rahimian) All papers - Full papers - Abstracts - Selected papers

    Rahman

  2336. Rahman, S. A (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)

  2337. (Menu for Rahman) All papers - Full papers - Abstracts - Selected papers

    Rainwater

  2338. Rainwater, C. E (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)

  2339. (Menu for Rainwater) All papers - Full papers - Abstracts - Selected papers

    Ramacher

  2340. Ramacher, R (2011) Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine, 185--194 (Full Paper) (link to paper)

  2341. (Menu for Ramacher) All papers - Full papers - Abstracts - Selected papers

    Ramos

  2342. Ramos, C (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
  2343. Ramos, C (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)

  2344. (Menu for Ramos) All papers - Full papers - Abstracts - Selected papers

    Rana

  2345. Rana, D (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  2346. (Menu for Rana) All papers - Full papers - Abstracts - Selected papers

    Ranade

  2347. Ranade, A (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)

  2348. (Menu for Ranade) All papers - Full papers - Abstracts - Selected papers

    Ranson

  2349. Ranson, D (2005) Graphical Tools for Heuristic Visualization, 658--667 (Full Paper) (link to paper)

  2350. (Menu for Ranson) All papers - Full papers - Abstracts - Selected papers

    Rapine

  2351. Rapine, C (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)
  2352. Rapine, C (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
  2353. Rapine, C (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)

  2354. (Menu for Rapine) All papers - Full papers - Abstracts - Selected papers

    Rashidi

  2355. Rashidi, H (2005) Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling, 677--692 (Full Paper) (link to paper)

  2356. (Menu for Rashidi) All papers - Full papers - Abstracts - Selected papers

    Ravetti

  2357. Ravetti, M. G. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)

  2358. (Menu for Ravetti) All papers - Full papers - Abstracts - Selected papers

    Ravizza

  2359. Ravizza, S (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)

  2360. (Menu for Ravizza) All papers - Full papers - Abstracts - Selected papers

    Rebaine

  2361. Rebaine, D (2007) An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays, 377--385 (Full Paper) (link to paper)

  2362. (Menu for Rebaine) All papers - Full papers - Abstracts - Selected papers

    Redrup

  2363. Redrup, D (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  2364. (Menu for Redrup) All papers - Full papers - Abstracts - Selected papers

    Reeves

  2365. Reeves, C (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
  2366. Reeves, C. (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  2367. Reeves, C (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  2368. Reeves, C.R (2003) Multi-objective Scheduling: Threat or Opportunity?, 466--467 (Abstract) (link to paper)

  2369. (Menu for Reeves) All papers - Full papers - Abstracts - Selected papers

    Resende

  2370. Resende, M.G.C (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  2371. (Menu for Resende) All papers - Full papers - Abstracts - Selected papers

    Riane

  2372. Riane, F (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)

  2373. (Menu for Riane) All papers - Full papers - Abstracts - Selected papers

    Ribeiro

  2374. Ribeiro, C. C (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)
  2375. Ribeiro, C. C (2009) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 115--129 (Full Paper) (link to paper)
  2376. Ribeiro, C. C (2011) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 655--667 (Selected Paper) (link to paper)
  2377. Ribeiro, C. C (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)
  2378. Ribeiro, C. C (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  2379. (Menu for Ribeiro) All papers - Full papers - Abstracts - Selected papers

    Righter

  2380. Righter, R (2007) Scheduling in Highly Uncertain Environments, 27--32 (Full Paper) (link to paper)

  2381. (Menu for Righter) All papers - Full papers - Abstracts - Selected papers

    Rihm

  2382. Rihm, T (2015) A lexicographic goal programming approach for staff assignment with acceptance levels, 526--540 (Full Paper) (link to paper)

  2383. (Menu for Rihm) All papers - Full papers - Abstracts - Selected papers

    Riise

  2384. Riise, A (2011) Operational Surgery scheduling problems: Modelling and solving, 592--595 (Abstract) (link to paper)
  2385. Riise, A (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)

  2386. (Menu for Riise) All papers - Full papers - Abstracts - Selected papers

    Rinaldi

  2387. Rinaldi, F (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)

  2388. (Menu for Rinaldi) All papers - Full papers - Abstracts - Selected papers

    Rivizza

  2389. Rivizza, S (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)

  2390. (Menu for Rivizza) All papers - Full papers - Abstracts - Selected papers

    Rivreau

  2391. Rivreau, D (2003) Improving Immediate Selections Adjustments, 244--258 (Full Paper) (link to paper)
  2392. Rivreau, D (2005) An O (N log N) Stable Algorithm for Immediate Selections Adjustments, 205--222 (Selected Paper) (link to paper)

  2393. (Menu for Rivreau) All papers - Full papers - Abstracts - Selected papers

    Rizzo

  2394. Rizzo, L. M (2011) A GRASP Heuristic to the Extended Car Sequencing Problem, 366--373 (Full Paper) (link to paper)

  2395. (Menu for Rizzo) All papers - Full papers - Abstracts - Selected papers

    Roberts

  2396. Roberts, M (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)

  2397. (Menu for Roberts) All papers - Full papers - Abstracts - Selected papers

    Rodr?guez

  2398. Rodr?guez, V (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  2399. (Menu for Rodr?guez) All papers - Full papers - Abstracts - Selected papers

    Rodrigues

  2400. Rodrigues, L. U (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)

  2401. (Menu for Rodrigues) All papers - Full papers - Abstracts - Selected papers

    Rodriguez

  2402. Rodriguez, J. A. V. (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)

  2403. (Menu for Rodriguez) All papers - Full papers - Abstracts - Selected papers

    Rodriguez-Velásquez

  2404. Rodriguez-Velásquez, E (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)

  2405. (Menu for Rodriguez-Velásquez) All papers - Full papers - Abstracts - Selected papers

    Rogerie

  2406. Rogerie, J (2013) Temporal Linear Relaxation in IBM ILOG CP Optimizer, 379--391 (Full Paper) (link to paper)
  2407. Rogerie, J. (2016) Temporal linear relaxation in IBM ILOG CP Optimizer, 391--400 (Selected Paper) (link to paper)

  2408. (Menu for Rogerie) All papers - Full papers - Abstracts - Selected papers

    Roman

  2409. Roman, V (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)

  2410. (Menu for Roman) All papers - Full papers - Abstracts - Selected papers

    Romano

  2411. Romano, C. A. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)

  2412. (Menu for Romano) All papers - Full papers - Abstracts - Selected papers

    Romeijnders

  2413. Romeijnders, W (2011) Off-shore Helicopter Routing with Asymmetric Demands and Refueling Options, 637--638 (Abstract) (link to paper)

  2414. (Menu for Romeijnders) All papers - Full papers - Abstracts - Selected papers

    Romero

  2415. Romero, D (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)

  2416. (Menu for Romero) All papers - Full papers - Abstracts - Selected papers

    Rose

  2417. Rose, O (2011) A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing, 459--468 (Full Paper) (link to paper)
  2418. Rose, O (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  2419. Rose, O (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  2420. (Menu for Rose) All papers - Full papers - Abstracts - Selected papers

    Rossi

  2421. Rossi, F (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  2422. (Menu for Rossi) All papers - Full papers - Abstracts - Selected papers

    Roussel

  2423. Roussel, R. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)

  2424. (Menu for Roussel) All papers - Full papers - Abstracts - Selected papers

    Rucinski

  2425. Rucinski, M (2009) Single machine re-entrant jobs scheduling in the car factory paint shop, 775--777 (Abstract) (link to paper)

  2426. (Menu for Rucinski) All papers - Full papers - Abstracts - Selected papers

    Rudec

  2427. Rudec, T (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)

  2428. (Menu for Rudec) All papers - Full papers - Abstracts - Selected papers

    Rudek

  2429. Rudek, R (2015) A novel Approximate/Exact objective based search technique for precedence constrained scheduling problems, 484--491 (Full Paper) (link to paper)

  2430. (Menu for Rudek) All papers - Full papers - Abstracts - Selected papers

    Rudova

  2431. Rudova, H (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)

  2432. (Menu for Rudova) All papers - Full papers - Abstracts - Selected papers

    Rudová

  2433. Rudová, H (2005) Multi-Criteria Soft Constraints in Timetabling, 11--15 (Abstract) (link to paper)
  2434. Rudová, H (2011) Rapid Development of University Course Timetables, 649--652 (Abstract) (link to paper)
  2435. Rudová, H. (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
  2436. Rudová, H (2013) Student Scheduling for Bachelor State Examinations, 762--766 (Abstract) (link to paper)

  2437. (Menu for Rudová) All papers - Full papers - Abstracts - Selected papers

    Ruiz

  2438. Ruiz, R (2009) Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem, 834--836 (Abstract) (link to paper)
  2439. Ruiz, R (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)
  2440. Ruiz, R (2007) Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times, 439--446 (Full Paper) (link to paper)

  2441. (Menu for Ruiz) All papers - Full papers - Abstracts - Selected papers

    Runarsson

  2442. Runarsson, T.P (2013) Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling, 318--330 (Full Paper) (link to paper)

  2443. (Menu for Runarsson) All papers - Full papers - Abstracts - Selected papers

    Rusdi

  2444. Rusdi, I (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  2445. Rusdi, I (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  2446. (Menu for Rusdi) All papers - Full papers - Abstracts - Selected papers

    Sabar

  2447. Sabar, N.R (2013) An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems, 641--645 (Abstract) (link to paper)
  2448. Sabar, N. R (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)
  2449. Sabar, N.R (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
  2450. Sabar, N. R (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)

  2451. (Menu for Sabar) All papers - Full papers - Abstracts - Selected papers

    Sadr

  2452. Sadr, J (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  2453. (Menu for Sadr) All papers - Full papers - Abstracts - Selected papers

    Sadykov

  2454. Sadykov, R (2007) Computing Lower Bounds for the Schedule of a Multifunction Radar, 523--530 (Full Paper) (link to paper)
  2455. Sadykov, R (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
  2456. Sadykov, R (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)

  2457. (Menu for Sadykov) All papers - Full papers - Abstracts - Selected papers

    Saffar

  2458. Saffar, M (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  2459. (Menu for Saffar) All papers - Full papers - Abstracts - Selected papers

    Sagir

  2460. Sagir, M (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)

  2461. (Menu for Sagir) All papers - Full papers - Abstracts - Selected papers

    Sahli

  2462. Sahli, A (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)

  2463. (Menu for Sahli) All papers - Full papers - Abstracts - Selected papers

    Sakellariou

  2464. Sakellariou, R (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)

  2465. (Menu for Sakellariou) All papers - Full papers - Abstracts - Selected papers

    Salassa

  2466. Salassa, F (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)

  2467. (Menu for Salassa) All papers - Full papers - Abstracts - Selected papers

    Salehipour

  2468. Salehipour, A (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)

  2469. (Menu for Salehipour) All papers - Full papers - Abstracts - Selected papers

    Salhi

  2470. Salhi, A (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)

  2471. (Menu for Salhi) All papers - Full papers - Abstracts - Selected papers

    Salido

  2472. Salido, M.A (2003) A Constraint Ordering Heuristic for Scheduling Problems, 476--491 (Full Paper) (link to paper)

  2473. (Menu for Salido) All papers - Full papers - Abstracts - Selected papers

    Salman

  2474. Salman, S (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)

  2475. (Menu for Salman) All papers - Full papers - Abstracts - Selected papers

    Sanchez

  2476. Sanchez, A. G. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  2477. (Menu for Sanchez) All papers - Full papers - Abstracts - Selected papers

    Sanchidrian

  2478. Sanchidrian, T. B. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  2479. (Menu for Sanchidrian) All papers - Full papers - Abstracts - Selected papers

    Saner

  2480. Saner, N (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)

  2481. (Menu for Saner) All papers - Full papers - Abstracts - Selected papers

    Sankaran

  2482. Sankaran, V (2011) Adapting Particle Swarm Optimization for the Flexible Flow Line, 653--656 (Abstract) (link to paper)

  2483. (Menu for Sankaran) All papers - Full papers - Abstracts - Selected papers

    Sannomiya

  2484. Sannomiya, N (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)

  2485. (Menu for Sannomiya) All papers - Full papers - Abstracts - Selected papers

    Santos

  2486. Santos, H. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
  2487. Santos, H.G (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
  2488. Santos, H. G (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
  2489. Santos, C. A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
  2490. Santos, H. G (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)
  2491. Santos, H.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
  2492. Santos, H. G (2013) A New Integer Linear Programming Formulation to the Examination Timetabling Problem, 345--355 (Full Paper) (link to paper)
  2493. Santos, H. G (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
  2494. Santos, H. G (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)

  2495. (Menu for Santos) All papers - Full papers - Abstracts - Selected papers

    Saridarq

  2496. Saridarq, F. D. (2013) The Balanced Path Problem in Crew Scheduling Applications, 729--732 (Abstract) (link to paper)

  2497. (Menu for Saridarq) All papers - Full papers - Abstracts - Selected papers

    Sarimveis

  2498. Sarimveis, H (2008) Optimal production scheduling for the dairy industry, 315--331 (Selected Paper) (link to paper)
  2499. Sarimveis, H (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)
  2500. Sarimveis, H (2005) A TSP Formulation Of The DNA Sequencing Problem, 8--10 (Abstract) (link to paper)

  2501. (Menu for Sarimveis) All papers - Full papers - Abstracts - Selected papers

    Sarin

  2502. Sarin, S. C (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)
  2503. Sarin, S. C (2005) Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability, 744--744 (Abstract) (link to paper)

  2504. (Menu for Sarin) All papers - Full papers - Abstracts - Selected papers

    Sato

  2505. Sato, S (2009) An exact algorithm for the precedence-constrained single-machine scheduling problem, 216--226 (Full Paper) (link to paper)

  2506. (Menu for Sato) All papers - Full papers - Abstracts - Selected papers

    Savourey

  2507. Savourey, D (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  2508. Savourey, D (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)

  2509. (Menu for Savourey) All papers - Full papers - Abstracts - Selected papers

    Schaerf

  2510. Schaerf, A (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
  2511. Schaerf, A (2009) Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs, 594--605 (Full Paper) (link to paper)
  2512. Schaerf, A (2013) The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays, 646--648 (Abstract) (link to paper)
  2513. Schaerf, A (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
  2514. Schaerf, A. (2016) Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays, 377--389 (Selected Paper) (link to paper)
  2515. Schaerf, A (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)

  2516. (Menu for Schaerf) All papers - Full papers - Abstracts - Selected papers

    Schafer

  2517. Schafer, A (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)

  2518. (Menu for Schafer) All papers - Full papers - Abstracts - Selected papers

    Schatteman

  2519. Schatteman, D (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)

  2520. (Menu for Schatteman) All papers - Full papers - Abstracts - Selected papers

    Schenk

  2521. Schenk, M (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)

  2522. (Menu for Schenk) All papers - Full papers - Abstracts - Selected papers

    Schieber

  2523. Schieber, B (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  2524. (Menu for Schieber) All papers - Full papers - Abstracts - Selected papers

    Schilde

  2525. Schilde, M (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)

  2526. (Menu for Schilde) All papers - Full papers - Abstracts - Selected papers

    Schmidt

  2527. Schmidt, M (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)

  2528. (Menu for Schmidt) All papers - Full papers - Abstracts - Selected papers

    Schmitz

  2529. Schmitz, H (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)
  2530. Schmitz, H (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)

  2531. (Menu for Schmitz) All papers - Full papers - Abstracts - Selected papers

    Schneeberger

  2532. Schneeberger, K (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)

  2533. (Menu for Schneeberger) All papers - Full papers - Abstracts - Selected papers

    Schnell

  2534. Schnell, A (2013) A hybrid local search algorithm integrating an exact CP-SAT approach to solve the multi-mode resource-constrained multi-project scheduling problem, 802--806 (Full Paper) (link to paper)

  2535. (Menu for Schnell) All papers - Full papers - Abstracts - Selected papers

    Scholz-Reiter

  2536. Scholz-Reiter, B. (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)
  2537. Scholz-Reiter, B (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)

  2538. (Menu for Scholz-Reiter) All papers - Full papers - Abstracts - Selected papers

    Schultmann

  2539. Schultmann, F (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)

  2540. (Menu for Schultmann) All papers - Full papers - Abstracts - Selected papers

    Schutten

  2541. Schutten, J. M. J (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)

  2542. (Menu for Schutten) All papers - Full papers - Abstracts - Selected papers

    Schwarzfischer

  2543. Schwarzfischer, T (2003) Using Value Dependencies to Schedule Complex Soft-Real-Time Applications with Precedence Constraints, 92--113 (Full Paper) (link to paper)

  2544. (Menu for Schwarzfischer) All papers - Full papers - Abstracts - Selected papers

    Schwiegelshohn

  2545. Schwiegelshohn, U (2007) Scheduling Tests on Vehicle Prototypes using Constraint Programming, 336--343 (Full Paper) (link to paper)
  2546. Schwiegelshohn, U (2011) A system-centric metric for the evaluation of online job schedules, 571--581 (Selected Paper) (link to paper)
  2547. Schwiegelshohn, U (2009) An Owner-centric Metric for the Evaluation of Online Job Schedules, 557--569 (Full Paper) (link to paper)

  2548. (Menu for Schwiegelshohn) All papers - Full papers - Abstracts - Selected papers

    Schwindt

  2549. Schwindt, C (2007) Large-Scale Short-Term Planning in Chemical Batch Production, 490--497 (Full Paper) (link to paper)
  2550. Schwindt, C (2009) A cyclic approach to large-scale short-term planning in chemical batch production, 595--606 (Selected Paper) (link to paper)

  2551. (Menu for Schwindt) All papers - Full papers - Abstracts - Selected papers

    Schäfer

  2552. Schäfer, T (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)

  2553. (Menu for Schäfer) All papers - Full papers - Abstracts - Selected papers

    Scott

  2554. Scott, S (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)

  2555. (Menu for Scott) All papers - Full papers - Abstracts - Selected papers

    Seddik

  2556. Seddik, Y (2015) Mixed-criticality scheduling with known probabilities, 867--870 (Abstract) (link to paper)
  2557. Seddik, Y (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)
  2558. Seddik, Y (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)

  2559. (Menu for Seddik) All papers - Full papers - Abstracts - Selected papers

    Serafini

  2560. Serafini, P (2009) On some combinatorial properties of PESP, 59--67 (Full Paper) (link to paper)
  2561. Serafini, P (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)
  2562. Serafini, P (2013) Scheduling teams for aircraft ground maintenance, 649--651 (Abstract) (link to paper)

  2563. (Menu for Serafini) All papers - Full papers - Abstracts - Selected papers

    Sgalambro

  2564. Sgalambro, A (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)

  2565. (Menu for Sgalambro) All papers - Full papers - Abstracts - Selected papers

    Shabtay

  2566. Shabtay, D (2005) The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times, 149--161 (Full Paper) (link to paper)
  2567. Shabtay, D (2015) Online and semi-online scheduling of two job types on a set of multipurpose machines, 626--628 (Abstract) (link to paper)
  2568. Shabtay, D (2009) Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment, 301--310 (Full Paper) (link to paper)
  2569. Shabtay, D (2008) The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times, 25--40 (Selected Paper) (link to paper)
  2570. Shabtay, D (2011) A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates, 455--469 (Selected Paper) (link to paper)
  2571. Shabtay, D (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)

  2572. (Menu for Shabtay) All papers - Full papers - Abstracts - Selected papers

    Shafransky

  2573. Shafransky, Y (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
  2574. Shafransky, Y. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)

  2575. (Menu for Shafransky) All papers - Full papers - Abstracts - Selected papers

    Shaker

  2576. Shaker, K (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)

  2577. (Menu for Shaker) All papers - Full papers - Abstracts - Selected papers

    Shang

  2578. Shang, L (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
  2579. Shang, L (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)

  2580. (Menu for Shang) All papers - Full papers - Abstracts - Selected papers

    Sharma

  2581. Sharma, N (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)

  2582. (Menu for Sharma) All papers - Full papers - Abstracts - Selected papers

    Shchepin

  2583. Shchepin, E (2005) New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling, 606--629 (Full Paper) (link to paper)
  2584. Shchepin, E. V (2008) On the geometry, preemptions and complexity of multiprocessor and shop scheduling, 183--213 (Selected Paper) (link to paper)

  2585. (Menu for Shchepin) All papers - Full papers - Abstracts - Selected papers

    Shen

  2586. Shen, L (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)
  2587. Shen, L (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)
  2588. Shen, L (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
  2589. Shen, L (2015) Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability, 746--749 (Abstract) (link to paper)
  2590. Shen, C-W. (2011) An insertion heuristic for coordinated zoning paratransit systems, 502--505 (Abstract) (link to paper)

  2591. (Menu for Shen) All papers - Full papers - Abstracts - Selected papers

    Shikata

  2592. Shikata, Y (2015) Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities, 596--600 (Abstract) (link to paper)

  2593. (Menu for Shikata) All papers - Full papers - Abstracts - Selected papers

    Shufan

  2594. Shufan, E (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
  2595. Shufan, E (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
  2596. Shufan, E (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)

  2597. (Menu for Shufan) All papers - Full papers - Abstracts - Selected papers

    Sierksma

  2598. Sierksma, G (2011) Off-shore Helicopter Routing with Asymmetric Demands and Refueling Options, 637--638 (Abstract) (link to paper)

  2599. (Menu for Sierksma) All papers - Full papers - Abstracts - Selected papers

    Silva

  2600. Silva, S. (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)
  2601. Silva, S. do C. (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)
  2602. Silva, E. C. (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)
  2603. Silva, C. L.T.F. (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
  2604. Silva, S. do C. (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
  2605. Silva, S. do C. (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)
  2606. Silva, J.D. L. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  2607. (Menu for Silva) All papers - Full papers - Abstracts - Selected papers

    Silva-Lugo

  2608. Silva-Lugo, R (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  2609. (Menu for Silva-Lugo) All papers - Full papers - Abstracts - Selected papers

    Simonetti

  2610. Simonetti, N (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)

  2611. (Menu for Simonetti) All papers - Full papers - Abstracts - Selected papers

    Simonin

  2612. Simonin, G (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)
  2613. Simonin, G (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)

  2614. (Menu for Simonin) All papers - Full papers - Abstracts - Selected papers

    Simpson

  2615. Simpson, A. R (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)
  2616. Simpson, A. R (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  2617. (Menu for Simpson) All papers - Full papers - Abstracts - Selected papers

    Singh

  2618. Singh, R (2015) Simulation Based Cause and Effect analysis of Input Variables in Wafer Fabrication, 345--359 (Full Paper) (link to paper)

  2619. (Menu for Singh) All papers - Full papers - Abstracts - Selected papers

    Sioud

  2620. Sioud, A (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)

  2621. (Menu for Sioud) All papers - Full papers - Abstracts - Selected papers

    Skalicky

  2622. Skalicky, T (2009) A local approach to automated correction of violated precedence and resource constraints in manually altered schedules, 507--517 (Full Paper) (link to paper)

  2623. (Menu for Skalicky) All papers - Full papers - Abstracts - Selected papers

    Sledneu

  2624. Sledneu, D (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
  2625. Sledneu, D. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)

  2626. (Menu for Sledneu) All papers - Full papers - Abstracts - Selected papers

    Sluis

  2627. Sluis, H.J. v. (2005) On The Complexity Of Adjacent Resource Scheduling, 653--654 (Abstract) (link to paper)
  2628. Sluis, H.J. v. (2005) Models For Adjacent Resource Scheduling, 16--17 (Abstract) (link to paper)

  2629. (Menu for Sluis) All papers - Full papers - Abstracts - Selected papers

    Smet

  2630. Smet, P (2015) Variable neighbourhood search for rich personnel rostering problems, 928--930 (Abstract) (link to paper)
  2631. Smet, P (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
  2632. Smet, P (2013) A heuristic approach to an integrated personnel rostering and task assignment problem, 664--666 (Abstract) (link to paper)
  2633. Smet, P. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  2634. (Menu for Smet) All papers - Full papers - Abstracts - Selected papers

    Smith

  2635. Smith, S. F (2003) Is Scheduling a Solved Problem?, 11--20 (Full Paper) (link to paper)
  2636. Smith, S. F (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
  2637. Smith, S. F (2005) Is Scheduling a Solved Problem?, 3--17 (Selected Paper) (link to paper)

  2638. (Menu for Smith) All papers - Full papers - Abstracts - Selected papers

    Smriglio

  2639. Smriglio, S (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  2640. (Menu for Smriglio) All papers - Full papers - Abstracts - Selected papers

    Soares

  2641. Soares, J.A (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
  2642. Soares, J.A (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
  2643. Soares, J. A (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)

  2644. (Menu for Soares) All papers - Full papers - Abstracts - Selected papers

    Soghier

  2645. Soghier, A (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)

  2646. (Menu for Soghier) All papers - Full papers - Abstracts - Selected papers

    Solis

  2647. Solis, Y. A. R. (2005) Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date, 169--184 (Full Paper) (link to paper)

  2648. (Menu for Solis) All papers - Full papers - Abstracts - Selected papers

    Sologub

  2649. Sologub, A. (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  2650. (Menu for Sologub) All papers - Full papers - Abstracts - Selected papers

    Sorel

  2651. Sorel, Y (2009) Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time, 843--851 (Abstract) (link to paper)
  2652. Sorel, Y (2005) Periodic real-time scheduling:from latency-based model to deadline-based model, 344--352 (Full Paper) (link to paper)
  2653. Sorel, Y (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)

  2654. (Menu for Sorel) All papers - Full papers - Abstracts - Selected papers

    Soriano

  2655. Soriano, P (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  2656. (Menu for Soriano) All papers - Full papers - Abstracts - Selected papers

    Soto

  2657. Soto, I (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
  2658. Soto, I (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  2659. (Menu for Soto) All papers - Full papers - Abstracts - Selected papers

    Soubeiga

  2660. Soubeiga, E (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
  2661. Soubeiga, E (2003) Scheduling Nurses Using a Tabu-Search Hyperheuristic, 197--219 (Full Paper) (link to paper)

  2662. (Menu for Soubeiga) All papers - Full papers - Abstracts - Selected papers

    Souhkal

  2663. Souhkal, A (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)

  2664. (Menu for Souhkal) All papers - Full papers - Abstracts - Selected papers

    Soukhal

  2665. Soukhal, A (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)
  2666. Soukhal, A (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)

  2667. (Menu for Soukhal) All papers - Full papers - Abstracts - Selected papers

    Soumis

  2668. Soumis, F (2015) An integrated simultaneous approach for pilots and copilots re-scheduling problem, 943--945 (Abstract) (link to paper)

  2669. (Menu for Soumis) All papers - Full papers - Abstracts - Selected papers

    Sourd

  2670. Sourd, F (2009) Preface, 563--564 (Selected Paper) (link to paper)
  2671. Sourd, F (2005) Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date, 169--184 (Full Paper) (link to paper)
  2672. Sourd, F (2007) Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs, 561--563 (Abstract) (link to paper)
  2673. Sourd, F (2005) The Single Machine Just-in-time Scheduling Problem With Preemptions, 140--148 (Full Paper) (link to paper)

  2674. (Menu for Sourd) All papers - Full papers - Abstracts - Selected papers

    Speranza

  2675. Speranza, M. G. (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)

  2676. (Menu for Speranza) All papers - Full papers - Abstracts - Selected papers

    Spieksma

  2677. Spieksma, F. C .R (2009) Soccer schedules in Europe: an overview, 715--717 (Abstract) (link to paper)
  2678. Spieksma, F. C. R (2013) Scheduling round robin tournaments for amateur sport leagues, 596--598 (Abstract) (link to paper)
  2679. Spieksma, F. C.R (2007) Interval Scheduling, 33--40 (Full Paper) (link to paper)
  2680. Spieksma, F.C.R (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)

  2681. (Menu for Spieksma) All papers - Full papers - Abstracts - Selected papers

    Sriskandarajah

  2682. Sriskandarajah, C (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)

  2683. (Menu for Sriskandarajah) All papers - Full papers - Abstracts - Selected papers

    Steffy

  2684. Steffy, D (2015) Scheduling a conference to minimize attendee preference Conflicts, 379--392 (Full Paper) (link to paper)

  2685. (Menu for Steffy) All papers - Full papers - Abstracts - Selected papers

    Steiner

  2686. Steiner, G (2005) The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times, 149--161 (Full Paper) (link to paper)
  2687. Steiner, G (2009) Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment, 301--310 (Full Paper) (link to paper)
  2688. Steiner, G (2007) Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains, 447--454 (Full Paper) (link to paper)
  2689. Steiner, G (2011) A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates, 455--469 (Selected Paper) (link to paper)
  2690. Steiner, G (2008) The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times, 25--40 (Selected Paper) (link to paper)
  2691. Steiner, G (2009) Strong-Weak Precedence in Scheduling: Extended Order Implications, 28--42 (Full Paper) (link to paper)
  2692. Steiner, G (2009) Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, 565--574 (Selected Paper) (link to paper)

  2693. (Menu for Steiner) All papers - Full papers - Abstracts - Selected papers

    Steinhöfel

  2694. Steinhöfel, K (2011) Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems, 297--307 (Full Paper) (link to paper)

  2695. (Menu for Steinhöfel) All papers - Full papers - Abstracts - Selected papers

    Sterna

  2696. Sterna, M (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
  2697. Sterna, M (2009) Scheduling policy for on-line translation service, 266--276 (Full Paper) (link to paper)
  2698. Sterna, M (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)

  2699. (Menu for Sterna) All papers - Full papers - Abstracts - Selected papers

    Stidsen

  2700. Stidsen, T.R (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
  2701. Stidsen, T.R (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)
  2702. Stidsen, T. R (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)

  2703. (Menu for Stidsen) All papers - Full papers - Abstracts - Selected papers

    Stockwell-Alpert

  2704. Stockwell-Alpert, E (2015) Fairness in employee scheduling, 687--698 (Abstract) (link to paper)

  2705. (Menu for Stockwell-Alpert) All papers - Full papers - Abstracts - Selected papers

    Stolp

  2706. Stolp, S (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  2707. (Menu for Stolp) All papers - Full papers - Abstracts - Selected papers

    Stromberg

  2708. Stromberg, A-B. (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  2709. (Menu for Stromberg) All papers - Full papers - Abstracts - Selected papers

    Strusevich

  2710. Strusevich, V (2013) Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product, 577--579 (Abstract) (link to paper)

  2711. (Menu for Strusevich) All papers - Full papers - Abstracts - Selected papers

    Stutzle

  2712. Stutzle, T (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  2713. (Menu for Stutzle) All papers - Full papers - Abstracts - Selected papers

    Stølevik

  2714. Stølevik, M (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)

  2715. (Menu for Stølevik) All papers - Full papers - Abstracts - Selected papers

    Sucha

  2716. Sucha, P (2011) Flow Shop Scheduling on GPU, 532--535 (Abstract) (link to paper)
  2717. Sucha, P (2007) Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors, 463--470 (Full Paper) (link to paper)
  2718. Sucha, P (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
  2719. Sucha, P (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
  2720. Sucha, P (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
  2721. Sucha, P (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
  2722. Sucha, P (2009) Time Symmetry of Project Scheduling with Time Windows and Take-give Resources, 239--253 (Full Paper) (link to paper)
  2723. Sucha, P (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)

  2724. (Menu for Sucha) All papers - Full papers - Abstracts - Selected papers

    Sucu

  2725. Sucu, S (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  2726. (Menu for Sucu) All papers - Full papers - Abstracts - Selected papers

    Sugiyama

  2727. Sugiyama, T (2013) Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems, 65--79 (Full Paper) (link to paper)

  2728. (Menu for Sugiyama) All papers - Full papers - Abstracts - Selected papers

    Suleman

  2729. Suleman, M. O (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  2730. Suleman, M.O (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  2731. (Menu for Suleman) All papers - Full papers - Abstracts - Selected papers

    Sumbera

  2732. Sumbera, M (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)
  2733. Sumbera, M (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)

  2734. (Menu for Sumbera) All papers - Full papers - Abstracts - Selected papers

    Sun

  2735. Sun, Y (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)

  2736. (Menu for Sun) All papers - Full papers - Abstracts - Selected papers

    Sung

  2737. Sung, C.S (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  2738. (Menu for Sung) All papers - Full papers - Abstracts - Selected papers

    Sviridenko

  2739. Sviridenko, M (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)
  2740. Sviridenko, M. (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  2741. (Menu for Sviridenko) All papers - Full papers - Abstracts - Selected papers

    Sy

  2742. Sy, C. (2014) A resilience optimization approach for workforce-inventory control dynamics under uncertainty, 427--444 (Selected Paper) (link to paper)
  2743. Sy, C. L (2011) Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning, 394--407 (Full Paper) (link to paper)

  2744. (Menu for Sy) All papers - Full papers - Abstracts - Selected papers

    Sys

  2745. Sys, T (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)

  2746. (Menu for Sys) All papers - Full papers - Abstracts - Selected papers

    Szczerbicka

  2747. Szczerbicka, H (2007) Evaluating Online Scheduling Techniques in Uncertain Environments, 471--479 (Full Paper) (link to paper)

  2748. (Menu for Szczerbicka) All papers - Full papers - Abstracts - Selected papers

    Sánchez

  2749. Sánchez, A (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)

  2750. (Menu for Sánchez) All papers - Full papers - Abstracts - Selected papers

    Sørensen

  2751. Sørensen, M (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
  2752. Sørensen, M (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)

  2753. (Menu for Sørensen) All papers - Full papers - Abstracts - Selected papers

    T'kindt

  2754. T'kindt, V. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)
  2755. T'kindt, V (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)
  2756. T'kindt, V (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)

  2757. (Menu for T'kindt) All papers - Full papers - Abstracts - Selected papers

    Tan

  2758. Tan, Y (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)
  2759. Tan, Y (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)
  2760. Tan, Yi (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)

  2761. (Menu for Tan) All papers - Full papers - Abstracts - Selected papers

    Tanaka

  2762. Tanaka, S (2007) An Exact Algorithm for Single-Machine Scheduling without Idle Time, 614--617 (Abstract) (link to paper)
  2763. Tanaka, S (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)
  2764. Tanaka, S (2009) An exact algorithm for the precedence-constrained single-machine scheduling problem, 216--226 (Full Paper) (link to paper)
  2765. Tanaka, S (2013) The single-machine scheduling problem with a finite capacity input buffer, 171--184 (Full Paper) (link to paper)

  2766. (Menu for Tanaka) All papers - Full papers - Abstracts - Selected papers

    Tang

  2767. Tang, L (2003) A Lagrangian Relaxation Method for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks to Minimize Total Weighted Completion Time, 638--655 (Full Paper) (link to paper)

  2768. (Menu for Tang) All papers - Full papers - Abstracts - Selected papers

    Tanrisever

  2769. Tanrisever, F (2008) Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem, 5--24 (Selected Paper) (link to paper)
  2770. Tanrisever, F (2005) Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing, 334--334 (Abstract) (link to paper)

  2771. (Menu for Tanrisever) All papers - Full papers - Abstracts - Selected papers

    Tarasevich

  2772. Tarasevich, A. A (2005) Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem, 132--139 (Full Paper) (link to paper)

  2773. (Menu for Tarasevich) All papers - Full papers - Abstracts - Selected papers

    Tavakkoli-Moghaddam

  2774. Tavakkoli-Moghaddam, R (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  2775. (Menu for Tavakkoli-Moghaddam) All papers - Full papers - Abstracts - Selected papers

    Tayur

  2776. Tayur, S (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
  2777. Tayur, S (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)

  2778. (Menu for Tayur) All papers - Full papers - Abstracts - Selected papers

    Tchernev

  2779. Tchernev, N (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)
  2780. Tchernev, N (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)

  2781. (Menu for Tchernev) All papers - Full papers - Abstracts - Selected papers

    Tchikou

  2782. Tchikou, H (2007) Scheduling with Special Case of Multipurpose Machines, 88--95 (Full Paper) (link to paper)

  2783. (Menu for Tchikou) All papers - Full papers - Abstracts - Selected papers

    Tchomt´e

  2784. Tchomt´e, S. K. (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)

  2785. (Menu for Tchomt´e) All papers - Full papers - Abstracts - Selected papers

    Tereso

  2786. Tereso, A. P. (2013) Scheduling with MS Project: an add-in, 707--710 (Abstract) (link to paper)

  2787. (Menu for Tereso) All papers - Full papers - Abstracts - Selected papers

    Tezel

  2788. Tezel, B (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  2789. (Menu for Tezel) All papers - Full papers - Abstracts - Selected papers

    Thomas

  2790. Thomas, M (2007) Evaluating Online Scheduling Techniques in Uncertain Environments, 471--479 (Full Paper) (link to paper)

  2791. (Menu for Thomas) All papers - Full papers - Abstracts - Selected papers

    Thompson

  2792. Thompson, J (2011) An Exact and Heuristic Hybrid for Solving a Medical Student Scheduling Problem, 584--586 (Abstract) (link to paper)
  2793. Thompson, J (2009) Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling, 718--719 (Abstract) (link to paper)

  2794. (Menu for Thompson) All papers - Full papers - Abstracts - Selected papers

    Thornblad

  2795. Thornblad, K (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  2796. (Menu for Thornblad) All papers - Full papers - Abstracts - Selected papers

    Tiwari

  2797. Tiwari, A (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  2798. (Menu for Tiwari) All papers - Full papers - Abstracts - Selected papers

    To?olo

  2799. To?olo, T. A.M (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
  2800. To?olo, T.A M (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
  2801. To?olo, T. A.M (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
  2802. To?olo, T. A.M (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
  2803. To?olo, T.A.M (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)

  2804. (Menu for To?olo) All papers - Full papers - Abstracts - Selected papers

    Toffolo

  2805. Toffolo, T. A. M (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)

  2806. (Menu for Toffolo) All papers - Full papers - Abstracts - Selected papers

    Torres

  2807. Torres, S (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  2808. (Menu for Torres) All papers - Full papers - Abstracts - Selected papers

    Touati

  2809. Touati, S-A. (2007) Optimal and Approximate Periodic Task Scheduling with Storage Requirement Minimization, 480--489 (Full Paper) (link to paper)

  2810. (Menu for Touati) All papers - Full papers - Abstracts - Selected papers

    Toussaint

  2811. Toussaint, H (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)

  2812. (Menu for Toussaint) All papers - Full papers - Abstracts - Selected papers

    Tran

  2813. Tran, T. T (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
  2814. Tran, T. H. (2011) A water-flow algorithm for flexible flow shop scheduling with intermediate buffers, 483--500 (Selected Paper) (link to paper)

  2815. (Menu for Tran) All papers - Full papers - Abstracts - Selected papers

    Trautmann

  2816. Trautmann, N (2014) A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 621--629 (Selected Paper) (link to paper)
  2817. Trautmann, N (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)
  2818. Trautmann, N (2011) Minimizing changeover times of a make-and-pack production process: model and case study, 539--541 (Abstract) (link to paper)
  2819. Trautmann, N (2015) A list-scheduling approach for the planning of assessment centers, 541--554 (Full Paper) (link to paper)
  2820. Trautmann, N (2011) An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 137--145 (Full Paper) (link to paper)
  2821. Trautmann, N (2007) Large-Scale Short-Term Planning in Chemical Batch Production, 490--497 (Full Paper) (link to paper)
  2822. Trautmann, N (2009) A cyclic approach to large-scale short-term planning in chemical batch production, 595--606 (Selected Paper) (link to paper)

  2823. (Menu for Trautmann) All papers - Full papers - Abstracts - Selected papers

    Trietsch

  2824. Trietsch, D (2011) Three heuristic procedures for the stochastic, two-machine flow shop problem, 445--454 (Selected Paper) (link to paper)
  2825. Trietsch, D (2009) Three Heuristic Procedures for the Stochastic Flow Shop Problem, 330--340 (Full Paper) (link to paper)

  2826. (Menu for Trietsch) All papers - Full papers - Abstracts - Selected papers

    Triki

  2827. Triki, C (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)

  2828. (Menu for Triki) All papers - Full papers - Abstracts - Selected papers

    Trystram

  2829. Trystram, D. (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
  2830. Trystram, D. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  2831. (Menu for Trystram) All papers - Full papers - Abstracts - Selected papers

    Tsang

  2832. Tsang, E.P.K (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
  2833. Tsang, E. P.K (2011) Empowerment scheduling for a field workforce, 639--654 (Selected Paper) (link to paper)
  2834. Tsang, E. P. K (2005) Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling, 677--692 (Full Paper) (link to paper)
  2835. Tsang, E (2009) Empowerment-based Workforce Scheduling Problem, 130--144 (Full Paper) (link to paper)

  2836. (Menu for Tsang) All papers - Full papers - Abstracts - Selected papers

    Tuong

  2837. Tuong, N. H. (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)

  2838. (Menu for Tuong) All papers - Full papers - Abstracts - Selected papers

    Turabieh

  2839. Turabieh, H (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)

  2840. (Menu for Turabieh) All papers - Full papers - Abstracts - Selected papers

    Turetsky

  2841. Turetsky, V (2015) Optimal schedule of a statistical process control with a nonlinear expected loss, 42--54 (Full Paper) (link to paper)

  2842. (Menu for Turetsky) All papers - Full papers - Abstracts - Selected papers

    Turky

  2843. Turky, A. M (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)

  2844. (Menu for Turky) All papers - Full papers - Abstracts - Selected papers

    Tuza

  2845. Tuza, Z (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)

  2846. (Menu for Tuza) All papers - Full papers - Abstracts - Selected papers

    T’Kindt

  2847. T’Kindt, V (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
  2848. T’Kindt, V (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)

  2849. (Menu for T’Kindt) All papers - Full papers - Abstracts - Selected papers

    T’kindt

  2850. T’kindt, V (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
  2851. T’kindt, V (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
  2852. T’kindt, V (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)
  2853. T’kindt, V (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)
  2854. T’kindt, V (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)
  2855. T’kindt, V (2015) A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem, 704--707 (Abstract) (link to paper)
  2856. T’kindt, V (2005) Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria, 123--131 (Full Paper) (link to paper)

  2857. (Menu for T’kindt) All papers - Full papers - Abstracts - Selected papers

    Uchronski

  2858. Uchronski, M. (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)

  2859. (Menu for Uchronski) All papers - Full papers - Abstracts - Selected papers

    Uhlig

  2860. Uhlig, T (2011) A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing, 459--468 (Full Paper) (link to paper)

  2861. (Menu for Uhlig) All papers - Full papers - Abstracts - Selected papers

    Urli

  2862. Urli, T. (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)

  2863. (Menu for Urli) All papers - Full papers - Abstracts - Selected papers

    Urosevic

  2864. Urosevic, D (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  2865. (Menu for Urosevic) All papers - Full papers - Abstracts - Selected papers

    Urrutia

  2866. Urrutia, S (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)
  2867. Urrutia, S (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)
  2868. Urrutia, S (2011) A GRASP Heuristic to the Extended Car Sequencing Problem, 366--373 (Full Paper) (link to paper)

  2869. (Menu for Urrutia) All papers - Full papers - Abstracts - Selected papers

    Uyar

  2870. Uyar, A. S. (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)

  2871. (Menu for Uyar) All papers - Full papers - Abstracts - Selected papers

    Vaandrager

  2872. Vaandrager, F (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)

  2873. (Menu for Vaandrager) All papers - Full papers - Abstracts - Selected papers

    Vaclav?k

  2874. Vaclav?k, R (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)

  2875. (Menu for Vaclav?k) All papers - Full papers - Abstracts - Selected papers

    Vakhania

  2876. Vakhania, N (2005) New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling, 606--629 (Full Paper) (link to paper)
  2877. Vakhania, N (2008) On the geometry, preemptions and complexity of multiprocessor and shop scheduling, 183--213 (Selected Paper) (link to paper)
  2878. Vakhania, N (2011) Minimizing the maximal lateness on a single-machine: a new polynomially solvable case, 230--239 (Full Paper) (link to paper)
  2879. Vakhania, N (2009) Scheduling jobs with release times preemptively on a single machine to minimize the number of late jobs, 389--398 (Full Paper) (link to paper)
  2880. Vakhania, N (2009) An effcient implicit enumeration for scheduling equal-length jobs with release times on a single processor to maximize throughput, 366--377 (Full Paper) (link to paper)

  2881. (Menu for Vakhania) All papers - Full papers - Abstracts - Selected papers

    Valero-Herrero

  2882. Valero-Herrero, M (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)

  2883. (Menu for Valero-Herrero) All papers - Full papers - Abstracts - Selected papers

    Valhondo

  2884. Valhondo, J. B. (2007) Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations, 550--552 (Abstract) (link to paper)

  2885. (Menu for Valhondo) All papers - Full papers - Abstracts - Selected papers

    Valouxis

  2886. Valouxis, C (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  2887. (Menu for Valouxis) All papers - Full papers - Abstracts - Selected papers

    Van Hentenryck

  2888. Van Hentenryck, P (2007) Online Stochastic Routing and Scheduling, 41--41 (Abstract) (link to paper)

  2889. (Menu for Van Hentenryck) All papers - Full papers - Abstracts - Selected papers

    Van Hui

  2890. Van Hui, Y (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)

  2891. (Menu for Van Hui) All papers - Full papers - Abstracts - Selected papers

    Van Marcke

  2892. Van Marcke, K (2015) Scheduling the operation of a phosphate pipeline for OCP: A Case Study, 622--625 (Abstract) (link to paper)

  2893. (Menu for Van Marcke) All papers - Full papers - Abstracts - Selected papers

    Van Peteghem

  2894. Van Peteghem, V (2007) An Efficient Heuristic Procedure for the Resource Availability Cost Problem, 618--620 (Abstract) (link to paper)

  2895. (Menu for Van Peteghem) All papers - Full papers - Abstracts - Selected papers

    Van Vreckem

  2896. Van Vreckem, B (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)
  2897. Van Vreckem, B (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)

  2898. (Menu for Van Vreckem) All papers - Full papers - Abstracts - Selected papers

    Van de Vonder

  2899. Van de Vonder, S (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)
  2900. Van de Vonder, S (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)

  2901. (Menu for Van de Vonder) All papers - Full papers - Abstracts - Selected papers

    Vancroonenburg

  2902. Vancroonenburg, W (2013) Extending the late acceptance metaheuristic for multi-objective optimization, 652--655 (Abstract) (link to paper)
  2903. Vancroonenburg, W (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  2904. Vancroonenburg, W. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
  2905. Vancroonenburg, W (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)

  2906. (Menu for Vancroonenburg) All papers - Full papers - Abstracts - Selected papers

    Vanden Berghe

  2907. Vanden Berghe, G (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
  2908. Vanden Berghe, G (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
  2909. Vanden Berghe, G (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
  2910. Vanden Berghe, G (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
  2911. Vanden Berghe, G (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
  2912. Vanden Berghe, G (2013) A heuristic approach to an integrated personnel rostering and task assignment problem, 664--666 (Abstract) (link to paper)
  2913. Vanden Berghe, G (2015) Variable neighbourhood search for rich personnel rostering problems, 928--930 (Abstract) (link to paper)
  2914. Vanden Berghe, G (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
  2915. Vanden Berghe, G (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
  2916. Vanden Berghe, G (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
  2917. Vanden Berghe, G (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
  2918. Vanden Berghe, G (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  2919. Vanden Berghe, G (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
  2920. Vanden Berghe, G. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
  2921. Vanden Berghe, G (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)
  2922. Vanden Berghe, G (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
  2923. Vanden Berghe, G (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
  2924. Vanden Berghe, G (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)

  2925. (Menu for Vanden Berghe) All papers - Full papers - Abstracts - Selected papers

    Vanderbeck

  2926. Vanderbeck, F (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)
  2927. Vanderbeck, F (2007) Inventory Routing Problem Solved by Heuristic Based on Column Generation, 361--367 (Full Paper) (link to paper)

  2928. (Menu for Vanderbeck) All papers - Full papers - Abstracts - Selected papers

    Vanhoucke

  2929. Vanhoucke, M (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
  2930. Vanhoucke, M (2008) Comparison and hybridization of crossover operators for the nurse scheduling problem, 333--353 (Selected Paper) (link to paper)
  2931. Vanhoucke, M (2009) Reactive Nurse Scheduling in Hospitals, 690--692 (Abstract) (link to paper)
  2932. Vanhoucke, M (2007) An Efficient Heuristic Procedure for the Resource Availability Cost Problem, 618--620 (Abstract) (link to paper)
  2933. Vanhoucke, M (2005) An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem, 410--411 (Abstract) (link to paper)
  2934. Vanhoucke, M (2007) A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences, 588--590 (Abstract) (link to paper)

  2935. (Menu for Vanhoucke) All papers - Full papers - Abstracts - Selected papers

    Vansteenwegen

  2936. Vansteenwegen, P (2013) An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem, 659--663 (Abstract) (link to paper)
  2937. Vansteenwegen, P (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)

  2938. (Menu for Vansteenwegen) All papers - Full papers - Abstracts - Selected papers

    Varadarajan

  2939. Varadarajan, A (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)

  2940. (Menu for Varadarajan) All papers - Full papers - Abstracts - Selected papers

    Varela

  2941. Varela, L (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)
  2942. Varela, L (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)

  2943. (Menu for Varela) All papers - Full papers - Abstracts - Selected papers

    Vazacopoulos

  2944. Vazacopoulos, A (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)

  2945. (Menu for Vazacopoulos) All papers - Full papers - Abstracts - Selected papers

    Velten

  2946. Velten, S. (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)

  2947. (Menu for Velten) All papers - Full papers - Abstracts - Selected papers

    Verbeeck

  2948. Verbeeck, C (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)
  2949. Verbeeck, K (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)

  2950. (Menu for Verbeeck) All papers - Full papers - Abstracts - Selected papers

    Verbeke

  2951. Verbeke, B (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)

  2952. (Menu for Verbeke) All papers - Full papers - Abstracts - Selected papers

    Vergados

  2953. Vergados, D. J (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  2954. (Menu for Vergados) All papers - Full papers - Abstracts - Selected papers

    Verstichel

  2955. Verstichel, J. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  2956. (Menu for Verstichel) All papers - Full papers - Abstracts - Selected papers

    Vespucci

  2957. Vespucci, M. T (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  2958. (Menu for Vespucci) All papers - Full papers - Abstracts - Selected papers

    Vianna

  2959. Vianna, D. S. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)

  2960. (Menu for Vianna) All papers - Full papers - Abstracts - Selected papers

    Vidal-Carreras

  2961. Vidal-Carreras, P.I (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)

  2962. (Menu for Vidal-Carreras) All papers - Full papers - Abstracts - Selected papers

    Vieira

  2963. Vieira, P. S. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)

  2964. (Menu for Vieira) All papers - Full papers - Abstracts - Selected papers

    Vigo

  2965. Vigo, D (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)

  2966. (Menu for Vigo) All papers - Full papers - Abstracts - Selected papers

    Vilcot

  2967. Vilcot, G (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  2968. (Menu for Vilcot) All papers - Full papers - Abstracts - Selected papers

    Virginas

  2969. Virginas, B (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  2970. (Menu for Virginas) All papers - Full papers - Abstracts - Selected papers

    Visentini

  2971. Visentini, M. S (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  2972. (Menu for Visentini) All papers - Full papers - Abstracts - Selected papers

    Vlk

  2973. Vlk, M (2015) Resource Failure Recovery in Production Scheduling, 852--858 (Abstract) (link to paper)
  2974. Vlk, M (2005) Multi-Criteria Soft Constraints in Timetabling, 11--15 (Abstract) (link to paper)

  2975. (Menu for Vlk) All papers - Full papers - Abstracts - Selected papers

    Volk

  2976. Volk, R (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)

  2977. (Menu for Volk) All papers - Full papers - Abstracts - Selected papers

    Voros

  2978. Voros, N (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  2979. (Menu for Voros) All papers - Full papers - Abstracts - Selected papers

    Voudouris

  2980. Voudouris, C (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
  2981. Voudouris, C (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  2982. (Menu for Voudouris) All papers - Full papers - Abstracts - Selected papers

    Vázquez-Rodriguez

  2983. Vázquez-Rodriguez, J. A (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  2984. (Menu for Vázquez-Rodriguez) All papers - Full papers - Abstracts - Selected papers

    Wachtel

  2985. Wachtel, G (2015) Floating Patients method based on scheduling algorithm for emergency department's service improvement, 683--686 (Abstract) (link to paper)

  2986. (Menu for Wachtel) All papers - Full papers - Abstracts - Selected papers

    Walcarius

  2987. Walcarius, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  2988. (Menu for Walcarius) All papers - Full papers - Abstracts - Selected papers

    Walker

  2989. Walker, S (2013) New Solvable Cases of the Maximum Lateness Problem with Preemptions, 714--717 (Abstract) (link to paper)

  2990. (Menu for Walker) All papers - Full papers - Abstracts - Selected papers

    Wallace

  2991. Wallace, S. W (2011) Facility layout with random demand: A reduction to the classical deterministic QAP, 605--606 (Abstract) (link to paper)
  2992. Wallace, S. W (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)

  2993. (Menu for Wallace) All papers - Full papers - Abstracts - Selected papers

    Wallenius

  2994. Wallenius, J (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  2995. (Menu for Wallenius) All papers - Full papers - Abstracts - Selected papers

    Wan

  2996. Wan, G (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)

  2997. (Menu for Wan) All papers - Full papers - Abstracts - Selected papers

    Wang

  2998. Wang, J (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
  2999. Wang, Z (2008) Performance of service policies in a specialized service system with parallel servers, 451--460 (Selected Paper) (link to paper)
  3000. Wang, G (2003) Customer Order Scheduling to Minimize Total Weighted Completion Time, 409--416 (Abstract) (link to paper)
  3001. Wang, Y (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)
  3002. Wang, Z (2005) Worst-case Analysis for Queueing Service Policies, 533--535 (Abstract) (link to paper)
  3003. Wang, C (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  3004. (Menu for Wang) All papers - Full papers - Abstracts - Selected papers

    Wanka

  3005. Wanka, R (2013) A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality, 300--313 (Full Paper) (link to paper)

  3006. (Menu for Wanka) All papers - Full papers - Abstracts - Selected papers

    Warichet

  3007. Warichet, F (2007) A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant, 621--624 (Abstract) (link to paper)

  3008. (Menu for Warichet) All papers - Full papers - Abstracts - Selected papers

    Watson

  3009. Watson, J-P. (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)
  3010. Watson, J-P. (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)

  3011. (Menu for Watson) All papers - Full papers - Abstracts - Selected papers

    Wauters

  3012. Wauters, T (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
  3013. Wauters, T. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
  3014. Wauters, T (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
  3015. Wauters, T (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
  3016. Wauters, T (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  3017. Wauters, T (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
  3018. Wauters, T (2013) Extending the late acceptance metaheuristic for multi-objective optimization, 652--655 (Abstract) (link to paper)

  3019. (Menu for Wauters) All papers - Full papers - Abstracts - Selected papers

    Weedon

  3020. Weedon, R (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)
  3021. Weedon, R (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)

  3022. (Menu for Weedon) All papers - Full papers - Abstracts - Selected papers

    Weeks

  3023. Weeks, K. O (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  3024. (Menu for Weeks) All papers - Full papers - Abstracts - Selected papers

    Wei

  3025. Wei, W (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)

  3026. (Menu for Wei) All papers - Full papers - Abstracts - Selected papers

    Weil

  3027. Weil, G (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  3028. (Menu for Weil) All papers - Full papers - Abstracts - Selected papers

    Weng

  3029. Weng, F.C (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)

  3030. (Menu for Weng) All papers - Full papers - Abstracts - Selected papers

    Werbos

  3031. Werbos, L (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  3032. (Menu for Werbos) All papers - Full papers - Abstracts - Selected papers

    Werner

  3033. Werner, F (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
  3034. Werner, F (2011) Parallel machine problems with equal processing times: a survey, 435--444 (Selected Paper) (link to paper)
  3035. Werner, F (2009) Parallel Machine Problems with Equal Processing Times, 458--468 (Full Paper) (link to paper)

  3036. (Menu for Werner) All papers - Full papers - Abstracts - Selected papers

    Westphal

  3037. Westphal, S (2005) Improved Pruningin Columngeneration Of A Vehicle Routing Problem, 705--722 (Full Paper) (link to paper)
  3038. Westphal, S (2008) Pruning in column generation for service vehicle dispatching, 355--371 (Selected Paper) (link to paper)

  3039. (Menu for Westphal) All papers - Full papers - Abstracts - Selected papers

    White

  3040. White, G. M (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)

  3041. (Menu for White) All papers - Full papers - Abstracts - Selected papers

    Whitley

  3042. Whitley, L. D (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
  3043. Whitley, D (2011) Quasi-Elementary Landscapes, 113--125 (Full Paper) (link to paper)
  3044. Whitley, L. D (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)
  3045. Whitley, D (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)

  3046. (Menu for Whitley) All papers - Full papers - Abstracts - Selected papers

    Wilke

  3047. Wilke, P (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)

  3048. (Menu for Wilke) All papers - Full papers - Abstracts - Selected papers

    Williamson

  3049. Williamson, E (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  3050. (Menu for Williamson) All papers - Full papers - Abstracts - Selected papers

    Wilmer

  3051. Wilmer, D (2015) Robustness of Partial Order Schedules: Understanding the Chaining algorithm, 457--472 (Full Paper) (link to paper)

  3052. (Menu for Wilmer) All papers - Full papers - Abstracts - Selected papers

    Wilson

  3053. Wilson, N (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)
  3054. Wilson, M (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)

  3055. (Menu for Wilson) All papers - Full papers - Abstracts - Selected papers

    Winter

  3056. Winter, E (2007) Computing Lower Bounds for the Schedule of a Multifunction Radar, 523--530 (Full Paper) (link to paper)

  3057. (Menu for Winter) All papers - Full papers - Abstracts - Selected papers

    Witteveen

  3058. Witteveen, C (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
  3059. Witteveen, C (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)

  3060. (Menu for Witteveen) All papers - Full papers - Abstracts - Selected papers

    Wodecki

  3061. Wodecki, M (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)
  3062. Wodecki, M (2007) A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times, 96--103 (Full Paper) (link to paper)

  3063. (Menu for Wodecki) All papers - Full papers - Abstracts - Selected papers

    Woeginger

  3064. Woeginger, G. J (2005) Formulations, Relaxations, Approximations and Gaps in the World of Scheduling, 19--36 (Selected Paper) (link to paper)
  3065. Woeginger, G. J (2003) Formulations, Relaxations, Approximations, and Gaps in the World of Scheduling, 21--41 (Full Paper) (link to paper)

  3066. (Menu for Woeginger) All papers - Full papers - Abstracts - Selected papers

    Wong

  3067. Wong, R. C.W (2005) Timetable Synchronization for Mass Transit, 516--517 (Abstract) (link to paper)

  3068. (Menu for Wong) All papers - Full papers - Abstracts - Selected papers

    Wren

  3069. Wren, A (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  3070. (Menu for Wren) All papers - Full papers - Abstracts - Selected papers

    Wright

  3071. Wright, M (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
  3072. Wright, M.B (2003) Dynamic Weight Variation in Metaheuristic Search, 604--605 (Abstract) (link to paper)

  3073. (Menu for Wright) All papers - Full papers - Abstracts - Selected papers

    Wu

  3074. Wu, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)

  3075. (Menu for Wu) All papers - Full papers - Abstracts - Selected papers

    Xie

  3076. Xie, L (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  3077. (Menu for Xie) All papers - Full papers - Abstracts - Selected papers

    Xing

  3078. Xing, W (2008) Performance of service policies in a specialized service system with parallel servers, 451--460 (Selected Paper) (link to paper)
  3079. Xing, W (2005) Worst-case Analysis for Queueing Service Policies, 533--535 (Abstract) (link to paper)

  3080. (Menu for Xing) All papers - Full papers - Abstracts - Selected papers

    Xu

  3081. Xu, Y (2009) A GRASP approach for the delay-constrained multicast routing problem, 93--104 (Full Paper) (link to paper)
  3082. Xu, H (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)

  3083. (Menu for Xu) All papers - Full papers - Abstracts - Selected papers

    Yadrentsev

  3084. Yadrentsev, D (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  3085. (Menu for Yadrentsev) All papers - Full papers - Abstracts - Selected papers

    Yang

  3086. Yang, W (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
  3087. Yang, J (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
  3088. Yang, S (2011) A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling, 617--637 (Selected Paper) (link to paper)
  3089. Yang, W (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)
  3090. Yang, We (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
  3091. Yang, Z (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
  3092. Yang, Y (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
  3093. Yang, S (2009) A Guided Search Genetic Algorithm for the University Course Timetabling Problem, 180--191 (Full Paper) (link to paper)

  3094. (Menu for Yang) All papers - Full papers - Abstracts - Selected papers

    Yao

  3095. Yao, R. He. F (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)

  3096. (Menu for Yao) All papers - Full papers - Abstracts - Selected papers

    Yedision

  3097. Yedision, L (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)

  3098. (Menu for Yedision) All papers - Full papers - Abstracts - Selected papers

    Yomsi

  3099. Yomsi, P. M (2009) Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time, 843--851 (Abstract) (link to paper)

  3100. (Menu for Yomsi) All papers - Full papers - Abstracts - Selected papers

    Yong

  3101. Yong, Y (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)

  3102. (Menu for Yong) All papers - Full papers - Abstracts - Selected papers

    Yoon

  3103. Yoon, S.H (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  3104. (Menu for Yoon) All papers - Full papers - Abstracts - Selected papers

    Youssef

  3105. Youssef, B. Be (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)

  3106. (Menu for Youssef) All papers - Full papers - Abstracts - Selected papers

    Yuan

  3107. Yuan, Z (2015) Home Health Care Scheduling: A Case Study, 555--569 (Full Paper) (link to paper)

  3108. (Menu for Yuan) All papers - Full papers - Abstracts - Selected papers

    Yucel

  3109. Yucel, E (2005) A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates, 162--168 (Full Paper) (link to paper)

  3110. (Menu for Yucel) All papers - Full papers - Abstracts - Selected papers

    Yugma

  3111. Yugma, C (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
  3112. Yugma, C (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)
  3113. Yugma, C (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
  3114. Yugma, C (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)
  3115. Yugma, C (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
  3116. Yugma, C. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
  3117. Yugma, C (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)

  3118. (Menu for Yugma) All papers - Full papers - Abstracts - Selected papers

    Zajicek

  3119. Zajicek, T (2011) Flow Shop Scheduling on GPU, 532--535 (Abstract) (link to paper)

  3120. (Menu for Zajicek) All papers - Full papers - Abstracts - Selected papers

    Zdenek

  3121. Zdenek, H (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)

  3122. (Menu for Zdenek) All papers - Full papers - Abstracts - Selected papers

    Zeltzer

  3123. Zeltzer, L (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)

  3124. (Menu for Zeltzer) All papers - Full papers - Abstracts - Selected papers

    Zemmouri

  3125. Zemmouri, T (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  3126. (Menu for Zemmouri) All papers - Full papers - Abstracts - Selected papers

    Zerola

  3127. Zerola, M (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)

  3128. (Menu for Zerola) All papers - Full papers - Abstracts - Selected papers

    Zhang

  3129. Zhang, J (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
  3130. Zhang, R (2007) Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains, 447--454 (Full Paper) (link to paper)
  3131. Zhang, P. Y (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
  3132. Zhang, Q (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  3133. Zhang, R (2009) Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, 565--574 (Selected Paper) (link to paper)
  3134. Zhang, X (2007) Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*, 538--545 (Full Paper) (link to paper)
  3135. Zhang, A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  3136. (Menu for Zhang) All papers - Full papers - Abstracts - Selected papers

    Zhao

  3137. Zhao, Y (2008) Integrated scheduling of handling equipment at automated container terminals, 373--394 (Selected Paper) (link to paper)
  3138. Zhao, H (2005) Scheduling Algorithms for Master-Slave System, 501--513 (Full Paper) (link to paper)
  3139. Zhao, H (2008) Scheduling problems in master-slave model, 215--231 (Selected Paper) (link to paper)
  3140. Zhao, Y (2011) Facility layout with random demand: A reduction to the classical deterministic QAP, 605--606 (Abstract) (link to paper)

  3141. (Menu for Zhao) All papers - Full papers - Abstracts - Selected papers

    Zhaoa

  3142. Zhaoa, Y (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)

  3143. (Menu for Zhaoa) All papers - Full papers - Abstracts - Selected papers

    Zhou

  3144. Zhou, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)

  3145. (Menu for Zhou) All papers - Full papers - Abstracts - Selected papers

    Zigrino

  3146. Zigrino, S (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  3147. (Menu for Zigrino) All papers - Full papers - Abstracts - Selected papers

    Zimmermann

  3148. Zimmermann, A (2015) A list-scheduling approach for the planning of assessment centers, 541--554 (Full Paper) (link to paper)
  3149. Zimmermann, J (2007) Medium-Term Production and Staff Planning in the Automotive Industry, 209--216 (Full Paper) (link to paper)
  3150. Zimmermann, J (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)
  3151. Zimmermann, J (2009) Exact methods for the resource levelling problem, 811--820 (Abstract) (link to paper)

  3152. (Menu for Zimmermann) All papers - Full papers - Abstracts - Selected papers

    Zinder

  3153. Zinder, Y (2005) Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time, 83--109 (Selected Paper) (link to paper)
  3154. Zinder, Y (2013) New Solvable Cases of the Maximum Lateness Problem with Preemptions, 714--717 (Abstract) (link to paper)
  3155. Zinder, Y (2005) Scheduling UET-UCT task systems under the out-forest precedence constraints, 445--452 (Full Paper) (link to paper)
  3156. Zinder, Y (2005) The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors, 453--470 (Full Paper) (link to paper)
  3157. Zinder, Y (2007) The Strength of Priority Algorithms, 531--537 (Full Paper) (link to paper)
  3158. Zinder, Y (2003) Scheduling with Two Criteria, 468--472 (Abstract) (link to paper)

  3159. (Menu for Zinder) All papers - Full papers - Abstracts - Selected papers

    Zorn

  3160. Zorn, E (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
  3161. Zorn, E (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
  3162. Zorn, E (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)

  3163. (Menu for Zorn) All papers - Full papers - Abstracts - Selected papers

    Zribi

  3164. Zribi, N (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)

  3165. (Menu for Zribi) All papers - Full papers - Abstracts - Selected papers

    Zubaran

  3166. Zubaran, T (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  3167. (Menu for Zubaran) All papers - Full papers - Abstracts - Selected papers

    anhoucke

  3168. anhoucke, V. (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)

  3169. (Menu for anhoucke) All papers - Full papers - Abstracts - Selected papers

    omarudin

  3170. omarudin, K. (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)

  3171. (Menu for omarudin) All papers - Full papers - Abstracts - Selected papers

    Ásgeirsson

  3172. Ásgeirsson, E. I (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)

  3173. (Menu for Ásgeirsson) All papers - Full papers - Abstracts - Selected papers

    Özcan

  3174. Özcan, E (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
  3175. Özcan, E (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)
  3176. Özcan, E (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)
  3177. Özcan, E (2009) Multilevel search for choosing hyper-heuristics, 788--789 (Abstract) (link to paper)
  3178. Özcan, E (2007) A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy, 394--401 (Full Paper) (link to paper)
  3179. Özcan, E (2003) Towards an XML Based Standard for Timetabling Problems: TTML, 566--569 (Abstract) (link to paper)

  3180. (Menu for Özcan) All papers - Full papers - Abstracts - Selected papers